渡河點 的英文怎麼說

中文拼音 [diǎn]
渡河點 英文
crossing river point
  • : Ⅰ動詞1 (由此岸到彼岸;通過) cross (a river the sea etc ) 2 (渡過) tide over; pull through 3 ...
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ名詞1 (液體的小滴) drop (of liquid) 2 (細小的痕跡) spot; dot; speck 3 (漢字的筆畫「、」)...
  • 渡河 : cross a river渡河點 point of crossing; 渡河器材 river crossing equipment; 渡河汽艇 cross river boat
  1. The amounts of limnodrilus hoffmeisteri increased gradually from baihe to huacao section, and reached a peak in huacao section ; species from annelida, mollusca were not found in beixinjing and wuninglu sections ; species from oligochaeta were found and had certain numbers in zhejiang road section as the result of the effect of counterflow of the huangpu river

    1材料與方法1 1采樣斷面及采樣在蘇州上海市區段的上游至下游共設6個采樣斷面,分別是白鶴、黃、華槽、北新涇、武寧路和浙江路斷面。每個采樣斷面又分別設3 - 6個采樣
  2. Abstract : according to the safety evaluation of qiongzhou strait rail - ferry engineering , the construction protocol feasible to the rail - ferry engineering in straits and rivers in china is demonstrated. the relevant safety issues in the design and operation of the rail - ferry port are discussed. the priority issues need to considered and their safety countermeasures should be taken in the design of the project are proposed

    文摘:通過對粵海鐵路通道瓊州海峽鐵路輪工程的安全評價,闡述了適合於我國海峽及內鐵路輪碼頭工程的建設方案,對鐵路輪碼頭工程設計中及運營中可能出現的危險進行了探討和分析,提出了鐵路輪工程安全設計中應重加以考慮的問題和相應的安全措施。
  3. Shortly before ten o clock he came out into an open place opposite the village, and saw the ferryboat lying in the shadow of the trees and the high bank

    將近十鐘的時候,他從樹林里走出來,來到鎮子對面的一塊開闊地,看到船正泊在高高的堤旁下面的樹蔭里。
  4. By analyzing interval flood and cascade operation characteristics of the upstream yellow river basin, the influence of longyangxia reservoir operation mode in different states on gongboxia power station construction during flood period is studied

    分析區間洪水特性和黃上游梯級運行特,針對龍羊峽水庫實際運行狀況,分析不同狀態下的龍庫運行方式對公伯峽水電站的施工汛影響。
  5. Combined with the significant project - gongboxia hydro - power station construction, emphasized on construction during flood period of power station construction period, the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed, some problems in construction during flood period such as flood propagation time, interval flood discharge forecast, construction risk, flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied, with an aim at presenting real interval flood forecast scheme and dispatching method, so as to provide technological support for gongboxia hydro - power station construction period

    本論文結合國家重工程項目?公伯峽水電站的建設,以電站建設期施工汛為研究重,從實施出發,分析黃上游氣候特性和梯級水庫群的實際運行狀況,對施工汛中的主要問題?洪水流達時間、區間洪水預報、汛風險、汛期預警、龍羊峽水庫在汛中的作用等進行了比較全面深入的研究,目的在於提出可用於實際的區間洪水預報方案和調度方法,為公伯峽水電站施工期建設提供技術支撐。
  6. The following day napoleon drove on ahead of the army, reached the niemen, put on a polish uniform in order to inspect the crossing of the river, and rode out on the river bank

    第二天,拿破崙乘坐四輪馬車,越過軍隊,抵達涅曼,為了察看,他換上波蘭制服,來到岸上。
  7. The article analyses the features of the eco - environment in longnan district, which is considered to be the rather special mountain ecological system on the basis of dry valley with the characteristic of transition and tenderness

    摘要分析了隴南山區生態環境的特,認為其是以乾旱谷為基帶的較為特殊的山地生態系統,具有較明顯的過性和敏感性。
  8. Based on the analysis of the temperature test result of the landing rectangle aqueduct of caohe river for the emergency water supply project of the beijing - shijiazhuang section on the middle route of the south - to - north water diversion project, the temperature developing feature of the early - age hydration heat of the thin - wall concrete is described, and then the main effecting factors of the hydration heat temperature on the landing rectangle aqueduct and the control measures concerned are put forward herein

    摘要通過對南水北調中線京石段應急供水工程漕槽段落地矩形槽溫度測試結果的分析,闡述了薄壁混凝土早期水化熱溫度發展的特,提出了影響落地矩形槽水化熱溫度的主要因素與控制措施。
分享友人