測標高 的英文怎麼說

中文拼音 [biāogāo]
測標高 英文
measure of elevation
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • 標高 : [測量學] elevation; level; altitude (飛行); datum mark; height mark
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監工作的前期實驗工作和施工各工況、各節段支模、澆注混凝土后的的結構計算和其理論計算結果之後,詳細論述了主梁的線形控制方法和內容,實際支模的提出,結構應力監控的方法、布點、讀及其對讀數據的合理分析方法,索力檢和結構溫度監的方法。
  2. The littoral zone of a sea is the part of the sea between high and low tide marks.

    海的沿岸地帶是潮的和低潮的之間的海域。
  3. Resurvey the column axis and elevation line, and mark out the column form line, 1 : 2 cement mortar will be used to leveling at the column bottom. “ 井 ” shape rack will be set around each column, and mark elevation control line on it

    將柱軸線、線復投點,彈出柱支模線,將柱腳支模處用1 : 2水泥砂漿找平,每根柱周圍搭設井字架,在井字架上抄測標高控制線。
  4. Standard test method for cathodic disbonding of exterior pipeline coatings at elevated temperatures using interior heating

    用內部加熱溫下外部管道鍍層的陰極斷接的準試驗方法
  5. 3. after studying deeply the multi - antenna sar mtdi based on displaced phase center antenna ( dpca ), a new double - antenna method is proposed which remedies the shortcomings of conventional ways. the method need n ' t meet the constraint condition that conventional ways must meet and can suppress ground clutter effectively and detect moving target

    針對常規dpca方法的缺點創新性的提出了一種新的雙天線動目方法,建立了該方法的檢模型並對該方法進行了有效的驗證,該方法不合成孔什雷達動口和成像研必滿足常規方法所必須滿足的限制條件就能夠進行動目,提了dpca的實用價值。
  6. Gauge hatch series, which are pedal type and set on the tank roof for measuring the oil lever & temperature and also for sampling of the oil in the tank

    量油孔為腳踏式,安裝于油罐頂部,用於量罐內油品的和溫度及取樣等。
  7. The detection limit was 0. 5 ng / ml and the calibration curve was in the range of 0 - 100 ng / ml. the within - run coefficient variations for standard samples were less than 10 %. one distinguished feature of this approach was its nearly homogeneous reaction and solution phase detection, which made the detection rapid and reproducible

    5ng ml ,準曲線范圍為0 - 100ng ml ,檢準樣品的批內cv小於10 ,採用這種液相反應及液相熒光定的方法,提了分析速度。
  8. This paper discusses that two chinese ways of expressing passive meaning - the ideational passives without marked words and the passives with marked words exemplify the principle of quantitative iconicity, and the former express the conventional high - predicted information in simple forms, while the latter express the unconventional low - predicted information in complex forms

    摘要漢語被動含義的表達式無詞項記的意念被動句和有詞項記的常規被動句體現了數量象似原則,前者以簡單的形式表達了規約化的、預的信息,後者以復雜的形式表達了非規約化的、預性低的信息。
  9. Plane curve of setting out top - class highway with the method of polar coodinate

    極坐等級公路的平曲線
  10. When the simulation calculation procedure is applied to the rib - hoisting process of nannidu arch bridge, simplification model suited to the case is established, the pre - rising elevation on the rib - hoisting course is predicted, and real - time control is discussed

    將模擬計算程序應用於南里渡特大橋拱肋吊裝過程,建立了適合現場計算的簡化模型,預了拱肋吊裝階段的預抬,並對吊裝過程進行實時控制。
  11. Standard test methods for measurement of gloss of high - gloss surfaces by abridged goniophotometry

    用簡化濾色角光度計上光表面光澤度的準試驗方法
  12. In view of the defects in gb, a novel method was proposed after many experiments to accurately measure the content of pyrites sulfur derived from coal

    摘要針對國法難以準確定含量達40 %左右的煤系硫鐵礦中硫化鐵硫的不足,通過多次試驗提出一個可以準確含量煤系硫鐵礦中硫化鐵硫的方法。
  13. Standard test method for measuring the quasi - static release moments of alpine ski bindings

    山滑雪板綁帶的準靜態脫扣力矩的準試驗方法
  14. Height location accuracy is calculated, and useful conclusions are given in the end

    最後,計算了目量精度並歸納了其特點,給出了有益的結論。
  15. Standard test method for determining susceptibility to stress - corrosion cracking of 2xxx and 7xxx aluminum alloy products

    強度鋁合金製品應力腐蝕斷裂敏感性的準試驗方法
  16. Standard test method for determination of thermal shock resistance for advanced ceramics by water quenching

    用水淬火法級陶瓷製品耐熱沖擊性的準試驗方法
  17. At the finishing of this paper, the effective identification of designing factors is done and the setting elevation and the cable tension force in next stage are forecasted according to the situation of finished beams. through the forecasting, the constructing state is in coincidence with the designing state. during the bridge construction process, the value of designing parameters are made close to the construction state by means of data collections, optimal controls and detailed analysis of different reasons that caused errors

    最後,根據施工的實際狀態對設計參數進行了有效的識別,並利用灰色理論與預控制相結合的方法,根據已澆梁段的實際狀況對下一施工梁段的立模和斜拉索張拉索力進行預,使施工過程中的受力狀態與已確定的合理施工狀態達到一致。
  18. Its main steps are as follows : ( 1 ) to determine the tensor of hydraulic conductivity of the rock mass near the ground ; ( 2 ) to back - analyzing of stress field ; ( 3 ) to predict the fissure aperture at different levels ; ( 4 ) to suppose the structure of fissure network not to vary with depth and to calculate the tensor of hydraulic conductivity of the wall rock

    其主要思想是,首先確定近地表巖體的滲透張量;根據地應力實資料進行地應力場的量級反演;選擇適當的裂隙開度-應力模型,預不同深度的裂隙開度;在裂隙網路結構不隨深度變化這一假定的基礎上,計算隧道的圍巖滲透性。
  19. A model with some parameters is used to forecasting the beam camber in the construction. based on the differences between the design value and the survey of the bridge deck elevation in constructing the pre - stressed and so on working condition, the model parameters are identified by ann, and the beam camber of different sections are given

    建立施工預拱度的數學模型,根據施工時的預應力張拉后等工況橋面實測標高與設計值的差異,用bp神經網路識別預拱度模型的參數,確定有關各截面的預拱值。
  20. Based on the differences between the design value and the survey of the bridge deck elevation in constructing the pre - stressed long span bridge, the model parameters are identified by the genetic algorithm, and the pre - stress loss values of different sections are given

    建立附加損失的數學模型,根據施工時的預應力張拉后橋面實測標高與設計值的差異,用遺傳演算法識別損失模型的參數,確定有關各截面的損失值。
分享友人