測點 的英文怎麼說

中文拼音 [diǎn]
測點 英文
[地測] station; gauging point; measure point; sight; landmark
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : Ⅰ名詞1 (液體的小滴) drop (of liquid) 2 (細小的痕跡) spot; dot; speck 3 (漢字的筆畫「、」)...
  1. Indicator for working status, level adjusting point and level testing point are on the front panel

    模塊前面板有工作狀態指示燈及電平調整電平檢測點,輸出電平大於108dbuv 。
  2. Single and multiple station carbon monoxide alarms

    測點和多測點一氧化碳報警器
  3. It makes sampling data regularized by means of man - machine interactive mode and procedure method, respectively. the driven data of the cutter guide is generated, which is based on sampling data processed. it proposes an intelligent data reduction algorithm which bases on the combination of straightness of curves, equidistance and distance deviation principle

    首先採集並分析了內輪廓數據,分別運用程序處理方式和人機交互方式實現采樣數據的規則化處理;根據處理后的測點數據生成磨頭驅動數據;並提出了一種基於曲線曲率、等距及距離偏差帶的自適應數據壓縮方法。
  4. By using both the prediction model from transportation ministry and the fhwa models, the prediction results were analyzed for high ways at different sections, different design speeds, detection points, traffic volumes, distances, heights, and at various other road conditions. the prediction results and the actual results were compared and the accuracy of prediction were assessed

    本文通過比較分析了fhwa預模式和交通部預模式在高速公路不同監路段、設計時速、測點、車流量、距離、高差、地面狀況條件下的預結果,並對預結果和實結果進行預精度和變化趨勢的比較研究。
  5. Environment of modern in - situ vibration measurement has become more complex, measurement points increased and the measurement range widened greatly with the coming forth of long, large, tall and flexile structures

    隨著長大高柔結構建築的不斷涌現,現代振動試現場環境更為復雜、測點布設數量更多、測點分佈范圍更廣。
  6. On 4 february 1975, the commune or brigade leading cadres would have obtained information directly or indirectly from six different sources : ( 1 ) the general provincial warning relayed to them through city and county committees, ( 2 ) in the case of yingkou county, an evacuation order from the county committee, ( 3 ) nearby earthquake observatories, particularly the shipengyu observatory, ( 4 ) local amateur precursory monitoring groups such as the team of the haicheng observatory, ( 5 ) neighboring villages and industrial units, and ( 6 ) the foreshocks and the damage they were already causing

    1975年2月4日,公社或大隊領導幹部直接或間接從六個不同的來源獲得信息: ( 1 )通過市級與縣級革委會傳達給他們的總的省一級的警告; ( 2 )在營口的例子中,撤離的命令由縣革委會下達; ( 3 )附近的地震觀站,特別如石硼峪地震觀站的情況; ( 4 )地方的業余前兆檢工作組,如海城地震觀站( 「群測點」 ) ; ( 5 )附近的村莊與企業,與( 6 )前震以及已經造成的損失。
  7. The improvement of hoist coutainer position check point of impored hoister

    提升機提升容器位置檢測點的改進
  8. Because of adopting fixed groundwork, position of every observation station is immovability, agility of instrument is poor, singular fixed stand can not meet the need of modern equipment

    由於採用固定地基的方式,各觀測點的位置不動,儀器設備的機動性差,單一的固定站已不能滿足現代化的裝備要求。
  9. It is difficult point of the design of the new system that directly generated statistic data from the data sources. because that the ability of monitoring of each enterprise of petrochina is different. especially they lack of some monitoring point, and the monitoring frequency is inconformity

    從數據源直接生成統計匯總數據是新系統的設計難和突破口由於股份公司各企業監能力和具體情況懸殊很大,存在監頻率不一致、監測點位不足等問題,使得監測點類別劃分上很困難。
  10. A good effect is made by using the technology of horizontal subarea and building clustered index. in the testing environment on local machine, the response time of outputting 18, 422 pieces of records from the spot data table induing about 28 million pieces of records is about 8 second

    使用水平分區的技術和建立聚集索引的技術取得了較好的效果,在本機試環境中,從測點數據表近2800萬條記錄中輸出匹配量為18422條記錄的時間約為8秒。
  11. Magnetoelectricity gear method is a general torsional oscillation measurement method. it has disadvantages on less measure point and improved - needed dynamic characteristic. in the paper a new method of measuring torsional oscillation of the turbine - generator shaft was proposed on the basis of high speed ccd ( charge coupled device ) photography

    現行的扭振量方法以磁電式齒輪量法為主,這種方法存在測點少,動態特性有待提高的缺,就此本文提出了一種基於高速ccd ( chargecoupleddevice )攝像技術的汽輪發電機組軸系扭振量的新方法。
  12. Venier caliper, metallic ruler, measuring tape, square, center punch, felt point marker pen

    卡鉗,金屬的直尺,捲尺,曲尺,中心沖,感覺測點作記號鋼筆。
  13. The online monitoring is carried out based on the structure - of upper microcomputer and nether microcomputer through patroling the monitoring points of the controlling system of reactor and showing the logical voltage on the monitoring screen

    採用上下位機的方式,通過巡檢cfbr -堆控制系統各監測點的電平狀態,並將巡檢結果顯示在監界面上,實現了系統的在線監
  14. Report of state monitory network in the kaschin - beck disease area, gansu province in

    2000年甘肅省大骨節病國家監測點報告
  15. Little improvement presents with the augment of resolution. ( 2 ) the asymmetric arrangements of measuring sensors cause local error in the identification of moving force. less number of measuring points will reduce the identification accuracy

    ( 2 )測點排布不均勻會引起局部信息的丟失,使識別結果會產生局部較大的誤差,測點數目過少會產生識別精度下降。
  16. Measurement precision contribute to improving the security class and economic of boiler running and automatic level of whole plant. the smart measurement instrument of the boiler ’ s air flow designed in the thesis and the instrument can make the degree of accuracy get to. firstly, the thesis build the “ velocity - area ” method which is on basis of “ log - tchebycheff ” on the analyzing of basic measure method of boiler ’ s air flow. secondly, model86 averaging pitot tube was selected the right model of flow transducer which can pickoff the differential pressure and static pressure. modelc264 which made in setra system corp. u. s. a was selected as ultra low differential pressure transmitter. a good flow of boiler ’ s air was calculated by offsetting pressure and temperature. finally, numeroscope was designed with z80cpu and other chips

    精確的監有助於提高鍋爐燃燒的安全型、經濟性,也有助於提高電廠的整體自動化水平。本文設計的智能化鍋爐風量量裝置能夠實現對鍋爐送風的精確量,精度可達。本文首先研究鍋爐送風矩形大管道量理論,提出在流來流量測點布置基於「對數-切比雪夫」法的速度-面積法。
  17. These temporary observation posts were all within 10 km of the city

    這些臨時測點均位於離城10公里以內。
  18. Supervisor point is behind the postposition of power amplifier, optic signals coming from a tap of 99 : 1 enter into optic spectrum scan module, then the power levels which have been calculated by iterative algorithmic are sent to power control module to guide a set of tunable electronic attenuators

    此方案將監測點放在後置功率放大器的後面,從分束器中分出99 : 1的光進入光頻譜掃描模塊,傳給功率控制模塊的光功率值經過選代演算法后計算出均衡后的功率值送到功率控制模塊的控制中心去調節電可調節衰減器。
  19. From the introduction of the structure and characteristic of dcs, the analyzing in process and control peculiarity of huaxin type cement kiln and the analyzing in the ordinary forms of computer control system in the cement plant, to determine the feasibility of application of the dcs in computer control system of huaxin type cement kiln ; introduced the structure of the system hardware, constitutes and characteristic of the industrial network, the characteristic and the performance in industrial control system of the software system ; illuminated the whole course of the design and the application of simatic s7 - 300 programmable controller in the industrial producing process profoundly : the protraction of a control flowchart ; the confirmation of the control scheme in every cell ; how to workout a table of the all controlling and measuring dots in the control system ; how to set up a plc control project ; the configuration of the hardware and the network in project ; illuminated the course of how to program the plc control program in detail ; how to establish a connection between the plc and the programmer ; how to download the configuration and the program of the plc project ; the configuration of control center software simatic wincc ; the whole course and the methods of the control system debugging ; illuminated the essential in the course of the design in project and program ; illuminated the problem and its respondence maybe encountered in the project ; illuminated the superiority of the new control system in inspecting, operating and its stability ; discuss the development of the computer control system in the application of the huaxin type cement kiln

    從介紹了dcs的結構、特和分析華新型水泥窯的工藝控制特及當今在水泥窯計算機控制系統上採用的幾種常見形式的比較出發,分析了在華新型水泥窯應用dcs的可行性;詳細介紹了系統硬體結構、網路組成及特、所採用的軟體體系的特及其在工業控制應用中的性能;深入詳細地說明了西門子s7 - 300可編程序控制器在華新型水泥窯控制上應用及設計的全過程:控制流程圖的繪制;單元控制方案的確定;系統控制測點表的編制; plc控制項目的建立;項目硬體及網路的組態; plc控製程序的編制過程並詳細說明了控製程序的編制思路; plc與編程器連接的建立; plc項目組態及控製程序的下載; wincc監控軟體的組態;控制系統的調試過程及方法;對設計和使用的要及系統調試時應注意的問題進行了說明;對項目的實施后的華新型水泥窯控制系統在操作和控制上及其在系統易維護性、系統穩定性上的優勢進行了說明並討論了華新型水泥窯計算機控制系統的發展方向。
  20. During deliverability test, flow rate changes from small to big and we can obtain a series of flow pressures, including pressures above saturation pressure and below it, moreover, various physical characters can be obtained by experiments

    進行產能試時,流量從小到大取得一系列穩定的流動壓力值,有大於和小於飽和壓力的測點
分享友人