溢水閘 的英文怎麼說

中文拼音 [shuǐzhá]
溢水閘 英文
spillway gate
  • : Ⅰ動詞(充滿而流出來) overflow; spill Ⅱ形容詞(過分) excessive
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : anchor gate
  • 水閘 : water gate; water lock; penstock; dam; sluice; pen; sasse; canal-lock
  1. " if we hadn ' t opened the discharge gate, the dam might have overflowed and the losses would have been much more serious, " he added

    他還說: 「如果我們不開,那庫區的就會出大壩造成更嚴重的損失。 」
  2. The result show that the position of free surface is higher because of frusta of brake, especial obvious in the head of frusta of brake ; flux coefficient and pressure on dam are quite influenced by type of frusta and 3 a type frusta of brake relative to 2 type frusta of brake has bigger flux coefficient and smaller pressure on dam ; obvious influence of ability of discharge flow for different ratio of thickness of frusta and breadth of brake and pressure on dam reduces with increasing ration of thickness of frusta and breadth of brake, while bigger flux coefficient is obtained when tlb = 0. 2

    結果表明,墩河海大學博士論文的存在抬高了面線的位置,其中在墩頭部尤其明顯;墩型對流量系數和壩面壓力影響較大, 3a型墩相對於2型墩具有更大的流量系數和更小的壩面壓力:不同的墩厚寬比t / b對泄流能力也將產生顯著的影響,隨著墩厚寬比的增加,壩面壓力降低,而當t / b二0 . 2時流壩具有更大的流量系數。
  3. Storm - water overflow chamber

  4. Stormwater overflow chamber

  5. Shankou spillway project has many specific characteristics, for example, the gate frusta and weir body have equivalent thickness, the weir body is low and have corridor, the foundation of the weir body is " high - low foot " " and the side frusta is also used as retain wall. in view of the characteristics, to better analyze the stress distribution on weir body, gate frusta, the joints between gate chamber and weir body, under the condition that the gate chamber is applied with asymmetrical loads and complicated constraints, three dimensional finite element method is applied in this paper

    本文針對山口洪道墩與堰體底板厚度相當,堰體為低堰且設有廊道、堰體建基面「高低腳」及邊墩兼作擋土墻等具體特點,在室設計中采山口利樞紐工程洪道室三維有限元整體應力計算分析用三維有限元整體應力計算方法分析室的受力狀態,分析室在荷載不對稱。
  6. ( 6 ) 3d integer model of spillway and frusta of brake are established and numerical computation of 3d viscous flow over spillway is completed. the influence of frusta of brake for design parameters such as shape of free surface, pressure on dam, flux coefficient is computed aim at type of frusta of brake and disposal on dam and compute result of different type of frusta and disposal model is compared

    6 )通過建立流壩和墩的三維整體模型,完成了對三維過壩流粘流場的數值計算,針對墩的型式及在壩面的布置計算了墩對面線形狀、壩面壓力、流量系數等設計參數的影響,並將不同墩型與布置形式的計算結果進行比較。
  7. Abstract : the outflow through gate controlled multi - opening spillway of yinhe reservoir was analyzed. the analysis results were checked by the site observed data

    文摘:分析了音河庫多孔有門控制的洪道出流,並用出流的實測資料進行了檢驗。
分享友人