滲流控制 的英文怎麼說

中文拼音 [shènliúkòngzhì]
滲流控制 英文
seepage control
  • : 動詞(液體慢慢地透過或漏出) ooze; seep
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  1. Recently, in the field of microfluidics system the drive mode of flow is a key problem, dc electroosmoticflow micropump bases on the principle of electroosmosis, which control the flow in the microchannel with electric field. recent years, it is more and more attracting people to realize it

    當前在微系統中液體的驅動方式是一個關鍵問題,直微泵是基於電原理,利用電場通道中的液體動,實現無運動部件的液體動系統,近年越來越受到人們的重視。
  2. The coal facies might indirectly control the petrophysical properties as adsorption, desorption and permability of the coal reservoir through directly controlling its pore system differential development

    煤相通過對該盆地高煤級煤儲層孔隙系統差異發育的直接而間接了儲層吸附、解吸及物性的優劣。
  3. In an actual case of the numerical modeling on the flood of both the north branch and the mid - downstream of daqing river in haihe river hasin, the flood is simulated with one - dimensional model, in which flood regulation of the retarding basin, the discharge gate control and the infiltrations of the northern rivers are considered

    在海河域大清河北支及中下遊河道洪水數值模擬的實際工作中,應用了一維河網模型進行洪水的模擬計算,並根據實際情況加入了蓄滯洪區調度、泄洪閘調度以及近年來北方河道入的特點等條件,計算效果良好。
  4. A new method of close drainage hole simulation in the seepage control analysis

    滲流控制分析中密集排水孔模擬的新方法
  5. By applying the theory and method of geological anomaly, it is focused on the analysis of the characters of major geological anomalies and their effect of mineralization in daye - jiurui region. the analysis result shows that the basement fault anomalies control a few major large hidden batholiths and their associated orefields ; that the anomalies of cover structure confine most cu - au deposits and fe - cu deposits within their scope ; that the geochemical anomalies and lithofacies - paleogeographical anomalies are major geological factors leading to trataboundness of some cu - au deposits ; that the anomalies of rock operties provide the favorable chemical and physical conditions for the ore - forming process, including the seepage, circulation, convergence and deposit of ore - bearing hydrothermal solution ; that the anomalous ctive stage of mesozoic magmatite is almost consistent with the major mineralization epoch of the fe, cu deposits, and the structure of multi - levels, and the zoning in magmatic system determine the spatial distribution of the mineralization system. then, based on the above analysis, a comprehensive variate, geological combination entropy, is brought forward for reflecting the complex degree of the combination of geological ore - controlling factors. after circumscribing the anomalies of geological combination entropy, the relations between the anomalies and ore deposits are determined

    從地質異常的角度,重點分析了大冶九瑞地區主要地質異常的特徵及其對成礦的影響.由分析可知:基底斷裂異常了本區若干重要規模較大的隱伏巖基及伴生礦田,而蓋層構造異常銅金礦床和鐵銅礦床的空間位置;地層的地球化學異常和巖相古地理異常是造成一些銅金礦床層性的主要地質因素;蓋層的巖性異常為含礦熱液的、循環、聚集和礦質沉澱等一系列成礦作用提供了有利的物理和化學條件;中生代巖漿巖的異常活動期也是本區主要的鐵銅成礦期,巖漿巖系統的多層分枝和分帶性結構了本區成礦系統的三維空間分佈.在上述分析的基礎上,構置了地質組合熵作為反映礦地質因素組合系統結構復雜程度的綜合變量,並圈定出組合熵異常,由此確定了綜合地質異常與礦床的關系
  6. The phenomena can be observed in the tests low seepage pressures can easily form passageways behind the waterproof layer if there is no drainage layer or the drainage layer is blocked in the single - shell test slab ; the waterproof layer can resist higher seepage pressure if there is no drainage layer or the drainage layer is blocked in the double - shell test slab ; the seepage water can be controlled and drained away in the drainage layer by the water proof layer only if there is unblocked drainage layer behind it in the double - shell test slab

    由試驗可見,在單層試驗板中沒有排水層或排水層不通暢時,較低的水壓就能在防水膜后形成通路;在雙層試驗板中沒有排水層或排水層不通暢時,防水膜能抵抗一定程度的漏水壓;只有在雙層試驗板中的排水層暢通時,防水膜才能有效地將漏水在排水層中排走。
  7. The formulation for the flow model is given using the finite element / control volume ( fe / cv ) technique based on darcy ' s law of creeping flow through a porous media. the heat transfer model is based on the two - dimensional, transient heat conduction equation, including heat generation. the cure kinetics model is based on kamal ' s model, and the degree of the resin cure as a function of temperature and time

    樹脂動階段的模擬是根據牛頓體在多孔介質中的理論,應用darcy定律並使用有限元/體技術建立起來的;熱傳遞模型是一個二維瞬態熱傳導方程,考慮樹脂反應放熱;樹脂的固化模型利用了kamal提出的固化動力學方程,將固化度取為時間和溫度的函數。
  8. The research result of the paper indicates that utilizing manual soil dealing with rainwater can reach better depurating effect by reasonable designing and controling. in practical project, especially in the condition of soil with badly penetrating ability and lower groundwater level, can adopt about one meter deepness manual soil laying on the greenbelt and can also design special manual soil depurating equipment around building to dealing with rainwater, which not only assures depurating effect but also saves occupying area and improves environment

    本論文的研究結果表明,經合理設計,利用人工加人細砂的土層處理雨水徑,可達到較好的處理效果,實際工程中,尤其是在土壤透性很差,地下水位較高等情況下,可以在綠地表層採用lm左右的人工土壤層, 『也可在建築物附近設計專門的人工土壤凈化裝置來處理雨水徑,既可保證處理效果,又可節省佔地和改善環境。
  9. ( 2 ) on the basis of continuity equation, momentum conservation equation, energy conservation equation, and substantial equation, coupled thm governing equations are derivated with giving up the assumption of local thermal equilibrium, adopting thermal elasto - plastic constitutive relation, taking the effect of temperature gradient on groundwater seepage ( analogous to soret diffusion ) and the effect of viscous dissipation of groundwater on temperature field of rock mass into account

    ( 2 )根據連續性方程、線動量平衡方程和能量守恆方程以及相應的物性方程推導了飽和巖體溫度場-場-變形場三場耦合作用方程組。在推導方程組時舍棄了「局部熱平衡」假設,採用了熱彈塑性本構關系,考慮了溫度梯度對地下水的影響(類soret效應)以及地下水的粘性耗散對巖體溫度場的影響。
  10. 5 summary a subsurface runoff model with water storage and recharge is developed in this paper based on the bous - sinesq - storage equation. the sensitivity of the model parameters is also tested. the subsurface runoff model is applied to a river basin with observed precipitation, observed air temperature data, observed runoff data, and a base flow separation algorithm in order to vali - date the model application

    5結論與討論基於boussinesq - storage方程發展了同時考慮水分儲存和入的地下徑,分析了模型參數的敏感性,並針對淮河域的的息縣站所的區域,利用降水徑資料及通用的基分離演算法進行了驗證
  11. Analysis of the abutment seepage on wanjiazhai multipurpose project

    黃河龍口水利樞紐壩基承壓水問題分析與滲流控制
  12. Centrifuge model test technique preferably solves two problems : one is the gravity loss of the model soil, the other is the coupling problem between the seepage field of the ground water and the stress field of the stratum, which is a guidance for other deformation controls under the similar condition

    離心模型試驗技術較好的解決了在地下工程研究中模型土體的自重損失和地層位移分析中地下水場和地層應力場相互耦合作用問題,對于在相似條件下富水地層隧道開挖施工如何地表沉降變形的研究方面具有指導意義。
  13. ( 2 ) the method of finite element discrete and optimal parameter back analysis is adopted. ( 3 ) concentrated on the question of high external water pressure of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied. ( 4 ) based on jinping cascade 2 hydropower station, numerical simulation rain infiltration of seepage field under different drainage pattern and grouting pattern are studied, also, the high external water pressure is analyzed and studied and some seepage control measures are put forward

    ( 2 )採用有限元離散?優化法進行參數的反演分析; ( 3 )針對深埋隧洞的高外水壓力問題,進一步分析和研究了襯砌水荷載及外水壓力的作用機理和計算方法; ( 4 )以錦屏二級水電站深埋長引水隧洞作為本文的主要研究對象,採用考慮降雨入場分析的方法對排水方案和灌漿封堵方案不同情況下的場的水頭分佈進行了數值模擬,並對其外水壓力進行了分析和研究,提出了滲流控制的具體措施。
  14. 2. based on the analysis of the historical evolution of jinan springs ' spurting, a quantity equation between the anaual average spring discharge and the anaual lowest water table is built according to the statistic data, which enable us to gain the corresponding relation between baseline water level and the smallest scenic discharge of spring gushing. then the groundwater discharge in the spring area is calculated and the controlling parameter of maximum available amount of groundwater exploiting is obtained

    泉域總面積1486平方公里。 (二)通過分析濟南市泉群噴涌歷史統計資料,首先建立泉群年平均噴涌量與年最低地下水位之間的定量方程,得出四大泉群噴涌的底限水位與最低景觀量的對應關系,然後,計算泉域內地下水的入補給量,再得出保證泉涌的地下水最大允許開采量的性參數。
  15. In order to improve oil displacement efficiency of infusing agents and precisely to predict the three dimensional distribution about residual oil, taking the sand body of p 2 individual meandering river - channel in putaohuareservior of daqing oilfield as an example, by analyzing the thin interbeds and vertical permeability discrepancy, this paper brings forward the space configuration of the thin interbeds in single sand body, the vertical permeability distribution and gravitational differentiation which control the distribution of residual oil and the vertical multisection model of displacement efficiency in the condition of excluding exploitation factors and identical single sand - body,

    摘要為了進一步提高注入劑驅油效率以及準確預測儲層中剩餘油在三維空間的分佈,以大慶油田葡萄花油層組p 2小層曲河道砂體為例,通過對曲河道砂體內部薄夾層構形及透率垂向分佈的差異性分析,在排除開發因素差異的同井單砂體分析條件下,提出了單砂體內部薄夾層空間構形、透率垂向序列與重力因素共同剩餘油分佈、驅油效率多段垂向序列模式。
  16. The control equation consist of completely coupled deformation equation, seepage equation, conduction and convection equation of heat, which describe the reservoir non - liner performance. 2, present the detailed strategy and methods to solve this mathematics model, the basic strategy as follows : regard the deformation equation ? seepage equation conduction and convection equation of heat as separate system, and solve the equation by coupling and iterative method ; disperse the control equation in the geometry field by the finite element method ( galerkin ), and in the time field by the finite difference method : programme the computer program on this task ; when the solving, take the combinative measures of the thick and thin mesh ; successfully carry out the numerical simulation in vast 3d heat extraction system of hdr

    2 、提出了高溫巖體地熱開發的固、、熱多場耦合數學模型的數值解法,其基本的求解策略是:將固體變形,與溫度場方程看成獨立的子系統,耦合迭代求解;利用有限元離散( galerkin )方法將方程在幾何域上離散,並用差分法得到時間域上的離散方程,並在此基礎上,編了相應的計算機源程序;有限元求解中,為減小邊界效應的影響,在計算中採取粗細網格結合的方法,順利地實現了高溫巖體地熱開發三維巨系統的數值模擬。
  17. Study on the gas flow control of plasma nitriding system

    等離子體系統的研究
  18. Study on control measures of dam foundation seepage flow in plain reservoir

    平原水庫壩基滲流控制措施研究
  19. The following contents are included : ( 1 ) based on the fundamental seepage theory, the basic differential equation of saturated - unsaturated seepage in porous mediums has been deduced, in which the pressure head is the fundamental unknown quantity. furthermore, the equation for rcc dam is deduced too

    主要內容包括: ( 1 )從基本理論出發,以壓力水頭為基本未知量推導多孔介質三維飽和非飽和微分方程,並根據碾壓混凝土壩的特點得出適合其自身的滲流控制方程:進而對碾壓混凝土的基本理論、特性開展深入的研究工作。
  20. The main contents are as follows : firstly, the principal theories and methods to analyze monitoring data and about finite element method applied in seepage are illustrated in the article, which provide warrants in theory on choosing reasonable seepage control measure and evaluating safety reliability of dam project

    其主要內容有以下幾個方面: 1 、綜合闡述了大壩原型觀測資料的分析理論和方法以及有限元的基本原理,為選擇合理的滲流控制措施和評價大壩工程的安全可靠性提供了必要的理論依據。
分享友人