滲漏線 的英文怎麼說

中文拼音 [shènlóuxiàn]
滲漏線 英文
filtration path
  • : 動詞(液體慢慢地透過或漏出) ooze; seep
  • : Ⅰ動詞1 (從孔或縫中滴下、透出或掉出) leak; drip 2 (泄漏) divulge; disclose; leak 3 (遺漏) le...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 滲漏 : percolation; seepage; leakage
  1. The technical route and the investigation technique of the relevant investigation, the evaluation method for karst seepage from reservoir and the treatment principle concerned are discussed herein on the basis of the hydrogeological investigation made on the karst area of the interfluve on the left bank of the reservoir for soufengying hydropower station

    本文擬以索風營水電站水庫左岸河間地塊的喀斯特水文地質勘察為實例,對有關勘察工作的技術路、勘察技術、喀斯特水庫評價方法及處理思路作相應的探討。
  2. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防水工程、有防水要求的衛生間、房間和外墻面的防,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管、給排水管道、設備安裝為2年; 5 、裝修工程為2年。
  3. Combing the linear seepage model with hydrogeology in the region of zhong - liang reservior, the analysis of the problem of positive and negative is emphasized. make use of with some observing information of boreholes in this region, adverse seeking the hydrogeology of the reservoir in the region with finite element method, the leakage quatity of karst water in the region of reservoir is forecasted.

    流模型結合了中梁水庫庫區水文地質條件,重點進行正反問題的計算分析,利用研究區若干觀測孔資料,採用有限單元法反演庫區的水文地質參數,並預測了庫區巖溶水量。
  4. In the three models of calculating the leakage quantity of karst water, on account of the linear and non - linear seepage model are accord with the movement of darcy flow and non - darcy flow coexists with the practical instances in zhong - liang reseviour, so the calculation result of leakage quantity of karst groundwater with this model is more reasonable

    在上述三種計算庫區巖溶水量的模型中,由於性?非流模型同時考慮了與中梁水庫區實際情況相符合的達西流和非達西流區域並存的地下水運動,因此,利用該模型計算出的庫區巖溶水量更合理。
  5. Considering the seepage of linear and the seepage of non - linear in the karst area are always coexisting, the model of linear seepage and non - linear seepage is put forward firstly on the basis of domain decomposition method. the movement of groundwater in an ideal model is simulated with this method, and the program of dar - nondar. for is compiled. then these results are applied to zhongliang water resources and power engineering, the leakage quantity of karst water is calculated

    考慮到巖溶區流往往都是性流與非性流並存,首次提出了基於區域分解法理論的性?非流模型,利用該方法模擬出理想模型中的水流運動,並編制了計算程序dar - nondar . for ,然後將該成果應用於中梁水利水電工程中,預測出庫區巖溶水量。
  6. The key to calculate the moistening deformation is to work out the distribution of the water content. aiming to the collapsible accidents owing of leakage, this text establishs two - dimensional immersing model of collapsible loess and predicts the change of water content in loess subsoil. furthermore the text selects the stress path method to calculate the moistening deformation subjected to leakage, substituting compressing moduls for tangent moduls after taking cavity ratio and water content into account, putting forward the method to calculate the moistening deformation

    增濕變形的關鍵是研究含水量的變化,本文針對黃土地基由於水所引起的濕陷事故,建立了二維濕陷性黃土地基積水入模型,實現了對黃土地基含水量變化的預測,進一步選擇了分層總和法計算黃土地基增濕變形,考慮了含水量、孔隙比對模量的影響,以弦模量取代壓縮模量,提出了計算增濕變形的計算方法,計算了由於水而引起的黃土地基增濕變形量。
  7. ( 4 ) on the basis of analysed result and the status quo of huxi bank, computing the slope safety and seepage of bank by fem. the result shows that the tarus quo of huxi bank could not satisfy theslope safety on designed flood lever. after the reinforcement of seepage, the method can not only reduced leakage, debace the soggy but also ameliorate stress fields. lt also can reduce horizontal displacement and certical displacemeng which have disadvantages to bank

    進行堤體防加固后,不但可以減少,降低堤身浸潤,還可以有限度地提高抗滑穩定安全系數,改善堤身及地基的應力場,使在高水位作用下產生的不利於堤體安全的水平位移和豎向位移減小。對在後繼采動中可能造成的防材料的破壞進行了校核,結果表明材料是安全的。
  8. This paper deals with characteristics of the natural electric field " 8 " - shaped maps under different hydrogeological conditions, which are of guiding significance in the evaluation of the environment caused by the leakage of waterlines

    摘要討論了不同水文地質條件下自然電場" 8 "字圖特徵,對評價輸水管引起的環境問題具有指導意義。
  9. Nondestructive testing ( ndt ) techniques used in material inspection, fabrication inspection and inservice inspection of pressure vessels are reviewed including ultrasonic, radiographic, magnetic particle, penetrant, eddy current, acoustic emission, infrared, magnetic flux leakage and magnetic memory techniques

    摘要綜述壓力容器原材料、壓力容器製造和使用過程中採用的無損檢測技術,包括笤聲、射、磁粉、透、渦流、聲發射、紅外磁和磁記憶檢測技術。
  10. Please open the engine cowling and check for leakage / overheat / wires / / electrical connectors

    請打開發動機包皮檢查/過熱/導/插頭。
  11. Non - destructive testing of steel tubes - automatic full peripheral magnetic transducer flux leakage testing of seamless ferromagnetic steel tubes for the detection of transverse imperfections

    鋼管的無損檢驗.橫向缺陷探測用無縫鐵磁性鋼管的自動全周界磁力換能器磁力檢驗
分享友人