漏排 的英文怎麼說

中文拼音 [lóubèi]
漏排 英文
omit some words or passages in printing due to carelessness
  • : Ⅰ動詞1 (從孔或縫中滴下、透出或掉出) leak; drip 2 (泄漏) divulge; disclose; leak 3 (遺漏) le...
  • : 排構詞成分。
  1. In view of the natural conditions in loess area of gansu, in the light of investigation conditions of seepage of built loess and weak rock highway tunnels in this area and classification of water gushing conditions for railway tunnels, and by engineering analogism, the classification of tunnel water gushing types suited the structure design of highway tunnel waterproof and drainage, and the three methods for checking and subdividing water gushing types are presented

    摘要針對甘肅黃土區的自然條件,依據該地區已建黃土及軟巖公路隧道滲水調查情況和鐵路隨道涌水狀態分類,運用工程類比法提出適合該地區公路隧道防水結構設計的隧道涌水類型劃分及對涌水類型校核與細分的三種方法。
  2. Powerformer have some changes in constract with the conventional generator , subsequently it also have some new problems in order to have an economical , efficient , credible development and application the structure and the philosophy of electromagnetism of powerformer will be on speaking terms changes electrical design , magnetism design , thermal design and structural design are have some new changes above all , the electromagnetism parameter and the harmonic magnetomotive force of powerformer are studied in this paper first , it mainly utilizes analytics to deduce formula of slot leakage reactance it considers three instances , including monolayer - slot , multilayer isometric - slot and multilayer anisometric - slot then , the analytics and the fem are utilized to calculate slot leakage reactance of stator winding of prototype of powerformer and compare their results second , the theory of utilitzing fem to calculate the reactance of powerformer is simply introduced , including stable reactance , transient and subtransient reactance specially , the saturated influence of the stable reactance is considered then , the results are analysed final , it mainly introduces the influence of harmonic magnetomotive force of stator winding and analyses the harmonic magnetomotive force of stator winding then , it mainly analyse harmonic magneto - motive force of stator winding through arranging various arrays of stator winding and observe their influence

    基於上述原因,本文對powerformer的電磁參數以及定子繞組諧波磁勢進行了研究。首先是用解析法推導出powerformer定子繞組槽抗的計算公式,考慮了單層圓形半閉口槽、多層等半徑圓形半閉口槽和多層不等半徑圓形半閉口槽三種情況,並對powerformer樣機的定子繞組槽抗用解析法和有限元法進行了計算,並比較其結果;其次,簡要介紹了有限元法計算powerformer電抗參數的原理,包括穩態電抗、瞬態電抗和超瞬態電抗,對穩態電抗考慮飽和影響,對結果進行分析;最後,介紹定子繞組諧波磁勢對電機運行性能的影響並對定子繞組諧波磁勢進行了分析。然後通過對定子繞組進行不同列來分析定子繞組諧波磁勢,看看繞組列對諧波磁勢的影響。
  3. Three. compared with the same kind of products from other factories, our products have the advantages of no - leakage, no - blockage, no need to install blow pipe, easy maintenance, etc

    三、與其它模具廠同類產品不同之處:能達到氣不粉、不堵塞、不需安裝吹氣管,維修方便等特點。
  4. The crankcaseventilation system, using a road-draft tube, vented the crankcase vapors and blow-by gas into the atmosphere.

    採用行車抽吸管的曲軸箱通風系統,給曲軸箱內的蒸氣和竄氣體入大氣提供了出口。
  5. The fringelike fimbriae transport ovulated eggs from the ovarian surface to the infundibulum.

    花邊狀的傘將出的卵,從卵巢表面運送到斗。
  6. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防水工程、有防水要求的衛生間、房間和外墻面的防滲,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管線、給水管道、設備安裝為2年; 5 、裝修工程為2年。
  7. The printers have missed out a whole line here.

    版工人在這里掉了一整行。
  8. Based on the analysis of practical roofage treatment of large scale workshops in donglei water pumping project, the design and construction matters on the drainage and roofage treatment are introduced, which may provide some reference for other works

    結合東雷抽黃續建工程幾座大型泵站廠房屋面施工的實際,介紹大型預制屋面的水與滲問題及設計、施工方面應注意的事項,供類似工程參考。
  9. Abstract : based on the analysis of practical roofage treatment of large scale workshops in donglei water pumping project, the design and construction matters on the drainage and roofage treatment are introduced, which may provide some reference for other works

    文摘:結合東雷抽黃續建工程幾座大型泵站廠房屋面施工的實際,介紹大型預制屋面的水與滲問題及設計、施工方面應注意的事項,供類似工程參考。
  10. The basic concept of siw is that it use the top and bottom layers of metal together with two row of vias is very small compared with wavelength, the dissipation loss of radiation is very small. it acts like a rectangular waveguide filled with some dielectrics, so components which can be composed by rectangular waveguide can also composed by siw such as antenna, filter, power divider, coupler, resonator

    基片集成波導的基本概念是利用基片的上下金屬板和兩間隔一定距離的金屬孔構成波導的金屬壁,由於每金屬孔孔間距遠小於波長,因此由縫隙泄的能量很小,這相當于內部填充了介質的矩形波導,所以能夠用矩形普通波導實現的結構也都可以用基片集成波導來實現,比如功分器、濾波器、天線、耦合器、振蕩器等。
  11. Some technicians use the infrared exhaust analyzer to quickly detect small vapor losses from around fuel tank.

    有些技術員利用紅外線氣分析儀來迅速檢測燃油箱周圍的少量的蒸氣泄
  12. Under special conditions such as low partial load / deep vacuum, unexpected high air leakage resulting in a major temperature difference ( above 10 c ) between the steam exhaust turbine temperature and all air - take off temperature measurement, the suction capacity can be improved by using 2 main ejector simultaneously

    在特殊條件如局部低載荷/極端真空,不正常的熱交換,意想不到的高空氣泄導致的在蒸汽氣溫度和抽空溫度測量上產生的嚴重溫差( 10 c以上) ,用兩臺主抽汽器同時工作可以提高抽氣量。
  13. The damage and mechanism of the two styles are analyzed on emphasis, and some treating methods such as anti - seeping and plugging, the installation of surface drainage system and cliff sheer eaves are also put forward

    按水在崖壁上的運移方式將花山巖畫的滲水病害分為裂隙滲水和面流水,著重分析了它們各自的危害和機理,提出了防滲堵、建立地表水系統、修建立壁遮擋檐等防治對策。
  14. Unfortunately regulations on the exclusive effect of registered chattels mortgage in < < guarantee law of p. r. c > > have five loopholes

    然而,我國《擔保法》對已登記的動產抵押權的他性效力問題的規定存在五個方面的洞。
  15. Never pipe the discharge line directly into a drainage ditch, sewer or sump

    不要把泄管直接插入泄地、污水管或污水坑裡。
  16. With regard to its field drilling applications in the geologically loose sandy pebble layers, kl vegetable - gum drilling fluid showed itself with excellent rheological behaviours in its abilities of lubrication, lost circulation, suspension and removal of debris, anti - shear shinning, and high coring rates, which satisfactorily meet the demands of geological boring in the dam foundation of huangjin ping hydroelectrical power plant

    通過在黃金坪水電站壩基深厚砂卵石覆蓋層鉆探取芯的現場試驗,證明了kl植物膠沖洗液具有優良的流變特性,潤滑、堵、懸浮除巖屑和抗剪切稀釋能力顯著,可實現高取芯率,能很好的滿足地質鉆探對取芯質量的要求。
  17. Make sure drains and pipes do not leak or arent blocked. do not alter them without prior authorization. repair immediately if there is a defect in the trap or smell of foul air is coming from drain outlets

    確保水口及喉管沒有滲或阻塞未經批準,切勿擅自將渠管改道如隔氣彎管有損毀,或水口發出臭味,應立即維修。
  18. A word or other part of a manuscript omitted from the printed copy

    印刷件上漏排的字或稿子的其他部分
  19. Specification for non - percolating layflat delivery hoses and hose assemblies for fire fighting purposes

    滅火用無滲漏排水扁形軟管與軟管組件規范
  20. Infiltration of atmosphetic water and river leakage are the major supply source of krast water in jinan spring field, while artificial water - taking and spring discharge are its major discharge forms. the karst water flows from south to north in the whole and the average recharge capacity is 55 x 104m3 / d

    巖溶水補給來源主要為大氣降水滲入和河流滲泄方式主要為人工開采和泉水泄,總體向北徑流,泉域多年平均補給量為55萬m ~ 3 d 。
分享友人