焊接應變 的英文怎麼說

中文拼音 [hànjiēyīngbiàn]
焊接應變 英文
weld strain
  • : 動詞(用熔化的金屬修補金屬器物或使金屬工件連接起來) weld; solder
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • 焊接 : weld; welding; soldering; seal; sealing; sealing-in; shutting together
  1. Before repairing, basing on the actual working condition, concerning the weldability, stress and deformation issues, the scheme of the cold welding technology whose essential being gtaw, low temperature preheating, postweld hammer the welded seam was established

    修理前,圍繞兼顧解決性、力和形問題,結合實際施工條件制定了以手工鎢極氬弧、鎳基絲、前低溫預熱、后錘擊縫為要素的冷堆工藝。
  2. Fourth, the paper treats two kinds of hoisting projects of high alititude construction in bulk and member assembly, hositing machine and plan layout, setting up scaffold and joints, and installing trunks, branches and joints etc. then in detail discusses the method which applys total station to measure three - dimensional coordinate of dendriform structure, including selecting survey sign points, creating survey system and converting survey coordinate system etc. the paper also deep research on the welding performance, welding method, welding process, welding stress and control, welding strain and rectification, weld defects analysis and weld quality inspection, and so on complicated heterogeneity steel weld proplems

    著系統的論述了高空散裝法和分單元安裝法兩種樹狀結構吊裝方案,樹狀結構吊裝機械及平面布置,樹狀結構胎架及節點的搭設,以及樹狀結構樹干、樹枝和節點的吊裝工藝等諸多工藝問題。詳細的論述了採用全站儀對樹狀結構進行空間三維坐標測量的方法,包括測量標志點的選取、測量系統的建立及測量坐標的轉換等問題。深入地研究了樹狀結構可性、方法、工藝、力及控制、形及矯正、缺陷分析及質量檢查等復雜的異種鋼問題。
  3. To solve these problems, a fem preprocessing system in materials joining process has been developed in this dissertation. based on this system, a welding numerical model of a missile ’ s oil box has been established and the structure ’ s distortion rules after welding have been analyzed

    本文針對這一現狀開發了一個專門針對過程數值模擬的有限元前處理系統,並用該系統建立了某型號導彈油箱結構的有限元模型,分析了該結構的形規律。
  4. Steel moment - resisting frames with welded beam - to - column connections were traditionally regarded as having excellent performance, and widely adopted in steel constructions, but this opinion changed after the 1994 northrige earthquake and the 1995 hyogoken - nanbu earthquake. these earthquakes also arouse engineers to resurvey the behavior of end - plate connections

    傳統觀點認為,樑柱剛性連具有較好的抗震性能,因此在工程中得到了廣泛地用,但1994年的northrige地震和1995年的阪神地震改了這種傳統觀點,這兩次地震也引起了工程技術人員對端板連的再審視。
  5. To validate the formulated transition element for the calculation of the hot - spot stress and stress concentration factor in the welded components by experimental results, the stress concentration factor of the experimental welded specimens carried out in the research group is calculated by using the developed plane - transition element. the calculated stress concentration factor in the two types of tested welding components agrees well with that obtained from the experimental result. and the calculated result on the tendency of hot - spot stresses agrees well with that from the measured result

    為了驗證文中構造的過渡單元模型用於分析節點附近的力集中問題的正確性和有效性,進一步又對過渡單元模型進行實驗結果驗證,採用平面過渡單元模型計算了本課題組進行的兩類構件的力集中系數,並與根據實測方法得到的力集中系數進行了比較,計算結果與實驗測試得到的力集中系數和相的熱點化趨勢比較吻合,為本文建立的過渡單元的實際用提供了初步的基礎。
  6. Instead of using an adhesive bond strain gauge, laser spots are used to achieve an atomic bond between the deformation body and measuring cell

    使用激光點代替膠結技術測量儀來實現形體和測量元件的原子連
  7. The application of the welding robot used for the fcaw of the hydraulic

    機器人在液力矩器連塊填角中的
  8. Welded sturdy box construction, using heavy - gauge steel plates for ruggedness. d - section frame for resistance to deformation

    箱式結構全平臺,採用高強度結構鋼板,適惡劣工況的工作需要。 d型截面的平行圍邊減小了形。
  9. And it investigates the appearance condition ( including joint, crack, eroding, corrosion, braking pole device rupture, crane - girder ' s gnawing railway and so on ) of the whole crane - girder system on the spot, at the same time, it also actually examines the stress of the beam, chemical ingredient, distortion and railway excursion, etc. through sampling, and based on the actually examined results, it checks and calculates the carrying capacity of crane - girder system. then, based on the investigating on the spot and the calculated result, it discusses the mechanism of fatigue failure of the upper part of welded steel crane - girder, analyses the reason of steel crane - girder in the high - frequency emerging the fatigue crack, institutes the strengthened method of damaged steel crane - girder of accurate packing up workshop of the primary mill plant. finally, it presents some advice and suggestions for the repairing and strengthening method of fatigue crack of upper part of steel crane - girder in the high - frequency

    針對包鋼初軋廠精整車間鋼吊車樑上部區域出現裂縫這一問題,本文首先綜述了國內外關于鋼吊車樑上部區域疲勞裂縫的研究現狀;其次對整個吊車梁系統的外觀情況(包括連、裂縫、腐蝕、銹蝕、制動桿件斷裂、吊車啃軌等)進行了現場調查,抽樣實測了梁的力、化學成分、形及軌道偏移等,根據實測結果,對吊車梁系統的承載能力進行了驗算;然後,根據現場調查及計算結果,探討了鋼吊車樑上部區域疲勞破壞的機理,分析了重級工作制鋼吊車梁出現疲勞裂縫的原因,制定了初軋廠精整車間破損鋼吊車梁的加固方案;最後就重級工作制鋼吊車樑上部區域出現疲勞裂縫的修復與加固方案提出了一些意見和建議。
  10. The coating on the chassis is generally guaranteed for two years, at the same time, pay attention to avoid scratch by stone blocks ; moreover, do not flame welding on the chassis so as not to change hardness of steel work

    同時避免轎車底盤被路面石塊等硬物劃傷,還盡量避免在底盤上進行火焰,以免改鋼件的硬度,而經過火焰燒過的鐵板生銹的可能性更大。
  11. Igbt power modules, 25khz inverterfrequency, fast response time, high arc stability, almost spatter - free welding

    採用igbt模塊,逆頻率達25khz ,動態響速度快,穩弧性能好,飛濺極小。
  12. Igbt power modules, 18khz inverter frequency, fast response time, high arc stability, almost spatter - free welding

    採用igbt模塊,逆頻率達18khz ,動態響速度快、穩定性能好、飛濺極小。
  13. What ' s more, the application of tc11 two phase alloys to the compress disk of areoengine alredy is relatively mature, and tc11 alloy may work safely for very long time below 500 c. ti3al matrix alloy and ( a + b ) two phase alloy is connected by weld. the request of the temperature and stress can be satisfied by dual alloy disk with isothermal forged ( or hot die forging )

    選用ti _ 3al基合金tac - 1b和tc11兩相鈦合金用工藝連起來,通過熱模鍛或等溫鍛鍛造和不同的形熱處理制度,製造出雙合金盤可以滿足溫度、力對盤件的要求。
  14. Recently, train is running faster and faster, and considering the stability and security, seamless welded rails ( swr ) are used as the train orbits gradually. the temperature of the rails will vary with weather. so that the rails may release the energy due to the metal characteristic of expanding or contracting with temperature, there is some badly distortion in the swr, worsly occurring accidents on expanding orbits. the portrait thermal stress ( pts ) of the swr should be monitored in some parts regularly, as to avoid such accident

    近年來,隨著火車的提速造成的穩定和安全問題,軌道逐步轉為採用無縫鋼軌,隨著鋼軌溫度的化,無縫鋼軌可能會因為熱脹或冷縮的金屬特性並且在扣件阻力小而且路基較差的路段釋放能量,可能會發生鋼軌嚴重形,更甚者會發生脹軌跑道等嚴重鐵道事故,為了避免發生如此事故,有必要定期對鋼軌的溫度力進行檢測。
  15. Friction stir welding process can improve mechanical properties as well as decrease distortion and residual stress

    採用攪拌摩擦鎂合金可以避免熔時產生的缺陷,且具有形小、殘余力小等優點。
  16. The conclusion of reappearing analysis is that crane bridge be used as usual because main weld maximum stress of upper cover plate of main beam lower than yield limit though it higher than permissible stress. inner stress of secondary beam was over ultimate strength, and deforming is ultra big. so it was unfit for produce and secondary beam must be changed

    再現分析得出的主要結論為:橋架的主樑上蓋板主縫的最大力超過了許用力,但小於屈服極限,可以繼續投入使用;副梁內部的力遠遠超過了強度極限,形特別嚴重,不能滿足生產要求,因此更換新的副梁;端梁內部的力超過了屈服極限,小於強度極限,在力較大的位置補強板;投入使用后,要對整個橋架進行定期檢查。
  17. Therefore, in order to understand the long - time performance of the weld, it is necessary to study the welding interface of niobium alloy and stainless steel, and know the microstructure evaluation. explosive welding and vacuum electron beam self - material brazing were used to prepare the specimen

    因此,研究鈮合金與不銹鋼的結合層,分析形成的互擴散層的組織、成分和性能化,對了解不銹鋼和nb合金的互擴散反行為,件的工藝改進和長期使用性能的評估是很有意義的。
  18. This paper researches the digital characteristics of the welding power supply and the main circuit of the full bridge high power soft - switching. nowadays, welding machines usually apply the hard - switching as the topology, which causes the problem of higher loss and lower efficiency

    目前電源所用的大功率電路多採用硬開關電路,這樣在功率器件導通和關斷過程中會產生很大的損耗,並且隨著逆頻率的提高,損耗會增大,這樣就降低了機的效率。
  19. This paper introduces the current development of inverter welding power source at home and abroad and the facing difficulties during the research of this aspect, and then points out the necessity of the application of computer simulation

    介紹了國內外逆電源的發展現狀以及面臨的問題,並指出用計算機模擬技術開發電源的必要性。
  20. Welding stress and distortion

    力和
分享友人