無樁平臺 的英文怎麼說
中文拼音 [wúzhuāngpíngtái]
無樁平臺
英文
pileless platform-
In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted
其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定橋墩基礎的施工方法,對水深不超過四米的橋墩基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋墩,採用鋼管樁平臺;對主河道上河床沒有覆蓋層,鋼管樁無法插打的橋墩,採用浮式平臺。Secondly, considering the complexity of the analysis of inclined - loading pile, nonlinear finite element method is adopted to calculate the internal force and displacement of pile group under inclined loads, with the concept of equivalent width presented to simplify 3d problems into 2d problems. and a program is developed as well, which is able to consider the continuity, elastic - plasticity and layered characteristic of soil around the pile shaft. besides, the interactions among pile, base slab and soil are considered in this program and contact surface element is used to simulate slipping and crazing between pile and soil, or between base slab and soil under loads. then, the non - tension analysis is proposed, to reflect the low - tensile property of soil and concrete
在此基礎上,針對傾斜荷載下群樁基礎分析中的復雜性,提出採用非線性有限元對傾斜荷載下群樁的內力及位移進行分析,應用樁的等效寬度概念將空間問題簡化為平面問題考慮,並開發出能考慮樁周土介質連續性、彈塑性、分層性等因素的傾斜荷載下群樁內力及位移分析的計算機程序,並在程序中考慮了樁、土、承臺的相互作用,提出了採用接觸面單元來考慮荷載作用下樁與土體及承臺與土體間的滑移、開裂;並在此基礎上,提出了傾斜荷載下群樁基礎的「無拉力」分析方法,可有效地反映土體及混凝土材料的低抗拉特性。
分享友人