無焊接線 的英文怎麼說

中文拼音 [hànjiēxiàn]
無焊接線 英文
solderless wiring
  • : 無Ⅰ動詞(沒有) not have; there is not; be without Ⅱ名詞1 (沒有) nothing; nil 2 (姓氏) a surn...
  • : 動詞(用熔化的金屬修補金屬器物或使金屬工件連接起來) weld; solder
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 焊接 : weld; welding; soldering; seal; sealing; sealing-in; shutting together
  1. To further reduce equivalent series resistance and improve long term reliability, the leads are then soldered with lead free silver solder

    為了進一步的減少等效串聯阻抗和改善,長期的信賴度,引是以鉛銀錫來
  2. Long rails in jointless track are usually made on welded rail site or in railway welded rail factory

    摘要路長鋼軌道常由鐵路軌廠或現場軌基地
  3. Then an thorough computer modeling using finite element program with material, geometry and state triple - nonlinear taken into account is carried out on a series of influencing factors, such as comparison with npn - beam splice connection, comparison of varies designed theories, and the varying of fraction coefficient, diameter, grade, pretension and arrangement of bolts, thickness of web and flanges of beam and column, splicing location, axial loading on column, etc. lots of useful conclusions are drawn form computer modelling. finally, design and construction suggestions are given out. this study fills the black in the field of steel beam - to - column connection with cantilever beam high - strength bolted - splicing at both home and abroad

    然後,本文在考慮材料、幾何和狀態三重非性的基礎上,對該連形式進行了全面的計算機模擬,主要考慮了帶懸臂梁段全螺栓拼的樑柱連節點與的樑柱連及翼緣對腹板拼的連節點的對比,各種設計方法之間的對比,以及翼緣拼和腹板拼的螺栓間距、直徑和數量,拼點與梁端之間的距離,梁和柱的翼緣、腹板厚度,柱的軸力,觸面的摩擦系數,翼緣和腹板拼板的厚度等因素的影響。
  4. Its scope of business involves the whole standard welding technology and no - lead welding technology, involving moulding, stripping, chipping, plug - in, welding and cleaning

    產品涉及成型、剝、貼片、波峰、浸和清洗等整個常規工藝流程和工藝流程。
  5. According to the engineering experiences obtained from the laying of a jointless track of high - speed communication line - line 3 in dalian city, this paper introduces in general the laying technology, particularly the long rail welding, the construction site welding, seamless track spreading and trak controller laying, and discusses problems often occuring in long rail wedling and seamless track laying

    摘要根據大連市快速軌道交通3號一次性鋪設碎石道床路的工程實踐,介紹了長鋼軌基地、單元軌節的工地路鎖定和鋼軌伸縮調節器的鋪設等技術,並對長鋼軌路鋪設中應注意的問題進行了探討。
  6. Connectors for electronic equipment - tests and measurements - part 16 - 20 : mechanical tests on contacts and terminations - test 16t : mechanical strength wired termination of solderless connections

    電子設備連器.試驗和測量.第16 - 20部分:觸點和終端的機械試驗.試驗16t :機械強度的電終端
  7. Copper and aluminum unified core or all copper core : header pipe diameter up to 22mm or 25mm, few welding line, high intension, and strong pressure resistance

    板芯以銅鋁復合為主或全銅,集熱管直徑達22mm或25mm ,無焊接線,高效能,強承壓。
  8. Aiming at the problems of the k190jik rail welding machine, that the parameter modification is difficult, the welding process is not enough stability and the welding machine has no on - line diagnosis function, in this paper, the control system of the welding machine was promoted completely adopting the fx2n - 64mr programmable logic controller and the pcl - 1800 data acquisition card, the das ( data acquisition system ) was set up by using labview and visual basic software, the functions of welding voltage stabilizing and adjusting, current controlling and intellectual modification was improved, welding quality diagnosis system was built up, and the assembling and debugging of the control system was completed, including the process experiments

    本文針對k190jik鋼軌機控制系統存在參數修改困難、過程不夠穩定、質量在診斷功能等問題,採用日本三菱公司fx2n - 64mr可編程序控制器、研華工控pcl ? 1800數據採集卡等為核心控制部件,對機的整機控制系統進行了全面升級。運用軟體labview和vb開發了數據採集系統,完善了穩壓、調壓、電流恆值控制與智能調節功能,利用vb建立了質量在診斷系統,並完成了系統組裝調試與工藝試驗研究工作。
  9. This paper discusses the applicable ranges of current welding long rail techniques under various construction circumstances of urban rail transit project, and holds that the engineering scheme of the welded - rail site, the viaduct welded site and the utilization of mobile touch - weld vehicle shall be adopted

    針對城市軌道交通工程中不同的施工環境,對比分析了現有的各種長鋼軌方法和適用范圍,探討了現場軌基地、高架橋上的軌基地及利用移動式軌車路長鋼軌的施工方案。
  10. Non - destructive examination of welds. radiographic examination of welded joints. acceptance levels

    損檢驗.縫的x射照相檢驗.驗收水平
  11. Type nhss wire rope pulling hoist is widely suitable for use in bridge - construction, laying of large - size pipes, installation and adjusting of machinery an electric apparatus, and large reaction tower of petrochemical industry ; the installation and alignment of storage tanks ; erecting, fitting, welding and alignment of masts, steel concrete timber structures ; laying and translocating of rails and sleepers ; loading and unloading bulky heavy goods during transportation. cable tensioning ; demolishing of gallery supporting logs ; stacking forrestry wood ; and othersimilar cases. the hoist of this series is especially suitable for use in narrow working sites of limited space, where the job is high above the ground or in open air places, in tunnel of deep well, where no power for traction or lifting is available

    Nhss型鋼絲繩手扳葫蘆可廣泛用於建築施工、大型管道鋪設、機電設備和石油化工大型反應塔、儲罐的安裝、校準、鐵塔及其它鋼木結構的豎立、拼裝、校準、鐵軌、枕木的鋪設、移位、交通運輸中笨重貨物的裝卸、電張緊、坑道支撐木的拆除、林區木材的集放等等,對于局部空間受到限制的狹窄工作場所、高空作業、野外作業、坑道、深井作業和機電供能場所的各種牽引、提升作業、選用本系列產品尤為適宜。
  12. Solderless connectors, without insulating sleeve, for copper conductors

    第1部分:銅導絕緣套管的非
  13. Terminal ends for solderless connections ; ring type, without insulating sleeve, for copper conductors

    端.銅導絕緣套管環形連
  14. Terminal ends for solderless connections ; pin type, without insulating sleeve, for copper conductors

    端.銅導絕緣套管的插針式連
  15. Commercial building telecommunications cabling standard - part 2 : balanced twisted pair cabling components - addendum 4 - solderless connection reliability requirements for copper connecting hardware

    商用建築電信電纜敷設標準.第2部分:對稱雙絞合電纜敷設.補充件4 .銅制連硬體的的可靠性要求
  16. The seven items are : ( 1 ) welding in the long - rail foundation

    一次性鋪設跨區間路的七個主要的作業項目為: ( 1 )長軌基地
  17. Mr joe but tin - fu, chairman of sun east technology, noted : " we anticipate strong demand for lead - free soldering equipment as the new lead - free requirements for the electronics industry are fully implemented in july 2006 in europe and china

    合資廠的面積達3 , 500平方米,預期每年可生產100臺鉛迴流爐。德日主席梁權表示:德日的主要產品為鉛迴流設備,為smt生產的主要設備。
  18. So as to meet the new requirement of free - plumburm jointing of international copper foil coated panel and printing circuit board, our company introduces high quality blue kraft paper to meet the demand of the customers

    針對國際覆銅板、路板行業的鉛化要求的新規定,我司特推出此款藍色熱壓層墊紙以滿足客戶的要求。
  19. Non - destructive examination of welds - radiographic examination of welded joints

    損檢驗.頭射照相檢驗
  20. Non - destructive examination of welds. radiographic examination of welded joints

    損檢驗.頭的x射照相檢驗
分享友人