物料平衡期間 的英文怎麼說

中文拼音 [liàopínghéngjiān]
物料平衡期間 英文
material balance period
  • : 名詞1 (東西) thing; matter; object 2 (指自己以外的人或與己相對的環境) other people; the outsi...
  • : 名詞1 (材料; 原料) material; stuff 2 (喂牲口用的穀物) feed; fodder 3 (料器) glassware 4 (...
  • : Ⅰ形容詞1 (沒有高低凹凸 不頃斜) flat; level; even; smooth 2 (高度相同; 不相上下) on the same l...
  • : Ⅰ名詞1 (秤桿) the graduated arm of a steelyard2 (稱重量的器具) weighing apparatus3 (姓氏) a...
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • 物料 : item,material,part
  • 期間 : time; period; course; duration; term
  1. To improve understanding of the processes of heterogeneous land surface - atmosphere interaction, the utilization of satelli te remote sensing is indispensadle. in this paper, with the aid of satellite remote sensing and fiend observational data which observed during intensive observation of huaihe river bain energy and water cycle experiment hubex in 1998, the surface albedo, ndvi normalized difference vegetaton index and surface temperature in regional scale of hubex could be derived. then, the distribution of regional energy balance components could be estimated. this wor provided the physical foundation for the numerical simulation of the huaihe river basin energy and water pro cesses, and is important for us to further analyze the regional distribution of surface characteristic parameters ad energy balance components with the change of the weather situation in hubex in 1998. our work is still in a developing stage, some methods of retrieval in the paper should be improved further

    利用1998年淮河流域加密觀測試驗hubex iop的資,進行淮河流域能量的參數化方案的研究,用noaa衛星的avhrr資建立了試驗區地表特徵參數及能量各分量的參數化方程,並對衛星遙感反演結果和試驗觀測值進行了對比,為淮河流域能量和水循環的數值模擬提供了理依據。
  2. The main research contents are as follows. 1 ) the characteristics of semi - process industry based on make - to - order are studied, which means that the purchase tune is long while the due date is short, the working procedures are successive and discontinuous. then the general structure of production system based on make - to - order mode in semi - process industry is put forward, which includes estimate of the dynamic finite resources, evaluation of the order based on rough capability balance, material requirement planning, production plan, order tracing, collection and feedback of the local data etc. they all together form an integrated and closed loop system as a whole

    研究的內容主要包括: 1 )研究了半流程製造業面向訂單生產模式具有的采購長、交貨短和工序連續但工序斷的特點,並基於此提出了適應半流程製造業面向訂單生產的系統總體結構,其主要內容包括動態有限資源能力評價、基於初能力的訂單評估、需求計劃和生產作業計劃、以及訂單跟蹤和現場數據的採集和反饋等,它們在總體上形成了一個集成的和閉環的系統。
  3. When the data of logistics in current process are used for input of simulating logistics in future 100 % continuous casting process, supply of hot metal from iron - making process may not satisfy the needs of 100 % continuous casting on raw materials. because planning scheme in continuous casting process depends greatly on smelting scheme in convertor vessel, it is important for operator to balance raw materials supply, smelting and casting in order to realize the scheme of 100 % continuous casting. when some equipment are work abnormally, mixer of hot metal and lf furnace can be used for logistics buffer

    用攀鋼煉鋼生產數據對模擬軟體系統進行的測試和模擬研究結果表明:模擬系統的隨機數發生演算法可以實現對作業時的依分佈隨機抽取;在相似的輸入條件下,模擬結果與實際生產流的時分佈規律基本吻合,達到了模擬軟體設計的預目標;若以攀鋼提釩煉鋼廠現工藝的鐵水輸入作為全連鑄后的輸入條件,則現工藝的供應能力可能難以滿足全連鑄生產的要求;連鑄機的連澆計劃對轉爐爐次計劃的編制有很高的要求,合理安排來、煉鋼與澆鑄三者關系將是保證全連鑄作業的重要條件;當出現設備異常情況時,可以利用混鐵爐與lf爐站前等待作為流緩沖池,通過延長系統的流時來緩解因設備檢修和故障等擾動所造成的影響,確保生產的順利進行。
  4. In the study of the multi - objective cooperative optimization on makespan, the relationship between various balancing indices with the system objective is analyzed ; the result of co - evolution optimization and result of serial optimization is compared and analyzed ; the algorithm is given. based on the decision schemes of co - evolution, the multi - objective decision is made. in the model of leveling the material flow, the model of minimizing usage rate is extended to all levels of materials in the flow line, and a new model is built up, based on the makespan ; the objective of leveling the material flow is combined with the line balancing firstly

    在基於製造周( makespan )的多目標協同優化中,研究了各種指標與系統目標之的關系,將協同優化的結果與串列優化的結果進行了比較分析,給出了混合流水線協同優化與多目標協同優化的具體演算法,並且在多目標協同優化得到的決策方案集的基礎上,進行了多目標決策;在基於流的多目標協同優化模型中,將零部件使用速率的均勻化模型推廣到流水線上各個層次供應(流)的準化問題,首次在makespan的基礎上將準化目標與混合流水線的設計有機結合起來,根據頂層和低層的不同特徵,分別建立了頂層流的準化模型和低層流的準化模型,進一步地研究了帶資源供應約束型的準化模型。
分享友人