牽綜 的英文怎麼說

中文拼音 [qiānzōng]
牽綜 英文
pull rope
  • : Ⅰ動詞1 (拉) lead along (by holding the hand the halter etc ); pull 2 (牽涉) involve; implic...
  • : 綜名詞[紡織] (織布機上使 經線交錯著上下分開以便梭子通過的裝置; 綜片) heddle; heald
  1. Distraction osteogenesis for treatment of temporomandibular joint ankylosis accompanying with mandibular micrognathia and obstructive sleep apnea syndrome

    骨性顳下頜關節強直伴小頜畸形及阻塞性睡眠呼吸暫停合征的引成骨治療
  2. Effect of distraction osteogenesis combined with postoperative rehabilitation nursing on obstructive sleep apnea syn - drome after ankylosis of temporomandibular joint

    張成骨並術后康復護理對顳凳關節強直后睡眠呼吸暫停合征的作用
  3. Due to shorten much time of treatment, the technique has broad prospects in the field of orthodontics

    本文就牙周膜張成骨術使尖牙快速移動的研究進展作一述。
  4. Rolling stock for electric traction ; terms, survey

    電力引用機車車輛.第1部分:術語
  5. As a comprehensive industry that integrates food service, accommodations, transportation, touring, shopping and recreation, tourism industry has a substantial impact on a variety of social and economic fields

    旅遊業是集吃、住、行、游、購、娛為一體的合性產業,涉及面廣,關聯性強,一發而動全身。
  6. Biznet is an innovative event management solution that combines an integrated on - line delegate registration system together with a state of the art matchmaking and 1 - 2 - 1 appointment scheduling software package

    Biznet是一種創新活動相結合的合管理辦法網上登記制度將連同現狀和線1 - 2 - 1任命軟體包列表
  7. In addition, fuzzy synthesis judge method for fault diagnosis in electric traction system is introduced

    除此之外,還介紹了電氣引系統故障診斷的模糊合評判方法。
  8. With the government of chaoyang district taking the lead, the beijing cbd development & construction co., ltd. was founded on july 4, 2002 with joint investment of beijing cbd investment and service center, cosco real estate development co., ltd. and beijing chaoyang urban construction and integrated development co., ltd., and the registered capital was rmb 425 million yuan

    北京商務中心區開發建設有限責任公司是由朝陽區政府頭,北京商務中心區投資和服務中心、中遠房地產開發有限公司、北京市朝陽城市建設合開發公司共同出資組建, 2002年7月4日注冊成立,注冊資本為4
  9. The essence of acupoint and the convergence of acupoint and theprimary afferent neurous of viscera at the prospinal cord or in the spinal cord were overvicued, which partly explained the mechanism of the acting specificity of acupoint, the referred pain of viscera and the acupuncture analgesia

    本文述了穴位實質及穴位與內臟的初級傳入神經在脊髓前、脊髓內匯聚,部分地解釋了穴位作用的特異性、內臟涉痛與針刺鎮痛的機制。
  10. Practice of traction substation combined automation system of shanghai metro line no

    淺議上海軌道交通9號線引降壓變電所合自動化系統的實現及其主要功能
  11. This equipment is not satisfied with the requestment of reactive power and the improvement of power factor

    研製一種適應引負荷特點的新型合補償裝置具有重要的經濟意義。
  12. Counter measures and suggestions are forwarded specifically for prevention from voltage loss of power supply system and for the synthetic control of power energy quality

    分別就防止引供電系統電壓損失和電能質量合治理問題提出了相應的對策和建議。
  13. Abstract : the essence of acupoint and the convergence of acupoint and the primary afferent neurous of viscera at the prospinal cord or in the spinal cord were overvicued, which partly explained the mechanism of the acting specificity of acupoint, the referred pain of viscera and the acupuncture analgesia

    文摘:本文述了穴位實質及穴位與內臟的初級傳入神經在脊髓前、脊髓內匯聚,部分地解釋了穴位作用的特異性、內臟涉痛與針刺鎮痛的機制。
  14. Abstract : in mixed - interface modal synthesis method, the substructural displacement is considered as the synthesis of the elastic displacement to interface free - points and the implicated displacement produced by the fixed - points

    文摘:在混合界面模態合法中,子結構的節點位移被視為相對于對接界面約束節點的彈性變形和伴隨約束節點的連運動位移之和。
  15. People, ship and environment are all dynamic states, which form a comprehensive and mutual implication system. applied dynamic layout theory and optimum cybernetics make the comprehensive policy and dominance on system uncertainty due to complexity and changeability of the sea environment

    人、船舶和環境都是動態因素,是一個十分復雜的相互連系統,應用動態規劃理論和最優控制理論,對航行環境的復雜性和可變性而導致系統不確定性作出合決策和控制,並對改向決策后的船舶操作運動進行控制實現。
  16. Electrification is the promising trend in the development of railway pulling - forces. however, the right moment to take this transformation should be determined after comprehensive evaluations for it is affected by the economic level of the country, the project investment, the developing trend of energy and the ratio between petroleum and electricity, etc

    電氣化改造是鐵路引動力的發展方向,但由於受國家經濟發展水平、工程投資、能源發展趨勢、油電比價等因素的合影響,改造時機的把握必須經過合的評價才能確定。
  17. In the experiment system, the embedded real - time system is used to realize the communication management device

    在實驗系統中,引變電所合自動化系統內的通信管理裝置利用嵌入式實時系統編程實現。
  18. Secondly, the communication information between ias and psmis is discussed. and the different purposes of these information are discussed

    其次,本文對引變電所合自動化系統與引供電運營管理信息系統的交換信息內容進行了討論並對各類信息的交換目的進行了闡述。
  19. Finally, some program and experiments are carried out for an experiment system consisted of two sets of ias and one set of communication sub - system in psmis

    最後,本文對一個由兩套引變電所合自動化系統和一套引供電運營管理信息系統的通信子系統組成的實驗系統完成了編程並進行了實驗。
  20. So, the demand and the structure of the communication network in ias are discussed firstly. then the channel and the structure of the network from ias to psmis are analyzed

    因此,本文首先討論了引變電所合自動化系統的通信網路要求和網路結構以及合自動化系統與管理信息系統信息交換的通信通道和網路結構。
分享友人