現場工地 的英文怎麼說

中文拼音 [xiànchǎnggōngde]
現場工地 英文
site
  • : Ⅰ名詞1 (現在; 此刻) present; now; current; existing 2 (現款) cash; ready money Ⅱ副詞(臨時; ...
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 現場 : 1. (出事地點) scene 2. (工作地點) site; spot; on-site; work field
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土程領域至今尚未解決,甚至不為人注意的考慮基變形的基承載力問題進行了實用化的探討,提出了考慮基變形的基承載力上程計算方法;對基於彈塑性理論分析的基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事程振動試驗及相關課題的研究作,本文以截頭錐模型模擬基,對基(巖基)承載力的動測法進行了研究,為各類基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年載荷試驗的程實踐,對深井荷試驗裝置的核心部分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  2. In this paper, the application of centum cs1000 of yokogawa in the benzene chloride production is discussed. the system struct, software and hardware of the engineering workstation and human interface station, system configuration, safety property and grounding are also studied

    本文以實際程為背景,論述了橫河的centumcs1000在氯化苯生產過程中的應用,對系統選型、程師站和操作員站軟硬體配置、控制站配置、系統組態、安全性、接等問題進行了一定的探討。
  3. Simultaneously, combine with his own work experience, the author gets an advanced detail and general design steps. and then illustrates an actual engineering which is designed with the article ’ s recommendatory method and steps. by combining with the test results, it is proved that the ground treatment result obtains the design requirement and the commendatory method is right, which is able to provide reference value to the engineering

    本文首先對加筋土的研究狀做了詳細的介紹和分析,在此基礎之上,對加筋土基設計方法做了一定的研究,對基承載力力設計方法做了對比分析,選擇極限分析法作為本文的推薦方法,並結合作者自身的作經驗,提出了加筋土基詳細和全面的設計步驟,然後用一個加筋土基實際程為例,採用本文推薦的設計方法和步驟進行設計,並通過試驗結果,證明該基處理達到設計要求,也證明了推薦方法計算的準確性,這對廣大程師在實際程操作中有較高的參考價值。
  4. For improve site soil condition and ensure piling work safety, we have worked out dewater construction proposal

    為改善條件,保證壓樁程的安全進行,編制降水程的施方案
  5. Post - earthquake field works - part 3 : code for field survey

    作第三部分:調查規范
  6. The article structure the landslide prevention and cure, the structure of prestress anchors and its application in detail. basing on the geology condition of fabricating yard, we calculate the solid power and the length of anchor rope. we have worked out the experiment research scheme, and has carried on the earlier stage experiment, field demarcation experiment and has opened pulling the experiment on the spot. ten teams of steel rope to two teams of structure types twist the experimental data that thread internal stress and the total pulling force has been in progress research, and has put forward raising the measure of solid capability of prestress anchor and administering possessing

    本文以川藏公路滑坡路段為研究對象,對滑坡的治理、預應力錨索的結構、作用及其在滑坡防治中的應用進行了詳細的分析;基於施質條件,對錨索錨固力及錨索最佳錨固段長度進行了理論計算;制定了實驗研究方案,進行了前期實驗、標定實驗、實張拉實驗;對兩組結構型式的十組鋼絞線內應力及總張拉力的實驗數據進行了研究,提出了提高預應力錨索錨固性能的措施,以及具體的施方案和施藝。
  7. To further enhance safety and quality supervision of building works, the buildings department introduced in august 2000 the quality supervision plan system requiring private building professionals and contractors to strengthen supervision of foundation works and ground investigation field works

    為了進一步提高建築程的安全及質量監督,屋宇署於二零零零年八月推行質量監計劃書制度,要求私營機構的建築專業人士和承建商加強監督基礎程及勘測程。
  8. Post - earthquake field works - part 4 : assessment of direct loss

    作第4部分:災害直接損失評估
  9. It can make local engineers monitor the water timely and use mitigation measure when accident happen timely, and it enhance the degree of automation in many bumping stations

    它可以使程技術人員能夠及時對所需測量的水(閘)位進行監視控制。它提高了各種水庫、泵站的自動化程度。
  10. The development manager ' s on - site ( field ) supervisory, clerical and administrative personnel

    開發管理人的)監理、文書和行政人員。
  11. A number of truth - seekers requested more information about master, as well as sample booklets and news magazines, and some humbly approached our members with spiritual questions. they expressed great admiration for master s generosity and compassion, after learning from our staff about her teachings and charitable acts of helping needy people around the world

    有些求道人士則進一步詢問有關師父的訊息和索閱樣本書新聞雜志,或虛心作人員請教修行問題,經的同修向他們介紹師父的教理及師父幫助全世界不幸人們的善舉后,來賓均深表贊同師父的慷慨義行和慈愛之心,並高興帶走樣書及新聞雜志分享給親友。
  12. Those site staff who frequently exposed to work above 35 c or exposed to work outdoors are entitled to enjoy grade a standard. others are entitled to enjoy grade b standard

    主要作在露天作業及經常在攝氏三十五度以上點作業的人享受甲級標準。其他人員享受乙級標準。
  13. At the exhibition for new technologies and new products, the booth of schneider electric was swarmed with people. all sorts of medium voltage distribution products were demonstrated at the site. everyone benefited a lot from the engineer s elaborating and the mutual information exchange

    與此配合的新技術新產品展示會上,施耐德電氣的展位人頭攢動,中壓配電的各項產品都在展位進行了實演示,程師的詳盡講解及與觀眾間的信息交流都使大家受益非淺。
  14. Post - earthquake field works - part 2 : safety assessment of buildings

    作第二部分:建築物安全鑒定
  15. For example, workers in the field delivery drivers, maintenance workers, inspectors, and others can use an ffa application on a handheld device to collect and transmit data from remote locations

    例如,作人員(送貨司機、維護作人員、檢查人員及其他人員)可以使用手持設備上的ffa應用程序,從遠程點收集和傳輸數據。
  16. The effect of blast quake, the rule of slope failure and the controlling technique were made up as a whole in this paper to research. the main research foucs on : first, investigation of in site engineering geology and hydrological geology ; second, blast design and in site measurement : on the basis of the first stage work, considering special rock condition, blast design, blast test and measurement in site were made in the same time. the propagation rule of blast wave in the process of rock excavation, blast quake space and the effect of blast on rock slope were studyed

    本論文將開挖爆破震動效應和邊坡巖體火穩破壞規律及其控制技術作為一個整體進行研究,主要研究內容包括:質水文質調查研究;爆破方案設計和測試:在質水文質調查研究基礎上,結合特定條件下的巖石條件進行爆破方案設計,同時進行爆破試驗和監測,研究路塹開挖過程中爆破產生的震波傳播規律、爆破振動及爆破對巖質邊坡的影響。
  17. I can ' t remember ever going on a field check or some group sessions without coming back with at least one idea that could help us do a better job

    我幾乎每一次到產品銷售勘察以及參加一些團體座談會回來后,至少都會產生一個新的創意來幫助我們將作做得更好。
  18. The spot measurement : the designer goes to the spot to measure the area and position of the room wall, heating system, doors and windows

    測量:設計師到施測量,包括房間墻壁面積、門窗暖氣面積及位置。
  19. Through in - situ prospecting, the data about the region and near region seismic activity, geological tectonics as well as the earth geophysical fields have been gained and, the seismic risk analysis of this site has been carried out

    通過勘察,獲得區域、近區域震活動、質構造、球物理等資料,並對址進行了震危險性分析。
  20. Where it is necessary to remove a permanent or temporary handrail or fence to gain access to a work area a temporary handrail must be provided whenever the opening is not being used specifically as an access

    在有必要移去永久性扶欄而得以進入方,無論通道口是否專作通道之用,均須設置臨時性扶欄。
分享友人