現場施工 的英文怎麼說

中文拼音 [xiànchǎngshīgōng]
現場施工 英文
site operation
  • : Ⅰ名詞1 (現在; 此刻) present; now; current; existing 2 (現款) cash; ready money Ⅱ副詞(臨時; ...
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 現場 : 1. (出事地點) scene 2. (工作地點) site; spot; on-site; work field
  • 施工 : be in the process of construction; be under construction; build; construction
  1. The local directional drilling is just staring in terrane, the equipments and the technologies ca n ' t satisfy far and far the spot construction needs, according to current circumstance and considing the existed equipments, the author put forward drilling by air hammer in terrane, having designed compounded - drilling tools, and recommended technology parameters. producing experiments have obtained good achievements in economic and in techniques

    國內定向鉆進鋪管技術在巖層只是剛剛起步,設備、藝遠遠不能滿足現場施工需要,本文針對國內、外巖層定向鉆進非開挖設備及狀,結合國內大多單位的已有設備,提出巖層空氣潛孔錘導向鉆進法,設計了適合巖層鉆進的實用鉆具,並提出具有針對性的藝參數,生產性試驗取得了良好的經濟技術指標。
  2. In the highway blacktop design criterion ( tjt014 - 97 ), four methods are recommended to the value of the modulus of resilience of the roadbed. however, the limitation of the methods induce disconnection between the designing modulus index and the compaction in the process of field construction

    盡管行《公路瀝青路面設計規范》 ( tjt014 - 97 )中,推薦了4種不同方法確定路基回彈模量值,但是由於這些方法的局限性,導致路基設計回彈模量取值與現場施工壓實過程脫節。
  3. For improve site soil condition and ensure piling work safety, we have worked out dewater construction proposal

    為改善現場施工地條件,保證壓樁程的安全進行,編制降水程的方案
  4. Due to complex and varied geological conditions for 4 headrace tunnels at zipingpu project, real time monitoring technique was used during informatization construction according to new austrian tunneling method, system observation for typical sections was conducted by following in - situ construction, based on which inverse analysis for rock mechanics parameters was conducted

    針對紫坪鋪程4條引水發電隧洞復雜多變的地質條件,採用新奧法隧洞信息化中倡導的實時動態監測技術,跟蹤現場施工進行了典型斷面的系統觀測,在此基礎上進行了圍巖宏觀力學參數的反分析研究。
  5. The construction of foundation, it is that the directions of development are full - length, integrant, preliminary of factory ' s and mechanization in

    國外的在深水基礎上的主要動向也十分明確,即向基礎結構的大型化及整體化、藝的廠預制化及現場施工機械化的方向發展。
  6. This paper studies the reliability of structure during the construction period based existing data and the consideration of structural resistance increasing with time, and analyzed an example, the result of the analysis shows this method is available to the analysis of the structure reliability

    在已有的鋼筋混凝土結構現場施工活荷載統計資料的基礎上,考慮了抗力在期間隨時間增長的特性,研究了結構的可靠度,分析了算例。
  7. 3. combining with field constuction, the factors influencing the construction quality of cement power - sprayed piles are analyzed, and the often - occured quality defects are discussed. then the author puts forward the constructive measure for coping with the quality defects

    結合現場施工實際,對影響粉噴樁質量的因素作了分析,並對經常出的質量問題作了探討並提出了處理措
  8. The technique of cement power - sprayed piles is one of improving soft - soil roadbed technology presently. combining with the construction and field tests of nanjing - qidong railway, some research of using cement power - sprayed piles to improve soft - soil roadbed was conducted and the research includes several aspects below : 1. the authour first introduces the formation. distribution, physical mechancial behaviour and engineering characteristic of soft soil, and clarifies the necessity of improving soft - soil roadbed

    本文結合寧啟鐵路程的水泥粉體噴攪樁(簡稱粉噴樁)復合地基的現場施工及試驗,對粉噴樁加固軟土路基作了研究,具體研究內容包括以下幾方面: 1作者首先介紹了軟土的成因和分佈,軟土的物理力學以及程性質,闡明了軟土加固處理的必要性及目前軟土路基加固處理的方法。
  9. On the field construction of storage tank, the hoisting structure of electric block, by means of mechanics analysis and computation, can determine the amount which the electric block requires, the size of its side column and central column and its connecting forms, thus eventually reasonably allocating construction tools and decreasing the consumption of assistant materials only when the construction security is guaranteed

    摘要儲罐現場施工中,電動葫蘆提升結構可通過力學分析、計算,確定所需電動葫蘆的數目、提升組合結構中邊柱和中心柱的規格尺寸及其連接形式,達到在保障安全的前提下合理配置機具、減少輔助材料消耗的目的。
  10. High bridge pier construction belongs to the special structure construction category, the choice of site construction plan has stressed continuously in the experience and neglected the construction stress analysis

    摘要橋梁的高橋墩屬于特種結構范疇,現場施工方案的選擇一直以來偏重於經驗而忽視受力分析。
  11. Abstract : in view of, in the modification and maintenance of petro - chemical unit, the limited working space and inability of available hoisting equipment to meet hoisting installation requirements, a simple and reliable hoisting tool used is introduced taking account of the construction conditions

    文摘:在石油化裝置大型設備的技術改造和檢修作業中,針對現場施工空間小、有吊裝設備無法滿足要求的情況,介紹了因地制宜設置簡單可靠的吊裝機具,完成吊裝作業的方法?門架旋轉作業法的成功應用。
  12. The contractor ' s workforce will not be allowed to commence work on site until all certification has been presented to the construction manager or his nominee

    在承包商未向經理或其指定人提供所有資質證件前,承包商隊伍不得開展任何現場施工作。
  13. All mobile equipment when first arriving at the site must be inspected by the construction manager or his nominee and carry current state certification if required

    所有移動設備首次抵達時,必須由現場施工經理或其指定人進行檢查。並且,在需要的時候,應攜帶所需檢查設備的行申明證書。
  14. For those who work on the site, bridging is hard in other ways.

    在其它方面,對現場施工人員來說,架橋則是一項很艱苦的作。
  15. Fibre - cement pipelines - guide for laying and on - site work practices

    纖維水泥管.敷設和現場施工指南
  16. Fibre - cement pipelines - guide for laying and on - site work practices ; german version en 1444 : 2000

    纖維水泥管.敷設和現場施工指南
  17. The company also built a museum to reserve song dynasty kilns and relics ( 800 years ago ) discovered during the plant site construction with an investment of 6. 2 million rmb

    公司亦投資620萬元修建博物館,異地保存在現場施工時發的距今800多年的宋代瓷窯及文物。
  18. The sidetrack technical keys in ultra - deep well such as engineering design, selection of the kop, field operation and drilling parameters are discussed as well as the field operation rules, which can be beneficial to sidetracking operations in ultra - deep wells as reference

    程設計、造斜點的選擇、現場施工、鉆井參數等方面討論了超深側鉆井的技術要點以及現場施工的規律,對于超深井側鉆具有一定的借鑒意義。
  19. In this thesis, the construction technology of ballastless slab track and ballastless embedded sleeper track are systemically researched and investigated in combining with the real engineering on gouhe bridge and shahe bridge

    本文結合秦沈客運專線新線狗河和沙河大橋現場施工,對板式無碴軌道和長枕埋入式無碴軌道技術進行了系統的研究、探索。
  20. For avoiding harmful cracks in concrete structures during construction, this paper analyzes the possible causes of concrete cracks in yangshan port project, proposes control measures for concrete cracks, and describes the inspection and repairing of concrete cracks, so as to ensure the concrete construction quality of yangshan deepwater port engineering, serving as a reference for field concrete construction

    摘要為盡可能避免混凝土構造物在階段發生有害裂縫,對洋山港區程混凝土裂縫的可能成因進行分析,提出控制混凝土裂縫的措,並介紹混凝土裂縫的檢測和修補作,以確保洋山港區建設程的混凝土質量,可供現場施工參考。
分享友人