現場監測 的英文怎麼說

中文拼音 [xiànchǎngjiān]
現場監測 英文
field monitoring
  • : Ⅰ名詞1 (現在; 此刻) present; now; current; existing 2 (現款) cash; ready money Ⅱ副詞(臨時; ...
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • : 監名詞1. (古代官府名) an imperial office 2. (姓氏) a surname
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • 現場 : 1. (出事地點) scene 2. (工作地點) site; spot; on-site; work field
  • 監測 : monitor; survey監測車 monitoring car; 監測船 monitoring ship; 監測電臺 [訊] monitoring station; ...
  1. Based on the research works of predecessor, the theory on the displacement of soil strata in deep foundation excavation construction and its application are studied in detail. by analysing the supervision, statistics from, the practical excavation engineering, soil rheology is thought to be the main reason of the displacement heavy of the soft soil and the destruction of the enclosure structure, in deep foundation excavation construction on condition of the high theriomorphic of enclosure structure and good seepage resitting

    本文在已有研究成果的基礎上,對大面積軟土深基坑開挖時土層變位理論及應用進行了探討:依據現場監測數據,推導出開挖時軟土變形的經驗公式,分析了軟土深基開挖在圍護結構剛度大、基坑防滲效果好的條件下,基坑土層變位、圍護結構受力破壞發展的主要原因。
  2. Six main factors which influence contaminants concentration in tail gas have been concluded and relevant solutions have been offered after on - site monitoring tail gas of automobile and analyzing some problems of tail gas treatment in jiangsu oilfield

    江蘇油田通過對汽車尾氣的現場監測,以及尾氣治理中的一些問題分析,總結出影響汽車尾氣中污染物濃度的六大因素,並提出相應的解決措施。
  3. ( 2 ) it applies in - situ monitoring technique to access deformation of braced country rock and evaluation of its stability. mathematical statistics and grey prediction model are applied to the latter deformation prediction

    ( 2 )採用現場監測技術對軟巖隧道支護后的圍巖變形進行,根據隧道圍巖的變形數據,評價軟巖隧道圍巖的穩定狀態,用數理統計的方法及灰色預模型對圍巖的後期變形進行預
  4. In this paper, the erosional characteristics along the suizhong sarldy coast of the liaodong bay are analyzed by comparing nautical charts in different periods and analyzing remote sensing images and multi - year field monitoring data, and it is shown from the analysis results that the loose coastal sediments and intense coastal dynamic actions are the basic conditions for the recent coastal erosion, and the decrease in terrigenous material discharged into the sea, marine dynamic actions, coastal engineering structures and offshore sand recovery are the main affecting factors for the coastal retrogradation

    摘要通過不同時期海圖對比、分析遙感圖像和多年現場監測資料,分析了遼東灣綏中沙質海岸侵蝕的特點,認為海岸組成物質鬆散與海岸動力作用強烈是本區代海岸侵蝕的基本條件;陸源物質入海量減少、海動力作用、沿岸工程建築和海上采砂是其海岸蝕退的主要影響因素。
  5. In - situ testing study on lining system of double - arched tunnel

    雙連拱隧道支護體系現場監測試驗研究
  6. One of the research and developing hotspots on oil monitoring is study on the online oil monitoring sensor, because it is useful for us to monitor the equipment, which operates hour after hour, the equipment require good security and important equipment real time

    為了解決大型的連續作業設備、關鍵設備和安全性要求高的設備的實時現場監測與診斷問題,在線油液傳感器的研製已成為油液技術的研究和開發熱點之一。
  7. In order to solve the real - time monitoring and fault diagnosis problems of the huge key equipment, continuous operating equipment and high - security equipment in fields, development of on - line oil monitoring system is becoming very important in the area of condition monitoring

    為了解決大型關鍵設備、連續作業設備和安全性要求高的設備的實時現場監測與故障診斷問題,研製新型在線油液系統成為設備技術研究與開發的熱點。
  8. And the choice range of hydration coefficient is determined on calculating mass concrete of foundation in high - rise building. at last, combining the test data with the ansys result, some measures about crack - control in construction are summarized. it can be referred to the study on mass concrete of foundation in high - rise building for interaction between concrete temperature field and soil temperature field considered, choice range of hydration coefficient determined, and measures about crack - control in construction summarized in this paper

    最後,結合現場監測的數據和ansys計算的理論值,對高層建築基礎大體積混凝土的溫度裂縫的控制提出了有效的控制措施本文提出考慮混凝土與土壤相互作用的溫度,確定的高層建築基礎大體積混凝土溫度計算時的水化系數的取值范圍以及建議的溫度裂縫的控制措施,對今後建築工程大體積混凝土的研究具有一定的參考價值。
  9. Engineering properties of this new type of fill material are discussed on the basis of laboratory modeling, field measurement and results of testing, thus laying a solid foundation for application of cement solidified soil in the core structure of cofferdams

    根據室內成型試驗、現場監測與檢結果探討了水泥固化土新材料的工程特性等,為水泥固化土新材料在圍埝堤心結構中應用打下了堅實的基礎。
  10. Influence of pile driving on properties of soils around pile and pore water pressure

    靜壓樁沉樁擠土效應現場監測及分析
  11. Using an analytical method of frequency spectrum to monitor the status of a pump and diagnose its breakdowns

    注水泵機組現場監測與故障診斷及排除
  12. According to this practical project, beijing metro no. 10 line crosses under the beijing metro no. 13 line existed station structure, this paper has made an overall and systemic analytical study on crosswise surface settlement and the longitudinal surface settlement process which influence by metro tunnel construction with shield driven method through analyzing a mass of site monitoring data. the settlements in different period are concluded, the crosswise surface settlement influence scope, some construction factors to surface settlement has been analyzed too

    本文針對北京地鐵十號線芍藥居至北土城東站區間隧道下穿既有城鐵十三號線芍藥居車站結構這一實際工程,通過大量的現場監測資料分析,研究了盾構掘進過程中對橫向地表沉降和縱向地表沉降的影響過程;探討了盾構掘進各個階段的沉降占總沉降量的百分比;分析了盾構掘進對橫向地表沉降的影響范圍,以及各種施工因素對地表沉降的影響。
  13. Concrete filled steel tube ( cfst ) arch bridge is a new type of bridge which is widely applied in china recently, and it is a relatively ideal structural form for long span arch bridge. with the background of the practice of liantuo bridge, in the view of point of feasible in technology and reasonable in economy, the key techniques and difficulties in the construction of cfst arch bridge are analyzed and discussed in the thesis. the disadvantages in the current design and construction and the improvement method are also indicated

    本文以蓮沱特大橋工程實踐為背景,以主拱施工研究為主線,對鋼管混凝土拱橋重難點施工工藝,從技術上可行、經濟上合理的角度出發,詳細的進行了分析闡述,並指出了設計施工中存在的不足和今後需改進的方向;通過對鋼管混凝土拱橋施工過程中內力的計算,確定了拱肋施工最不利荷載工況下加載重量、壓重順序和張拉臨時預應力束等一系列施工措施,並將計算結果與現場監測數據進行了比較分析,為今後進一步研究這類結構提供了參考。
  14. The whole design of on - line monitoring system is built in this subject, which system is based on data stream status, running characters, the requirements for in - situ monitor, communication technology and database knowledge. this system used graphic programming language labview for software developing tool and the production of rockwell for hardware

    根據高溫風機系統數據流量狀況、機組運行特點及現場監測要求,結合網路通訊技術和數據庫知識,以圖形化設計語言labview為開發平臺,以美國羅克韋爾自動化公司的硬體模塊為基礎,構建了在線系統的總體設計方案。
  15. By face failure and ground subsidence investigation and in - suit monitoring analysis in some lots of shenzhen metro phase line, especially of lot 3a in which two large ground landlides have occurred in construction, the reasons of ground subsidence are expatiated respectively from three aspects, including the characters of the physical mechanical parameters of stratum above tunnel, the monitoring analysis of stratum deformation and contruction technics causation

    通過對深圳地鐵期工程土建施工中全線部分暗挖標段出的工作面失穩、地表塌陷工程實踐和現場監測結果分析,特別著重對連續2次出地表塌陷的3a標暗挖隧道研究,從隧道上覆地層物理力學性質參數、地層變形分析及施工工藝原因3方面闡述了地表塌陷的原因。
  16. Through site monitor and numerical simulation result, technical measure and parameter optimization were given from foundation stability ; inject slurry ; controlling soil pressure, which mitigate the influence on the structure to least. the best shield construction condition was given at the end

    通過現場監測與數值模擬分析,本文從預加固措施、襯砌背後注漿、開挖面土壓力、盾構推進速度、盾構姿態等方面提出盾構穿越結構物過程中施工技術措施和參數優化及匹配,使推進中對周圍地層、地面、既有結構物的影響最小,得出了最佳盾構推進狀態。
  17. On the base of site monitoring on several multi - arch highway tunnels, this paper introduces some site monitoring methods about the force of reinforcing steel bar, the exterior and interior strain of concrete and the displacement of the wall, which aim at the monitoring of middle wall of multi - arch highway tunnel

    在多座連拱隧道現場監測工作的基礎上,文章主要介紹了主筋軸力量、混凝土表面應變量、混凝土內部應變量,以及位移量等針對連拱隧道中隔墻的現場監測方法,並結合中隔墻主筋軸力量剛,給出現場監測及分析實例。
  18. Off - site surveillance review

    現場監測
  19. Off - site supervision

    現場監測
  20. Based on the analysis of in - situ monitoring data and the numerical simulation of the deformation of sheng - hong - qing tunnel along wujiu railway, it is testified that using back fill along riverside to prevent the creep is reasonable

    摘要通過對武九客運專線盛洪卿隧道施工現場監測資料的研究,結合數值分析論證了該隧道河側採取回填反壓變更設計的科學性,並探討了隧道施工的新方法。
分享友人