現場觀測 的英文怎麼說

中文拼音 [xiànchǎngguān]
現場觀測 英文
shofloor observation
  • : Ⅰ名詞1 (現在; 此刻) present; now; current; existing 2 (現款) cash; ready money Ⅱ副詞(臨時; ...
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • : 觀名詞1. (道教的廟宇) taoist temple2. (姓氏) a surname
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • 現場 : 1. (出事地點) scene 2. (工作地點) site; spot; on-site; work field
  • 觀測 : observe; observation; viewing
  1. Based on testing data in worksite and engineering practice, the strata damage movement characteristics, rock properties of weathered zone and qualitative and quantitative analysis of the mechanism of coal layer safety extraction in efflorescent oxygenized belts were discussed

    摘要根據現場觀測和工程實踐,論述了風氧化帶內煤層開采時,覆巖破壞移動特徵,風化帶巖石屬性和風氧化帶內煤層安全開采機理的定性、定量分析。
  2. The field observation of the sediments of storm surge produced by no. 11 typhoon in 1997 shows that sedimentation rate of storm surge sediments are greater than that of normal astronomical tide sediments, and the grain size shows relative coarse with poor sorting. vertical sequences of the storm sediment show parallel bedding and overlapped by hummock bedding. these characteristics provide good basis for building the index of storm surge deposit

    通過對梁垛河閘9711號臺風的現場觀測並結合目前已有的風暴潮沉積的研究,分析了風暴潮沉積在構造和結構上的特點,從而建立了正常潮灘沉積中風暴潮沉積的識別標志,同時在野外中還發即使在風暴潮期間,高潮灘上部仍存在只有淤積沒有侵蝕的地帶。
  3. The in - situ measurement and analysis of support resistance and top - coal movement in fully - mechanized top - coal caving face of a thick coal seam with dirt band had been carried out in some coal mine, the strata behavior and movement law of top - coal were revealed

    摘要對某煤礦含夾矸煤層綜放面的支架工作阻力和頂煤移動進行了現場觀測和分析,揭示了其礦壓顯和頂煤運移的規律。
  4. According to the geological data which was gained by exploration investigation, establishing a geological model which can reflect rock mass characteristics ; with analyzing the internal and exterior factors synthetically, the deformation and possible failure mechanism and mode of the cut slopes was confirmed which combines with stereoic projection and other techniques ; the stabilities of the 14 high slopes are estimated synthetically by applicable design codes and guidelines. with the estimate result and some other analysis methods, the rock mass mechanical parameters of slope are identified ; as a results, 14 high slopes fall into 4 categories based on rockmass characteristics and discontinuities. the stability and deformation of some typical slopes was analyzed with distinct element method by udec ; the safety factor of some dangerous slopes are calculated by rigid limiting equilibrium method for comparison

    首先著重研究影響邊坡穩定性的內在因素,主要是通過地質勘探、量、現場觀測等手段取得研究區地質體的基礎地質資料,建立起能夠反映地質體結構特徵的地質模型;隨后綜合分析潛在的內外部影響因素,並結合赤平投影對邊坡可能的失穩模式或破壞機製作出判斷;運用已有巖體質量分類方法對沿線14個高陡邊坡穩定性進行初步的評價,並結合試驗研究、經驗判斷、工程類比等手段確定了坡體的巖體力學參數;根據穩定性初步評價結果將研究區14個高陡邊坡按開挖方式分為4大類,並利用離散元程序udec對各類典型高陡邊坡進行了穩定性計算分析;對潛在危險邊坡利用剛體極限平衡法求出了不同工況下的安全系數。
  5. At last, based on the feedback analysis of the data of site investigation, the suggestions about whether to supply drainage measures in the catchment of high - ductility soil area are provided

    最後根據現場觀測資料進行了反饋分析,對在高塑性土區下游側是否有必要增加補充排水措施提出了論證意見。
  6. An observation on ships passing under the bridges of chang jiang river in nan jing has been made on the spot, and the normal distribution laws of the course distribution were proved and the collision influence factor of the bridge was proposed

    對南京長江大橋進行了橋下船舶通行情況的現場觀測,驗證了航跡分佈的正態分佈規律,並得到了該橋的碰撞影響系數。
  7. On the basis of existing studies in the field of seepage of rock mass both at home and abroad, the present dissertation has conducted a broad study in terms of hydraulic and geometric parameters, computing model, basic seepage law, fracture drainage, rockmass " unloading mechanics and its relations with seepage. the paper is written by employing such methods as field observation, model test, theory research and numerical analysis. the main research payoffs are as follows

    本文在充分認識了國內外巖體滲流研究的發展及研究狀的基礎上,結合現場觀測、模型試驗、理論研究及數值分析等多種方法,對裂隙巖體的水力幾何參數、計算模型、基本滲流規律、裂隙排水、巖體卸荷力學及其與滲流的相互作用等多方面進行了研究,取得了如下一些主要成果。
  8. Field observations and measurements and relevant statistics show that the ne - nee and nnw constitute the first and second dominant trends of the discontinuities of the rock mass in the area of the permanent shiplock in the threee - gorge project. of all the discontinuities, the steep dip takes the absolute lion ' s share

    1 、通過現場觀測及統計分析表明,三峽永久船閘區巖體結構面第一優勢走向為ne - nee ,第二優勢走向為nnw ,所有結構面中,陡傾角占絕對優勢。
  9. 1. method that controls quality of field observation values of unbonded elastic wire resistance type meters is studied. methods that examine system error of different types in observation values are discussed

    主要研究內容如下: ( 1 )研究了差動電阻式儀器現場觀測值的質量控制方法;探討了對監數據中不同類型的系統誤差進行檢驗的控制圖法和連檢定法。
  10. Based on the former research, several works in this paper is listed as follow, which is studied by experiment research, theoretical analysis and numerical calculate : firstly, based on local observation and laboratory experiment result, consolidation mechanism of vacuum - surcharge preloading is analyzed form typical mechanics and microstructure seepage factor. a great deal of observed dada is employed to analyze the deformation characteristics of soil after being treated and variation law of pore water pressure

    本文在前人工作的基礎上,通過試驗研究、理論分析、數值計算等手段主要進行了以下幾方面地工作: ( )分析了大量現場觀測成果及室內外試驗資料,從經典力學和微滲流兩個角度解釋了塑料板排水真空-堆載聯合預壓法加固軟基機理,總結了該法加固的土體變形特點、孔隙水壓力變化規律。
  11. Furthermore, because of the scarcity of measurements and data, our work has to be limited to investigating the effect of wave breaking on the ocean surface mixed layer by the numerical models

    同時,由於無法獲得資料,本文所得的波浪破碎對海洋上混合層影響的數值研究結果沒能與現場觀測結果比較。
  12. This thesis takes the hunan yueyang dongting lake bridge 、 changsha hongshan bridge and changsha liuyang river bridge as the project background, supported by the national natural science foundation project “ field measurements of rain - wind - induced cable vibration on the yueyang dongting lake bridge in hunan province ”, carries out some researches as follow : 1. this thesis introduces the development of cable - stayed bridge 、 the necessity to study the cable vibration, briefly introduces the mechanism of cable vibration and cable vibration mitigation measures

    本文以湖南嶽陽洞庭湖大橋、長沙洪山大橋、長沙瀏陽河大橋拉索振動控制為工程背景,在國家自然科學基金項目「斜拉橋拉索風雨振現場觀測與半主動控制研究」資助下,進行了以下研究工作: 1 .介紹了斜拉橋的發展,拉索振動研究的必要性並對拉索振動形態及減振措施進行了簡要的論述。
  13. How to deal with the free surface has been a difficulty if the wave is highly nonlinear

    與實驗方法和現場觀測相比,它有著成本低、可以避免比尺效應、工況選擇靈活等極為突出的優點。
  14. By means of measured dynamic responses of the hydraulic generator at fengman hydropower plant, the indentification algorithm identifies the loading parameters which include the main frequencies, phase differences and amplitudes of vibrating forces

    根據在豐滿水電站現場觀測的水輪機振動響應數據,識別出了水輪機在不同運行狀態下的振動荷載參數,其中包括振動力的頻率、相位差和幅值。
  15. This method has been validated by field observation

    現場觀測驗證是合理的。
  16. Combined with the observation data to a piece of expressway being built, a stable control criterion is given, which can be used to direct the constructing

    本文還對一段施工中的路堤做了穩定分析工作,結合現場觀測數據,提出了一個穩定控制標準,作為指導施工的標準。
  17. Based on the in - situ observation of the firstly mined working face of nanliang coal mine, the roof movement, the roof weighting intensity, and entry deformation and failure of the working face were analyzed

    摘要通過南梁煤礦首采工作面采前的實驗研究和開采時的現場觀測,分析了工作面頂板的移動、來壓強度以及巷道變形破壞情況,總結了厚黏土覆蓋層淺埋煤層單體長壁工作面的礦壓顯規律。
  18. In situ measurement of floor strata displacements in slice mining

    分層開采底板巖層移動的現場觀測研究
  19. The analysed result shows that accords with the actual result

    分析結果與現場觀測結果基本一致。
  20. In this zone, the ocean wave fields are complex and variable due to the influences such as geological, bottomed, shoaling, ocean - engineering factors and currents in coastal zone etc. so the lattice ( multi - point ) situ - observation is not applied and is not practised based on the economical and practical consideration

    特別在長江口區海域,地質、底質、灘塗、海洋建築、航運以及徑流等諸多因素造成波浪的復雜多變,如依靠多布點的現場觀測在效益上不可取,實際操作也是不可行的。
分享友人