用螺栓連接 的英文怎麼說

中文拼音 [yòngluóshuānliánjiē]
用螺栓連接 英文
stud
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • : 1. [動物學] (軟體動物) spiral shell; snail; conch 2. (螺旋形的指紋) whorl (in fingerprint)
  • : 名詞1. (可開關的機件) bolt; plug 2. (塞子) stopper; cork
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • 螺栓 : bolt; screw bolt; threaded bolt
  • 連接 : connect; fit together; link; marry; mate; joint; association trail; linkage; concatenate; concate...
  1. The cross girder center segments of the bents were field bolted.

    構架橫梁的中間段在工地用螺栓連接
  2. The steel construction is made up of roof beam, post, purlin, roofing and wall, adopt the automatic production line to weld and take shape in the factory, construction site spend high - strength bolted joint reduce weld work load, make progress and quality receive the complete assurance

    鋼結構由梁、柱、檁條、屋面和墻體組成,工廠內採自動化生產線焊成形,施工現場高強,減少了焊工作量,使進度和質量得到完全保證。
  3. In this thesis, four types of steel beam - rectangular cfst column connections, including normal welded flange plate ( wfp ) connection, bolted flange plate ( bfp ) connection, stiffened end plate ( sep ) connection and double split - tee plate ( dst ) connection, were designed based on the configuration of steel frame connection. total 8 models, 2 models of each kind of connections were tested under low - reversed cyclic loading at the end of cfst columns. the relationships between force and displacement at the end of columns, the relationships between the moment and rotation of the joints, degradations of strength and stiffness, ductility, failure mechanism and failure characteristics of these four connections under different axial - compression ratios were presented

    本文借鑒鋼框架節點構造,設計了四種類型矩形鋼管混凝土柱與鋼梁節點,包括常規焊( wfp )節點、翼緣全( bfp )節點、雙t板( dst )節點以及加勁端板( sep )節點,進行了四類節點8個模型試件在柱端低周反復荷載作下的抗震性能試驗研究,比較了不同軸壓比下節點的滯回性能、強度與剛度退化、延性、破壞機理與破壞特徵,主要結論有: 1 、節點的位移滯回曲線與轉角滯回曲線為塊型分佈,沒有或略有捏攏現象,耗能能力強; 2 、軸壓比對節點滯回曲線有顯著影響,全部節點都有顯著的剛度退化; 3 、位移與轉角骨架曲線在峰值荷載後有較長的水平或下降段,具有良好的延性性能; 4 、從整體抗震性能上看,翼緣全節點、雙t板與加勁端板節點都優于常規焊節點,可在實際工程中加以推廣。
  4. Activity enclosure adopts steel construction, two - sided internal wall panel or single lamination type color wall panel pass bolted joint. all its parts are formed by standard component, assemble wantonly at the scene, fixing cycle short, the color can be as requested especially made. repeatable disassembly and assembly, without building rubbish, the appearance is beautiful

    活動圍墻採鋼結構柱,雙面夾芯彩鋼板或單層壓型彩鋼板通過而成。其全部部件均由標準件構成,現場任意拼裝,安裝周期短效果好,顏色可根據要求特別製作。可重復拆裝使,無建築垃圾,外觀靚麗。
  5. We are specialized in producing sets of large - hex high - strength bolts, sets of torshear type high - strength bolts, sets of dacrolon bolts and cheese head studs for arc stud welding

    我公司技術力量雄厚,生產設備精良,檢測設備完善,是生產鋼結構高強度大六角副、扭剪型副、達克羅副和電弧柱焊圓柱頭焊釘的專業公司。
  6. During casting internal and external formwork are conneced together using tie forms, n. 2 bars diam. 15mm every 1. 5 m

    澆注混凝土過程中,內模,外模穿墻,每1 . 5米設15毫米2條。
  7. The experiment procedure and analysis result about exteriorly extended end - plate connection with high strength bolt are introduced primarily ; each sample ' s dimension is given. the adding load equipment, measuring apparatus placed, measuring point established is detailed. adding load measure load and m - curve is produced ; the single span gabled frames horizontal displacement formula is deduced when the horizontal concentrated force is applied to it

    重點介紹了外伸端板高強的實驗過程及實驗分析結果,介紹了各組試件的形狀尺寸、加載裝置、測量儀器安放、測點的布置等;給出加載方式及測出的m -曲線;計算出試驗節點的初始剛度;推導水平集中力作下單跨門式剛架考慮節點半剛性的側移計算公式。
  8. The modularized and interchangeable accessories reduce not only the variety of accessory, but also the trouble of user, because the same accessory can be applied to mccb with different rated current and the installation can be implemented without bolt just by the particular connective manner. easy range launched by schneider - electric enriched the family of merlin gerin, brought the customers much more variety of choices, consolidated the leader s position of merlin gerin in the area of electric solutions

    附件的模塊化設計減少了附件的種類,而通性則大大減少了使者的煩惱,同一種附件可適於多種不同電流規格的塑殼斷路器,電氣附件獨特的卡安裝方式可以使附件在不需用螺栓連接的情況下可實現快速的裝配。
  9. In order to predict high - strength bolts pretension and contact - friction in contact zone, status nonlinear in contact zone is adopted in fem model. the computation and analysis on the behavior of beam - to - column rigidity joints subjected to constant axial pressure on the top of column and cyclical load at tip of beam is carried out

    實體模型的建立,考慮了觸區的狀態非線性,以模擬高強的預拉力、區的摩擦觸,對承受軸力的樑柱剛性方式在循環荷載作下的滯回性能進行了計算分析。
  10. Specification for 50 a 650 v flameproof, restrained and bolted plugs and sockets for use in coal mines

    煤礦50a 650v阻燃保險和插頭和插座規范
  11. Water storage, factory - coated bolted steel tanks for

    儲水加工塗覆鋼罐
  12. The commonly used methods of connections, especially the high - strength bolted connection and welding with bolting mixed connections are discussed in more detail. the analysis for the problems, such as partial penetrated butt weld and welding deformation is also discussed in the paper

    對工程中採較多如高強度-焊混合等作了較深入分析;對工程中容易出現問題如不焊透的對焊縫計算方法及可能出現的焊變形及處理等問題也作了較深入探討。
  13. If the confirmed size from the above formula is not practical, it is necessary to apply flange wheel hub and checking board, the checking board should be connected with gear with bolt, and the bolt should be on special pitch circle radius

    21 . 1如果從上面公式確定的鍵槽尺寸不實,那麼應採帶鍵的法蘭式輪轂和檢查板,檢查板用螺栓連接在輪上,處于特別的節圓半徑上。
  14. Square taper washers for high - strength structural bolting of steel i sections

    「工」字形鋼型材高強度的方錐形墊圈
  15. The connection of steel structures is an important part for the steel structural member. the types of connections which are commonly used in practical engineering, such as welding, bolting, high - strength bolting and mixed connections are discussed in this paper

    鋼結構是鋼結構構件的重要組成部分,本文結合工程實踐,著重對鋼結構中廣泛應形式,如焊、普通、高強度和混合等進行了敘述。
  16. 962m respectively ). neighbouring segments are linked with bolts and welding. after the girders were segmented, guesseted plates were used with high - strength bolted oints to connect the web plates, and the higher and lower flange plates were butt - welded

    相鄰梁段之間的形式為焊混合型,採節點板把腹板高強後上、下翼緣板分別對焊。
  17. Bolted connections with reduced shank ; threaded holes for studs

    帶縮徑桿的件.紋孔
  18. Strap - shaped handles for equipment, type for bolted

    第1部分:式設備帶形把手
  19. Sets of torshear type high strength bolt hexagon nut and plain washer for steel structures

    鋼結構扭剪型高強度
  20. The cdc2 project of daikin fluorochemical ( china ) co., ltd, with all joints connected with bolts, complicate stucture and short time limit, was acclaimed byclient from japan

    大金氟化工(中國)有限公司cdc2項目所有節點全部採用螺栓連接,結構復雜,工期短,獲得日本客戶好評。
分享友人