甲板部 的英文怎麼說

中文拼音 [jiǎbǎn]
甲板部 英文
deck department
  • : Ⅰ名詞1 (天乾的第一位) the first of the ten heavenly stems2 (爬行動物和節肢動物身上的硬殼) she...
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
  • 甲板 : deck; deck armour
  1. Wherethe long bridge deck within 0. 5 l amidships is regarded as strengthdeck, the midship section modulus and minimum thickness of the deckplating comply with the requirements of 2. 2. 1 and 2. 4. 2. l of this ischapter

    例1 :在船中0 . 5l區域內的長橋樓作為強力時,其船中剖面模數及最小厚度應滿足本章2 . 2 . 1及2 . 4 . 2 . 1的要求。
  2. As a finishing coat on ships ' exterior hull from rail to load line, steelstructure on deck and similar

    作為面漆塗在船殼外表面欄桿至載水線位,上的鋼結構表面及類似位。
  3. The flight deck measures 333 x 77m and is equipped with four lifts, four steam - driven catapults and four arrester wires

    飛行有333米長, 77米寬,裝備有4升降機4具蒸汽彈射器和4條降落攔阻索。
  4. Half - round bars for protection of lines to be provided at transom stern, poop deck, forecastle deck, and partly on the bulkhead

    為保護纜繩免受損傷,在艉封后、尾樓、艏樓分艙壁處應裝有半圓鋼。
  5. The forward part of the deck of a ship, usually the main deck

    的前面分,通常是主
  6. At rear of main deck there is one sewage standard discharge connection

    3主設生活污水標準排放接頭1隻。
  7. The whole schooner had been overhauled ; six berths had been mad astern, out of what had been the after - part of the main hold and this set of cabins was only joined to the galley and forecastle by a sparred passage on the port side

    整個帆船都翻騰起來,有六個原先在主艙房後的鋪位被移到了船尾而這套艙房只通過舷窗旁的一條木做的兩道與廚房和前相連。
  8. This ship is built of steel, double propellers, double rudders, raked stem, transom stern, two longitudinally continuous decks and four - storey deckhouse with the engineroom located in midship, driven by diesel engines

    本船原為鋼質雙槳雙舵,傾斜首柱方尾,有兩層縱通和四層室,機艙位於中的柴油機客貨船。
  9. Fpsu is a permanent floating unit moored on the fixed turret spm, provided with raked stem, skeg, non propeller, non rudder, non - propelled and non brackets, and the living quarters utility facility are on bow, the helideck is on top of the living quarters, the process facility is on midship production deck, the flare is on stern, the bow is moored on the yoke of spm turret. it is a newly - built tanker based floating production storage unit

    設有傾斜艏柱船艉設有呆木,無槳無舵,非自航,沒有艉框架,居住艙室和公共設施位於船艏直升機位於居住艙室上方,處理設施位於船中的生產上,天然氣放在燃燒塔位於船艉,艏被系固在單點系泊塔的軟鋼臂上,是新造的船型浮式生產儲油裝置。
  10. Shipbuilding. external scuppers. flat deck gratings

    造船工業.外排水口.平上格柵
  11. Every few hours the net is hauled up, and the cod - end, holding between 5 and 150 tons of fish, is pulled up onto the trawl deck ( the aft portion of the main deck )

    拖網每幾個小時就要收起來一次,這時網囊里會有5 - 150噸不等的漁獲,然後網囊會被拖到作業上(主靠近船尾的分) 。
  12. However, when extremely high oblique impacts occurred ( 55 degrees or more ), as on turret roofs and decks, face - hardened armor, due to its brittleness, was a very poor choice since it could break and throw pieces into the region behind it even if the shell glanced off

    然而當炮彈以極大的彈著傾斜角( 55度或以上)擊中炮塔頂時,由於裝的脆性,即便炮彈只是擦過,裝的背面也會破碎飛散,這時表面硬化裝便是個拙劣的選擇了。
  13. The ship ' s hull is a thin - walled box girder structure composed of stiffened panels. the overall failure of a ship hull girder is normally governed by buckling and plastic collapse of the deck, bottom, or sometimes the side shell stiffened panels. therefore, the analysis of buckling and ultimate strength of ship panels in deck, boltom, and side shells is very important and necessary for the safety assessment of ship structure. in stiffened panels, local buckling and collapse of plating between stiffeners is a basic failure mode, and thus it would also very important to evaluate the buckling and ultimate strength interaction of plate elements under combined loads

    船體梁的總體失效通常取決于、船底,有時候是舷側加筋的屈曲和塑性破壞。因此,對于衡量船體結構的安全性而言,對、底、舷側進行屈曲和極限強度分析是十分重要且必須的。對于加筋而言,加強筋間的格之局屈曲和失效是最基本的失效模式。
  14. It is said that a navy unit has built a simulated flying deck at its airport in northern china

    據說,海軍某建成了模擬飛行在北方機場
  15. The ji nan destroyer is belonging to the north china sea fleet, this ship has been constructed in december, 1971. in 1987, a important renovate has been given to the ship, dismantling the cannon and deep water bombing systems on the rear deck, then adding the landing panel and hangar for 2 z - 9 dolphin type anti - submarine helicopter, the battle power is increased

    「濟南」號驅逐艦配屬北海艦隊, 「濟南」艦為051型導彈驅逐艦首艦, 1971年12月建成,在1987年對該艦作了進一步改進,拆除了後的艦炮和深水炸彈裝置,增加了可容納2架「直- 9a 」型海豚式反潛直升機的起降平臺和機庫,大大提高了作戰能力。
  16. Specification for deck - end roller fairleads

    壓輥導索環規范
  17. This ferry has a raked forecastle, single deck and double bottom. six meter long x five meter wide steel ramps one each are arranged on bow and stern for cars roll - on roll - off longitudinally

    本船具有前傾艏樓單層雙底,在艏艉均設有6米長5米寬的鋼質跳,作為汽車上落通道,汽車可以首尾縱向上落碼頭。
  18. All deck machinery and ship ' s equipment must be provided with qualified certificate, the item need to be inspected by class shall be provided with the classification society certificate

    所有機械與船舶設備必須提供質量合格證書,需經船檢門檢驗的項目需提供船級社證書。
  19. Technical requirements for safety of commencing a sea voyage of sea going transport ships - deck department

    海上運輸船舶安全開航技術要求甲板部
  20. Hoist lower the h flag, please

    甲板部工作用語
分享友人