疏浚工 的英文怎麼說

中文拼音 [shūjùngōng]
疏浚工 英文
dredger
  • : Ⅰ動詞1 (疏通) dredge (a river etc )2 (疏忽) neglect 3 (分散; 使從密變稀) disperse; scatte...
  • : 浚構詞成分。
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 疏浚 : dredge; sweep; scouring疏浚工程 dredging work
  1. This paper introduces the research on supervision technology of bathymetric survey, which has been applied successfully to the acceptance survey of dredging project

    摘要介紹水深測量監理技術方面的研究及相應技術在疏浚工程驗收測量中的成功應用。
  2. Standards for quality inspection and evaluation of dredging works

    疏浚工程質量檢驗評定標準
  3. The result fully proves that by this kind of supervision technology, not only can the survey precision be inspected accurately and supervision cost be cut down, but also can the equitableness and justness of supervision for dredging projects be guaranteed, and unwanted dispute avoided

    實踐證明,採用這種監理技術,不但能較好地檢測單位的測量精度,節省監理費用,而且還保證了疏浚工程驗收作的公正公平,避免了不必要的爭議。
  4. Due to issues of dongting lake districts flood composition, the evolution of sediment flow, the river and lake ( r & l ) distribution characteristic as well as the layout of r & l - dredging engineering, the article simulated the model of the dongting lake terrain change by using the gis technology and adopted the limited volumetric method to establish the two - dimensional hydraulics computation model of lake in order to forecast the water level, the flow capacity, the speed of flow and changes of flow field after implemented the project, which have provided the reliable theoretic basis for the decision - making and implementation of renovation for river course, canal and harbor and river course - dredging engineering

    摘要針對洞庭湖區的洪水組成、水流泥沙演變、河道湖泊水系分佈特點以及河道湖泊疏浚工程布局情況,利用gis技術模擬洞庭湖地形變化,採用有限體積法建立了湖泊二維水力學計算模型預測疏浚工程實施后的水位、流量、流速流場變化,為河道、航道港口整治、河道清淤等程決策與實施提供了可靠理論依據。
  5. Research on the application of ann in the dredge ship

    神經網路在疏浚工程船舶上的應用研究
  6. Dredging at approach channel to tai o bay

    大澳灣進口航道疏浚工
  7. The technical code of dredging engineering

    疏浚工程技術規范
  8. Discussion on ecological dredging project of taihu lake contaminated sediments

    關于太湖污染底泥生態疏浚工程的探討
  9. Reflection on the supplement ways of construction capacity of dredge project in china

    中國疏浚工程施能力補充方式的思考
  10. Technical specification for excavation volume measurement in maintenance dredging engineering for port on muddy ground

    淤泥質港口維護性疏浚工程土方計量技術規程
  11. This project will involve substantial dredging and co - ordination with other port development projects

    這項計劃涉及龐大疏浚工程,而且須與其他港口拓展程計劃相互配合。
  12. The effective using of this software is important in the realization of automation and intelligence in dredging project

    該軟體的有效利用,對實現疏浚工程自動化、智能化有重要的意義。
  13. The development for the digital simulation software of 3d terrain in dredging project can assist the dredging and manage the dredging project with high - tech fruits

    開發三維地形數字模擬軟體,就是運用先進的科技成果來輔助作業,管理疏浚工程。
  14. Improving the working character and the efficiency of trailing suction hopper dredgers will greatly increase the production, save power and bring more interests for dredging industry

    改善耙吸式挖泥船的作特性和作效率將大大提高產量、節省能源,為疏浚工程創造更多的效益。
  15. The broad application of gps technique in survey, vessel positioning, and real - time monitoring of yamen 5000 dwt seaward waterway dredging engineering is discussed

    摘要就崖門5000t級出海航道疏浚工程在測量、船舶定位、實時監控等作中gps定位技術的廣泛應用進行探討。
  16. First the author memorized the yellow river excavation history and concluded development of modern dredging science, and found that most researches of dredging are related to navigation regulation, little used to flood control especially in the yellow river with silty. based on the experiment of generalized physical model of the lower reach of the yellow river, and the study of the loaden flow mechanism and the dredging efficiency, the author get some new ideas as follows : 1

    通過對黃河的歷史以及現代疏浚工程學的發展進行了回顧和總結,認為已有的研究大多基於航道疏浚工程,對于防洪特別是在黃河這種多沙型河流上進行防洪的研究極為欠缺,本文基於黃河下遊河道概化模型試驗,對挖槽后水沙運動機理及效果等進行了研究,得到以下認識。
  17. This paper outlines the design and construction conditions of the yangtze estuary deepwater channel regulation project, describes the comparison and selection of the design schemes for the 1st & 2nd phase projects, and expounds the construction organization and administration, the core of which is dynamic management

    摘要全面介紹長江口深水航道治理程整治建築物程和疏浚工程的設計條件和施條件,並在此基礎上介紹一、二期程設計方案的優選情況,以及程實施過程中以動態管理為主要內容的施組織管理情況。
  18. It can work under a variety of dredging conditions with good benefit. because of the complexity in underwater soil, river bed condition and dredging process of a real dredging project, dredging conditions are very often unsteady

    在實際的作業過程中,由於水下土質、河床形態和作業過程的復雜性,嚴格地講,疏浚工況是非恆定的。
  19. This dissertation firstly discusses the basic structure of trailing suction hopper dredgers, then establishes the mathematical model of dynamic process of trailing suction hopper dredgers and the model of compensator of wind and wave, develops a set of real time simulation software using oop visual c + +, mfc, delphi and activex component technology, and simulates the different dynamic characters for different working situations

    本文從討論耙吸式挖泥船基本結構和基本作過程著手,建立了耙吸式挖泥船系統的數學模型,採用面向對象的visualc + + 、 mfc圖形函數、 delphi和activex控制項技術,開發了一套實時模擬軟體,模擬了不同疏浚工況下的動態特性。
  20. In practice, because of the differences in soil property and irregular riverbed, dredging processes are usually complicated. in addition, dredger operators are required to understand dredging processes and to be familiar with the basic characteristics of the dredging equipment through specific training in order to control the dredging equipment correctly

    生產實踐中,水下土質的差異及河床形態的多變,使得疏浚工況和作業比較復雜,再加上大型設備十分昂貴,從而客觀上要求船員事先應通過崗位培訓,了解過程,熟悉設備的基本特性,為正確操控設備,實現安全高效,提供技術保證。
分享友人