真空模板 的英文怎麼說

中文拼音 [zhēnkōngbǎn]
真空模板 英文
vacuum form
  • : Ⅰ形容詞(真實) true; genuine; real Ⅱ副詞1 (的確; 實在) really; truly; indeed 2 (清楚確實) cl...
  • : 空Ⅰ形容詞(不包含什麼; 裏面沒有東西或沒有內容; 不切實際的) empty; hollow; void Ⅱ名詞1 (天空) s...
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • 真空 : [物理學] vacuum; empty space; vacuo
  • 模板 : [土] formwork; mould; shuttering; follow board; form board; match board; match plate; mother plat...
  1. Main products include suited offset point imprinter bearing sets comber gear for weaving industry metal mould and gear vacuum gear synchro gear worm worm wheel. acme whorl fitting and all kinds of fittings with various gears

    主要產品:印刷行業各種膠印機和印后設備輪及軸承套,紡織行業精梳機輪,金屬材壓延具和輪,泵輪同步帶輪蝸桿蝸輪副acme螺紋副各種直斜錐及各種盤類和軸類件等機械加工件。
  2. Recently the company first produced drum - type vacuum washer with scrolled filter sheet in large sizes of 50m2, 70 m2, and 100m2, and the 35 m2 precoat vacuum filter in the country, especially the latter one, which has achieved better effect through the operation in the alkali recovery project of shandong chenming paper industry, who is the largest in scale, the best in benefits and the leading enterprise of national paper industry

    新近開發的50m2 70 m2 100m2大規格大流通平面閥波汶濾鼓式洗漿機和35 m2預掛式過濾機為國內首創,特別是預掛式過濾機,在全國造紙業頭企業生產規最大,效益最好的山東晨鳴紙業堿回收項目上運行,收到了較好效果,受到行業的好評。
  3. The second phase of this project, completed in 2005, was on a larger scale with 21 solar - powered water heaters installed on the roof of the university sports centre. the solar heating duct employed is different from the older type of solar - panels and is much more efficient. on sunny days the temperature of the water can reach 90 c ; following temperature adjustment, the water is provided to the sports centre and for showers in the kwok sports building

    第二期工程規更大,有21套太陽能熱水器安裝在大學體育中心天臺,熱導管式太陽能熱水器有別于以往平式太陽能熱水器,大大提高系統效能,在日照時份水溫可達攝氏90度,熱水經調溫后供體育中心及汾陽樓浴室淋浴之用。
  4. The operation result showed that with a solar collector of 20 square - meter, the cooling capacity of the solar ejector refrigeration system could meet the demand of a living house of 60 to 70 square - meter ( when the booster was present ) or of 20 to 30 square - meter ( when the booster was absent ) from 10am to 4 pm

    擬運行結果表明,採用20m ~ 2平管集熱器,太陽能噴射式製冷系統從上午10點運行到下午4點期間,可以滿足供60 ? 70m ~ 2 (採用增壓器)或者20 ? 30m ~ 2 (不採用增壓器)住宅間製冷調要求。
  5. Trough comparing the analysis results of two kinds of calculation model, drawing the following conclusion : ( 1 ) this structure - design satisfies the standard ; ( 2 ) in analyzing the complicated high - rise building with transfer - floor, it is very necessary to adopt at least two three - dimension - space analysis procedures with different mechanic model and use the response - spectrum analysis and time - history analysis to analyze the structure earthquake response ; ( 3 ) the calculation model with elastic slab is better than the other with being infinitely rigid in the internal slab and zero in the external slab, which reflects the real load - function situation of the structure

    通過比較兩種分析軟體的計算結果,得出以下結論: ( 1 )本結構設計滿足規范要求。 ( 2 )比較satwe和sap2000分析結果可知,對于復雜的帶轉換層的超高層建築結構應採用至少兩個不同力學型的三維間分析軟體進行整體計算以及採用振型分解反應譜法和時程分析法進行地震反應分析是必要的。 ( 3 )在sap2000分析中,將樓擬成彈性,與satwe分析中的樓平面內無限剛平面外剛度為零的擬方式相比,這種擬方式能更實的反應結構的實際受力情況。
分享友人