石砌的墻 的英文怎麼說

中文拼音 [dànde]
石砌的墻 英文
stone′wall
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • : 砌Ⅰ動詞(用磚、石等壘) build by laying bricks or stones Ⅱ名詞(臺階) step
  • : 4次方是 The fourth power of 2 is direction
  • : 名詞(磚、石等築成的屏障或外圍) wall
  • 石砌 : barnacle石砌墓 cist; 石砌排水溝 stone drain
  1. The gabled brick, tile, and freestone houses had almost dried off for the season their integument of lichen, the streams in the meadows were low, and in the sloping high street, from the west gateway to the medieval cross, and from the medieval cross to the bridge, that leisurely dusting and sweeping was in progress which usually ushers in an old - fashioned market - day

    那些帶有用磚和蓋有屋瓦頭房子,外面一層苔蘚已經因為乾燥季節差不多曬干脫落了草場上溝渠里水變淺了,在那條斜坡大街上,從西大門到中古十字路,從中古十字路到大橋,有人正在不慌不忙地清掃大街,通常這都是為了迎接舊式集市日子。
  2. The third mosque is the hk 26 - million kowloon mosque and islamic centre and its located at 105 nathan road in tsim sha tsui, kowloon. this three - storey building, with a handsome dome and four minarets, is highlighted by marble grille work and decorative arches

    樓高三層建築物,設有堂皇圓頂及四個尖塔,由大理而成壁及雕花拱門,充滿莊嚴不凡氣派,可容納會眾約2 , 000人。
  3. This paper puts forward a method of fast, handy, no - destructive and effective testing which can be used to test the strength and geometrical dimension of subgrade abamurus using the method of earthquake wave velocity and gpr ( ground penetrating radar ). this method can be used to definite the dimension and strength of abamurus by determining some physical parameters ( such as elastic wave velocity and electromagnetic wave velocity etc, ) and by the correlation of these physical parameters with mortar flag stones

    本論文提出使用地震波速法和地質雷達法檢測路基擋強度和幾何尺寸,是一種快速、簡便、無損、有效檢測方法。此方法通過測定某些適當物理量(如:彈性波速度、電磁波速度等) ,並通過這些物理量與漿相關性,確定尺寸、強度等性能。
  4. Paving granite block facing of rw003 near lung tseng tau

    鋪設鄰近於井頭擋土編號003花崗
  5. The building has a majestic appearance with imposing pillars of the facade and other features in the greek - revival style. the massive retaining walls were constructed with granite blocks

    整座建築物十分雄偉,正面採用希臘古典式建築,建有宏偉柱,護土則以花崗巖築而成。
  6. It is a three - hall building and the second hall is the place for worshipping the clan s ancestors. its wall and door are decorated with rare rocks, and the crossbeams and brackets are finely carved

    祖祠門用珍貴紅粉而成,橫梁和斗拱飾以精緻雕刻,還有灣制瓷鰲和獅子裝飾,甚富傳統色彩。
  7. There are elegantly built white kiosks, curved bridges and ponds inside the park, and the rear wall of the park is made with stone piling

    園內建有造型優美白色涼亭曲橋和池塘,公園后並以巨而成。
  8. In spite of the un - russian character of the country and the environment the fruit gardens, the stone walls, the tiled roofs, the mountains in the distance, the foreign peasants, who looked with curiosity at the russian soldiers, the regiment looked exactly as every russian regiment always looks when it is getting ready for inspection anywhere in the heart of russia

    盡管地形和周圍環境果園瓦房蓋遠處望得見山巒與俄羅斯迥然不同,盡管非俄羅斯民眾懷著好奇心觀望著士兵,但是,這個兵團外貌,卻和俄羅斯中部任何地區任何一個準備接受檢閱俄國兵一模一樣。
  9. This paper expounds the research on pumice and its concrete, and the testing result indicates the pumice after being properly machined can be used to make lwac and hollow block

    試驗研究結果表明,張家口地區所開採經過適當破碎加工、優化分選和顆粒搭配后可配製性能優良輕骨料混凝土,並可用於製作性能可靠建築體用輕混凝土空心塊。
  10. 3. in applications, the structure of stabilizing piles with pre - stressed anchor cables can be associated with retaining wall, combined bolting and shotcrete, precast concrete lagging ( plain, troughlike, archlike shapes ), and so on, which enlarge the application areas of this structure

    3 、在實際應用中,預應力錨索抗滑樁可與、噴錨支護、預制擋板(平板、槽形板、拱形板等)聯合作用,形成多種形式組合結構,從而可擴大這種結構型式應用范圍。
  11. Retaining wall is a construction form of the widespread adoption in engineering field, although appeared the new form of the wall in recent years with the new way of doing, the gravity wall built with stone is still the main form, and therefore the study on optimization design of the gravity wall built with stone has very important meaning

    擋土是工程界普遍採用結構形式,雖然近年來出現了不少擋土新形式和新做法,但重力式擋土仍然是工程中擋土主要形式,因此對重力式擋土進行優化設計研究具有十分重要意義。
  12. We provide facade consulting services for all types of exterior wall systems, including ; custom curtain wall, glass wall, skylights, exterior stonework, masonry and precast concrete

    我們提供所有形式外面體系統咨詢服務,包括設計幕,玻璃,天窗,頭和塊外,以及預制混凝土板外
  13. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程科研項目,綜述三峽工程開工以來主要科研成果及工程應用情況,包括:一期土圍堰基礎處理與施工技術;大江截流上下游土圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯結構與支護研究;特大型水輪發電機組科學研究。
  14. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程科研項目,綜述三峽工程開工以來主要科研成果及工程應用情況,包括:一期土圍堰基礎處理與施工技術;大江截流上下游土圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯結構與支護研究;特大型水輪發電機組科學研究。
  15. Next was an experimental study on modification of stone ballast concrete small hollow block. the influence of polypropylene fiber, expansion agent and both of them on permeability - resistance and both moisture expansion and dry shrinkage of the block were systematically tested. the testing results and theoretical analysis slowed that they all can improve its properties, among which polypropylene fiber can most effectively restrain it ’ s moisture expansion and drying shrinkage ; however, the block doubly blended with polypropylene fiber and expansion agent will be likely to most beneficially improve crack - resistance of wall filled with the block

    試驗結果和理論分析表明,單摻聚丙烯纖維、單摻膨脹劑和雙摻聚丙烯纖維與膨脹劑均能改善混凝土空心性能,其中,聚丙烯纖維更有利於限制單個濕漲干縮,單摻聚丙烯纖維空心塊濕脹干縮波動性最小;雙摻聚丙烯纖維與膨脹劑對限制塊濕脹干縮效果不理想,但雙摻塊將更有利增強于塊填充整體抗裂性。
  16. After all, there came an experimental study on modification of wall filled with stone ballast block

    最後進行塊填充(模擬)改性試驗研究。
  17. Spot investigating results revealed, subjective factors causing crack in wall filled with stone ballast block can be eliminated by intensifying instruction, strengthening management and strict overseeing

    現場調研顯示,引起塊填充裂縫主觀因素,可以通過加強指導,強化管理,嚴格監督予以消除。
  18. The wall was built of rough stones, among which, to give strength to the structure, blocks of hewn stone were at intervals imbedded

    壁是用碎,為了使它更堅固,還用粗糙不平塊嵌住其間空隙里。
  19. By combining the design of cast asphalt concrete core earth - rock dam of nierji hydroelectric projects, an optimize study on the structural types and construction technology of cast asphalt concrete core are carried out in the article. the main contents of the study are summed up as follows : at present, the main and auxiliary core structures are widely adopted in the design of the cast asphalt concrete core earth - rock dam in the state, i. e. the main core to be asphalt concrete and auxiliary core of asphalt mortar masonry

    本文結合尼爾基水利樞紐工程澆築式瀝青混凝土心設計,對澆築式瀝青混凝土心結構型式和施工技術進行優化研究,主要研究內容歸納如下:目前我國在澆築式瀝青混凝土心壩設計中,心型式多採用主、副結構,即主為瀝青混凝土,副為瀝青砂漿體。
  20. On all sides he saw places laid waste, with stoves and pipes left standing in them, and now and then the charred walls of a stone house

    隨處可以看見只剩爐灶和煙囪瓦礫場,偶爾有些地方剩下房屋燒焦了壁。
分享友人