石砌護坡 的英文怎麼說

中文拼音 [dàn]
石砌護坡 英文
stone pitching
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • : 砌Ⅰ動詞(用磚、石等壘) build by laying bricks or stones Ⅱ名詞(臺階) step
  • : 動詞1. (保護; 保衛) protect; guard; shield 2. (袒護;包庇) be partial to; shield from censure
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • 石砌 : barnacle石砌墓 cist; 石砌排水溝 stone drain
  1. Application of the dam with laid dry block stone casing

    棘洪灘圍壩干塌陷原因分析及處理
  2. Pitched slope breakwater

    防波堤
  3. Application of dry stone pitching revetment with pointing joint by sluicing sand in levee

    淺談干沖砂勾縫在堤防工程中的應用
  4. This machine mainly adapts to produce highway curbstone, slope precast block, water slope precast block and all kinds of concrete bricks including colored pavement bricks grass - planting brick

    該機主要用於生產高速公路路緣預制塊,水利提預制塊,和各種規格彩色人行道磚植草磚等混凝土塊。
  5. Analysis of the surrounding dam dry - laid stone slope revetment damage of a yellow river diversion reservoir at early period of water storing

    引黃平原水庫蓄水初期圍壩干破壞調查與原因分析
  6. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土圍堰基礎處理與施工技術;大江截流上下游土圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊穩定、混凝土襯墻的結構與支研究;特大型水輪發電機組的科學研究。
  7. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土圍堰基礎處理與施工技術;大江截流上下游土圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊穩定、混凝土襯墻的結構與支研究;特大型水輪發電機組的科學研究。
  8. Hy series blocks shaped aircraft production lines are introducing advanced foreign technology and the integration of old and new customers valuable advice from improved design of the production equipment is high quality, durability strong, efficient production, applicable to the production of specifications hollow blocks, color sidewalks slabs, sidewalks fenmeihui color brick, chain blocks, bowling slabs, bricks central shue, luyandan

    Hy系列塊成型機生產線是引進國外先進技術及結合廣大新老客戶寶貴意見改良設計而成,該設備具有生產質量高、耐用性強、生產效率高,適用於生產各種規格空心塊、彩色人行道磚、粉煤灰彩色人行道磚、連鎖塊、草地磚、環樹磚、植草磚、路沿等。
  9. By adopting jet grouting, ground water was controlled effectively, and thus further excavation and implementation of the scheme of grouted rubble revetment were ensured

    採用高壓旋噴注裝進行止水防滲處理后,地下水得到了有效的控制,保證了基坑進一步開挖和裝方案的順利施工。
分享友人