砌石結構 的英文怎麼說

中文拼音 [dànjiēgòu]
砌石結構 英文
masonry structure
  • : 砌Ⅰ動詞(用磚、石等壘) build by laying bricks or stones Ⅱ名詞(臺階) step
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • 結構 : 1 (各組成部分的搭配形式) structure; composition; construction; formation; constitution; fabric;...
  1. The complex consists of circular defensive towers in the form of truncated cones built of dressed stone, with corbel - vaulted internal chambers

    這一綜合包括用修琢的頭堆而成的錐狀環型防禦塔,以及在塔內用梁托支撐成的套間。
  2. This circular arrangement of unhewn stones appears to be laid out deliberately to form an oval - shaped enclosure, measuring 2. 7 m by 1. 7m, the careful and orderly layout of the stones points to human agency

    這圈未經琢磨的塊,似是刻意堆疊,形成一組長2 . 7米、寬1 . 7米的橢圓形塊排列有序,正好說明人工築的痕跡。
  3. The test obsvervation include air temperature, ground temperature, foundation moisture, freeze depth, freeze capicity, freeze residual capicity, groundwater table and shape transform of canal lining, etc. throught systemic observation, analysis of impact about each factor on fundation freeze capicity, evaluate effect on anti freeze of various canal lining, comparison on technology and ecnomic of different method, a kind of main canal lining format is been recommended to engineering practice with siutable to ningxia local feature, fufilling the need of main canal safey i application, economic and practical, that is using polystyrene plate laying under concrete slate and grit taking replace of filling layer and optimizing design

    試驗觀測內容包括氣溫、地溫、基土含水量、凍深、凍脹量、凍脹剩餘量、地下水位和體外觀變化等項目。通過系統的觀測,分析各因素對基土凍脹量的影響,評價各種襯型式的防凍西安理工大學工程碩士專業學位論文脹效果,並進行技術和經濟綜合分析比較,推薦出了適合我區特點、滿足乾渠安全運行、經濟實用、防凍脹效果好的乾渠防滲襯型式,即混凝土板下鋪設聚苯乙烯板和砂礫換填層型式,加以優化設計,用於工程實踐。
  4. The company insists on absorbing foreign advanced technology and combining domestfic research and cooperation with project organization as well as technical practice and experiences for years, and joins efforts in developing new generation advance energy saving equipment serial products

    本公司堅持吸取國外先進技術,合國內科研和設計機合作及多年技術實踐、經驗,共同開展新一代先進、節能設備:有全自動水泥塊機、免燒磚機、液壓花磚機,路沿成型機、水泥制磚機等系列產品。
  5. Rc - masonry combination arch bridge makes rc arch ribs as former spanning structure and falsework of upper masonry ' s construction. finally, reinforced concrete and masonry together form arch ring

    它提出了以rc拱肋作為先期的跨越和後期高強築的施工支架,最終由體和rc拱肋共同形成主拱圈的思。
  6. Sentiment real - crystal palace stone structure, dian beams and columns, fang, windows, stone, decorated kiss and so on, all with engraved stone into components, then assembled joints mao formed

    天乙真慶宮為仿木,殿梁、柱、枋、門窗、斗拱、吻飾等等,全部是用青雕鑿成件,然後榫卯拼裝而成。
  7. Blasting demolition of the old bridge ' s foundation with reinforced concrete - slurry complex structure

    爆破拆除鋼筋混凝土與漿復合老橋基礎
  8. Pavements constructed with clay, natural stone or concrete pavers - guide for the structural design of lightly trafficked pavements of precast concrete flags and natural stone flags

    用粘土天然或混凝土鋪築材料進行的路面.用預制混凝土塊或天然塊鋪的輕型通行路面的設計指南
  9. 3. in applications, the structure of stabilizing piles with pre - stressed anchor cables can be associated with retaining wall, combined bolting and shotcrete, precast concrete lagging ( plain, troughlike, archlike shapes ), and so on, which enlarge the application areas of this structure

    3 、在實際應用中,預應力錨索抗滑樁可與擋墻、噴錨支護、預制擋板(平板、槽形板、拱形板等)聯合作用,形成多種形式的組合,從而可擴大這種型式的應用范圍。
  10. Retaining wall is a construction form of the widespread adoption in engineering field, although appeared the new form of the wall in recent years with the new way of doing, the gravity wall built with stone is still the main form, and therefore the study on optimization design of the gravity wall built with stone has very important meaning

    擋土墻是工程界普遍採用的形式,雖然近年來出現了不少擋土墻的新形式和新做法,但重力式擋土墻仍然是工程中擋土墻的主要形式,因此對重力式擋土墻進行優化設計研究具有十分重要的意義。
  11. Stone masonry structure

    41
  12. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土圍堰基礎處理與施工技術;大江截流上下游土圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯墻的與支護研究;特大型水輪發電機組的科學研究。
  13. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土圍堰基礎處理與施工技術;大江截流上下游土圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯墻的與支護研究;特大型水輪發電機組的科學研究。
  14. Surface, the easliy wear and tear parts use grinding - resistant material, extruding part use variable cylinder diamethe extruder with compact structuures, transmission gear with hard gear ter detachable pitch, great extruding p0ressure, high vacuum degree, low loading capacity ( electricity - saving more than 25 % than the same product ). it reaches advanced domestic level andcan replace imported items. it is suitable to produce hollow brick with high hole ratio, coal waste rock hollow bricks, shale hollow bricks, prower coal ash hollow - bricks. the extruder won the scienttific and technological progress pride of the lst building material scientific and techniques achievement exhibition in jiangsu province and the golden prize of the mational brick and tile energy - saving lxln achievement

    該機緊湊、傳動齒輪均系硬齒面,易損件採用耐磨材料、擠出部分採用變缸徑、變螺距、擠出壓力大、真空度高,裝機容量低(比同類產品節電25 % ) ,性能優于進口同類設備,適用生產高孔洞率空心塊、煤矸、頁巖、精煤灰空心磚及各類高摻入量粉煤灰磚和低塑性原料磚,該機在江蘇省首屆建材科技成果展覽會科技進步獎; 94全國磚瓦節能四新成果展覽會金獎,西安國際博覽會金獎。
  15. By combining the design of cast asphalt concrete core earth - rock dam of nierji hydroelectric projects, an optimize study on the structural types and construction technology of cast asphalt concrete core are carried out in the article. the main contents of the study are summed up as follows : at present, the main and auxiliary core structures are widely adopted in the design of the cast asphalt concrete core earth - rock dam in the state, i. e. the main core to be asphalt concrete and auxiliary core of asphalt mortar masonry

    本文合尼爾基水利樞紐工程的澆築式瀝青混凝土心墻土壩的設計,對澆築式瀝青混凝土心墻的型式和施工技術進行優化研究,主要研究內容歸納如下:目前我國在澆築式瀝青混凝土心墻土壩設計中,心墻的型式多採用主、副墻,即主墻為瀝青混凝土,副墻為瀝青砂漿體。
  16. Eurocode 6. design of masonry structures. design, selection of materials and execution of masonry together with united kingdom national application document

    歐洲法規6 .磚件的設計.磚材料的設計選擇和施工
  17. Methods of test for masonry units - determination of real and bulk density and of total and open porosity for natural stone masonry units

    體的試驗方法.天然頭磚體的實際密度和體積密度及總孔隙度和開放孔隙度的測定
分享友人