破碎巖石 的英文怎麼說

中文拼音 [suìyándàn]
破碎巖石 英文
bad rock
  • : Ⅰ動詞1 (完整的東西受到損傷) be broken; be damaged 2 (使損壞) break; break down; damage 3 (使...
  • : 動詞[書面語] (觸; 撞) strike; bump
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • 破碎 : 1. (破成碎塊的; 零碎的) tattered; broken 2. (使破成碎塊) smash [break] sth. to pieces; crush
  1. ( 2 ) based on indoor test, two typical soft rock of brecciated mudstone and siltstone in luohu jiancheng district is carried systemically though interior rheological testing ; moreover combining with preceding studying results of rock rheological constitutive model, rheological numerical constitutive model suited to rock mass mechanics characteristics and stratum structure of luohu fracture zone, and numerical parameters of the model are processed with studying of curve fitting

    ( 2 )立足於室內試驗,對羅湖建成區兩種典型的軟弱?含角礫泥和粉砂進行系統的室內流變試驗研究,又結合前人對流變本構模型的研究成果,分析並確定了適合羅湖體力學特性及地層構造特徵的流變計算本構模型,並對該模型的計算參數進行了曲線擬合研究。
  2. The cataclastic rocks appeared in the fault zone include structural lenticles, fault breccias, protocataclasite and cataclasite. the microscopical cataclastic deformation mechanisms involved are microcracking, frictional sliding and pressure - solution, but there might have had ductile deformation relating to dislocation sliding in feldspar and quartz of the plutons

    斷裂帶內系列構造主要是裂化(包括構造透鏡體和構造角礫) 、初,顯微變形機制主要有裂作用、摩擦滑動和壓溶作用。
  3. The author suggests that the three lithosphere - scale faults, lancangjiang fault, jinshanjiang - ailaoshan fault and axis fault in the middle of the basin, are the main geological structures that control the formation of basin, magmatism and metallogenic congregate district. the anticline structure with an axis of triassic strata and the related fault system within the basin, and gonglang arch - shaped folding structure in the south of the basin are the geological structure controlling the formation of ore fields. junctions of two or more faults with different orientation, interlayer cataclastic structural zone and oxidation - reduction ( redox ) boundary were the favorable position for the formation of ore bodies

    認為瀾滄江斷裂、金沙江-哀牢山斷裂及盆地中軸斷裂這三條圈斷裂是主要的控盆-控漿)構造及礦集區尺度的控礦構造;盆地中以三疊系為軸的背斜構造及相關的斷裂系統、盆地西南緣公郎弧形構造等是礦田尺度的控礦構造;多組斷裂的交叉、層間帶及地層柱中的氧化還原界面是形成礦體的有利部位。
  4. Chunks of the overlying rock may break off and become a part of a sill.

    上復塊可能裂並成為床的一部分。
  5. B87c breaker is a pneumatic instrument manufactured with the mature technology of america gardener denver corporation. it is more powerful in breaking ferroconcrete, rocks and asphalt. boasting greater efficiency and durability, it suits the requirements of breaking outsized, super - thick and hard objects. it is ideal machinery for the substructural construction of mines, bridges, roads and civil infrastructure

    B87c機採用美國迦納德?丹佛氣動集團公司成熟技術,是以壓縮空氣為動力的工具,能高效完成鋼筋混凝土、、瀝青等工作,具有馬力更大、效率更高、壽命更長等特點,特別適宜對特大、特厚、特堅硬物體的作業,是礦山、橋梁、道路、市政建設等基礎工程施工的理想工具。
  6. These are useful in hard rock mining where high brisance, high shattering effects, are desired.

    這種炸藥,對需要高威力、高效應的堅硬礦,是有用的。
  7. Descending into the grotto, he lifted the stone, filled his pockets with gems, put the box together as well and securely as he could, sprinkled fresh sand over the spot from which it had been taken, and then carefully trod down the earth to give it everywhere a uniform appearance ; then, quitting the grotto, he replaced the stone, heaping on it broken masses of rocks and rough fragments of crumbling granite, filling the interstices with earth, into which he deftly inserted rapidly growing plants, such as the wild myrtle and flowering thorn, then carefully watering these new plantations, he scrupulously effaced every trace of footsteps, leaving the approach to the cavern as savage - looking and untrodden as he had found it

    然後,走出洞來,把那塊頭蓋回原處,在上面堆了些和大塊的花崗片,又用泥土填滿縫,移了幾棵香桃木和荊棘花種植在這些縫里,並給這些新移種的植物澆些水,使它們看起來象是很久以來就生長在這兒的一樣,然後擦去四周的腳印,焦急地等待他的同伴回來。他並不想整天地去望著那些黃金和鉆,或留在基督山島上,象一條似的守護著那些沉在地下的寶藏。
  8. The major diameter filling pile drilling machine of qj250 - 1 type applies to major diameter bridge pier hole of various geologic conditions such as ravelly ground, clay loam layer, sandy gravel, breaking layer and lithosphere as well as other various major diameter pore forming construction

    1型大直徑灌注樁鉆孔機適用於鬆散地層、粘泥層、砂礫層、層和層等多種地質條件的大直徑橋樁孔,以及其它各種大直徑成孔施工。
  9. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆壩壩基處理和防滲的原則及設計要點.趾板基礎和堆體各區砂礫基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基外,其餘部分均予以保留.斷層帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆壩的設計和研究提供參考與借鑒
  10. In numerical simulation, the elastic zone is only considered and the effect of blasting waves on the rock medium, after attenuating through crushing zone and ruptured zone, becomes an input load

    數值模擬僅考慮彈性區域,爆炸波對介質的作用經粉區、裂區衰減后成為輸入荷載。
  11. And with the introduction of the modulus of elasticity from budiansky method, the general damage model of rock blasting is established in the paper. by use of the ultrasonic wave, rock damage and fracture mechanism and the fragmentation process during blasting are studied, and the theory presented in the paper has been proven

    運用超聲波等手段對損傷斷裂機理和壞過程進行了試驗研究,分析了不同爆條件下內部微裂紋的擴展規律、損傷演化和規律,驗證了本文理論部分的正確性。
  12. Sdy series cone crusher absorbed the american advanced crushing technology, it tops the leading level in the home, and is widely used in the industry of the mentally, the industry of building, the industry of water and electricity, etc. suitable to crush hard or secondary hard mineral ore and rock

    Sdy系列圓錐機是經過吸收美國先進技術研製出的具有國內領先水平的圓錐機,廣泛應用於冶金、建築、水電、交通、化工、建材工業中,適合堅硬、中等硬度以上的各種礦
  13. Experiments on breaking rock with high - pressure cavitating water jets

    高壓空化水射流破碎巖石的試驗分析
  14. Large pieces of rock are only suitable for use as road surfaces in the form of fine gravel, run - of - mine coal needs to undergo a size reduction prior to further treatment, and lumps of ore need to be crushed to small pieces because sintering plants require feed material with a high degree of fineness

    公司的目標是生產機和洗礦機。只有砂礫狀的塊才適合於路面,原煤必須首先要被擊才能被加以利用,礦必須被搗,這是因為燒結設備只能處理細微物料。
  15. The structure of tri - cone rock bit is complicated. as the cutting structure touch the stratum directly, it affects the process of breaking rock and the performance of tri - cone rock bit

    三牙輪鉆頭結構復雜,其中齒面結構直接與地層接觸,對于過程和鉆頭工作性能的影響最大。
  16. The supporting mechanism of pre - stress anchor is given in following sentences in this paragraph : make full use of sectional stability, put - up steel - net shot concrete to the stratified earth as the trench is being excavated, and by this means, the little liding of soil layers and small broken slumps of rock slopes can be avoided

    預應力錨板的支護機理:充分利用土層自身或預處理的局部的穩定性,隨基坑開挖分層掛鋼筋網噴射砼,以避免土層幫片及邊坡小的節理滑塌,並把土壓力傳給錨板,由錨桿集中受力,通過錨桿的錨固力平衡土壓力。
  17. Because the ore has been mined for long time, the nature geological environment has been getting worse and worse, such as the baldness of mountain body, the rock is weathered to pieces, a lot of loose material distributing along the gully and its banks, the disaster of debris flow is seriowsly, and the production of the mine is constrained by debris flow disaster ; for example, a debris flow broke out on august 1999 and resulted in catastrophic hazards to the jingtieshan iron mine, resulted in a huge economic losses of 50 million yuan

    鏡鐵山礦是酒鋼最主要的鐵礦生產基地,礦區山高溝深,地質構造復雜,自然地質環境較差,在長期人為開采活動的影響下,地質自然環境進一步惡化,山體裸露,,大量鬆散固體物質堆積在溝道及溝道兩側,泥流災害十分嚴重,嚴重製約了礦山的生產與發展。 1999年8月礦區黑溝南溝暴發生了嚴重的泥流災害,致使礦山停產10多天,造成5000多萬元的經濟損失。
  18. A testing method for determining the gas permeability of overbroken rocks

    破碎巖石氣體滲透性的試驗測定方法
  19. The geologic condition of side slope is complex. it is composed of soil and intense weathering rock on the surface and slightly weathering rock under the surface. further more, it has many faults, fissuring and weak intercalations

    其水電站尾水渠高邊坡所處區域地質條件復雜,邊坡表面由幾米至十幾米厚的坡積土和強風化破碎巖石組成,下部是弱風化和微風化組成,且斷層、節理和軟弱夾層分佈廣泛。
  20. The assisting mechanism of hammer in dredge haul is to accumulate energy with wire pull, draw inner pole firstly, release by pin framework, acceleratc core piece, strike hammer shell, produce great instantaneous wallop, drag dredge to break op stone immediately, restore with reposition spring, and work again finally

    該機構在拖網取樣時利用鋼纜拉力蓄積能量拉動內部拉桿,並通過銷軸機構釋放能量加速沖擊芯塊,撞擊殼體產生巨大的瞬時沖擊力,拽動拖網破碎巖石,然後使用復位彈簧使機構復位,重新工作。
分享友人