礦山基本建設 的英文怎麼說

中文拼音 [kuàngshānběnjiànshè]
礦山基本建設 英文
mine construction
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  • : 名詞1 (地面形成的高聳的部分) hill; mountain 2 (形狀像山的東西) anything resembling a mountain...
  • : i 名詞1 (草木的莖或根)stem or root of plants 2 (事物的根源)foundation; origin; basis 3 (本錢...
  • : Ⅰ動詞1 (建築) build; construct; erect 2 (建立; 設立; 成立) establish; set up; found 3 (提出;...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • 礦山 : mine; hacienda; diggings; bal; groove礦山安全 mine safety; 礦山測量 [采礦工程] mining survey; lat...
  1. After many years of civil construction and facility renovation, shmp become a modern large enterprise with complete management organization, strong technical ability, sufficient manufacturing facility, advanced procedure, perfect testing method to finish design and manufacturing of heavy equipment for power industries, metallurgy and rolling industries, forging and pressing industries, minery and cement industries, water conservancy, and also high quality heavy casting and forging

    我公司經過多年的和技術改造,現已成為一個組織管理機構健全,技術力量雄厚,加工備齊全,工藝手段先進,測試方法完善,可以獨立計、製造大型電站、冶煉、軋鋼、鍛壓、、水泥備和大型優質鑄鍛件的現代化大型企業。
  2. This paper unite surveys works in dong gua shan mines construction under 1 km place researching four key technology in mine s survey, they are construction survey technology in km deep mine, km deep mine s connected survey technology, km deep level survey technology of longer distances link up in many heads opening and basic control survey technology, km mine s extension when the production must go on accurate fixed position survey technology, and all obtained success

    文結合在千米以下冬瓜時期的測量工作,研究了深部測量四個方面的關鍵技術,即千米深井施工測量技術、千米深井聯系測量技術、千米深井中段多頭開拓長距離貫通和控制測量技術、千米深井不停產延深精密定位測量技術,並取得了成功的效果。
  3. Since i joined abc company, i have led and participated in more than 20 mining engineering and consulting projects, from project proposal, pre - feasibility study, feasibility study, conceptual design, preliminary design to detailed design

    自參加工作以來,主持和參與的計咨詢項目二十多個項,內容包括項目議書、預可行性研究、可行性研究、方案計、計、詳細計等等。
  4. First introduces hardware platform of mine monitoring system that adopt embedded pcm - 3350 to be as main controller, big - capability memorizer cf card as memories, 10. 4 inch lcd liquid crystal screen as display, pcm - 3612 as communication extend cell ; rs232 and keyboard as i / o interface to realize data dispose, storage and transport function, and so on. then introduces some basic concept and core character about embedded operating system windows ce. at the same time, the paper has a detailed introduction about platform - configured tool platform builder of mbedded operating system windows ce and a detailed narration abut the whole process of configuring the embedded operating system base on yanhua pcm - 3350, then the paper depletes the characteristic function and system framework of embedded configuration software mcgs generally and introduces the design process about configuration software of mine monitoring - control system ; at last, the paper introduces main function of rk512 communication protocol that can ensure reliable communication with controller plc of bottom machine

    首先介紹了硬體平臺的搭:採用嵌入式pcm - 3350作為主控制器;大容量的存儲器cf卡作為存儲備;採用10 . 4寸lcd液晶屏作為顯示備; pcm - 3612作為通信擴展單元;用rs232和鍵盤作為i o介面來實現數據的處理、存儲和傳輸等功能;然後又介紹了嵌入式操作系統windowsce的一些概念、核心特性,同時對嵌入式操作系統windowsce的平臺定製工具platformbuilder做了一些介紹並詳細敘述了使用platformbuilder定製於研華pcm - 3350的windowsce操作系統的過程;接著概括敘述了可運行在windowsce上的嵌入版組態軟體mcgs的特點、功能、體系結構並詳細介紹了檢測系統的組態軟體計過程;最後介紹了能夠與下位控制器plc可靠通訊的rk512通訊協議的主要函數。
  5. At present the simple roads for accessing mine have been built basically and a part of exploration equipment has been carried to the mountain for detailed exploration

    目前,簡易進道路已完成,部分勘探備已運上準備開展詳查工作。
  6. Based on the investingation and some study methods of the stability on the goaf, the paper has the goaf of the first and second tunnels of wu long channel on coal mine railway leased line in da ning of shanxi province as an example, according to the engineering geological invesitigation and maping in the earth ' s surface, also combining the visit on the relate people, firstly has a geological judge on the space extend of the mostly ledges which have been picked ; then adopts the instrument of engineering surveying and checking ( for short sws ) which is relatively advanced inside and outside to test by surface wave the rockmass and solid near the middle line of the tunnel ( total forty meter ), and has a relatively exact judgment on the place that the goaf impossible reveal ; lastly passing the validate by drilling, it make clear that the results which tested by sws is reasonable and believable, based on finding out clearly the space extend of the goaf, the author makes a relatively systemic study on the stability of wall rock around the goaf

    因此,查明采空區的具體位置,在此礎上對場地進行工程適宜性評價,對整個工程具有重要的指導意義。論文在總結前人對地下采空區勘察及有關穩定性研究方法的礎上,以西大寧煤鐵路專用線五龍溝1 ~ # 、 2 ~ #隧道采空區為研究實例,在詳細的地表工程地質調查和測繪的礎上,結合通過對采空區有關人員的探訪,首先對主要開采層的空間展布進行地質判斷;然後採用國內外較為先進的工程勘探與檢測儀(簡稱「面波儀」 ) ,對1 ~ # 、 2 ~ #隧道中線兩側一定范圍內(共40米)進行了面波測試,對采空區的可能出露部位進行了較為準確的判斷;最後通過鉆探加以驗證,表明面波儀的測試結果是較為合理可信的。
  7. Based on the valuable experience of the predecessors and the present situation existing in the area of 3d modeling, this paper makes a research of the technical difficulties in mining designing - - the construction of mineral deposit model and the extraction of slices in any orientation, by making comprehensive use of many mathematical theories and methods, database and graphics processing technique and puts forward the theory of 3d modeling based on discrete algorithm

    鑒於此,文借鑒系統工程的思想,結合前人研究工作中的寶貴經驗,針對目前三維模領域的現狀以及存在的一些問題,綜合運用多種數學理論與方法、數據庫與圖形圖像處理技術,對生產計中的技術難點? ?床三維模型的立與任意剖面圖的剖切進行了研究與嘗試,提出了於離散演算法的三維模原理和模型交互剖切技術。
分享友人