礦山設計 的英文怎麼說
中文拼音 [kuàngshānshèjì]
礦山設計
英文
pit planning- 礦 : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
- 山 : 名詞1 (地面形成的高聳的部分) hill; mountain 2 (形狀像山的東西) anything resembling a mountain...
- 設 : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
- 計 : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
- 礦山 : mine; hacienda; diggings; bal; groove礦山安全 mine safety; 礦山測量 [采礦工程] mining survey; lat...
- 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
-
Lp series chain crusher apply to fertilizer production in the block of broken, but also widely used in chemical industry, building materials, mining and other industries, aircraft used in the process of crushing the synchronous speed high - intensity resistance mo carbide chain plate, i expected out of rational design, materials uniform broken, it is not easy nien wall to facilitate cleaning
Lp系列鏈式破碎機適用於復合肥生產中塊狀物的破碎,同時也廣泛用於化工、建材、礦山等行業,該機在粉碎過程中採用同步轉速的高強度耐?硬質合金鏈板,進出料口設計合理,破碎物料均勻,不易粘壁,便於清理。Abstract : considering the stochastic characteristic of main hydrogeologic parameters in yuanbaoshan open coal pit, a groundwater stochastic management model for optimal drainage borehole design is established. the result of the modeling shows the effect of stochastic characteristics of hydrogeologic parameters on the result of management modeling. it was found that the higher the parameters uncertainty and the management reliability level, the worse the management result
文摘:從影響元寶山露天礦地下水疏乾的主要水文地質參數隨機性特徵分析入手,建立並求解了元寶山露天礦疏干工程優化設計的隨機地下水管理模型,揭示了水文地質參數隨機性對管理模型結果的影響,認為參數的隨機性越大,管理結果越壞;置信水平越高,管理結果越壞,且滲透系數和邊界條件對管理結果影響最大。Article 12 mine construction projects must be constructed in accordance with the design papers approved by the authorities in charge of mining enterprises
第十二條礦山建設工程必須按照管理礦山企業的主管部門批準的設計文件施工。Article 8 the design papers for mine construction projects must comply with the safety rules and technological standards for mining industry and shall, according to regulations of the state, be subject to the approval of the authorities in charge of mining enterprises ; those failing to comply with the safety rules and technological standards for mining industry may not be approved
第八條礦山建設工程的設計文件,必須符合礦山安全規程和行業技術規范,並按照國家規定經管理礦山企業的主管部門批準;不符合礦山安全規程和行業技術規范的,不得批準。After many years of civil construction and facility renovation, shmp become a modern large enterprise with complete management organization, strong technical ability, sufficient manufacturing facility, advanced procedure, perfect testing method to finish design and manufacturing of heavy equipment for power industries, metallurgy and rolling industries, forging and pressing industries, minery and cement industries, water conservancy, and also high quality heavy casting and forging
我公司經過多年的基本建設和技術改造,現已成為一個組織管理機構健全,技術力量雄厚,加工設備齊全,工藝手段先進,測試方法完善,可以獨立設計、製造大型電站、冶煉、軋鋼、鍛壓、礦山、水泥建材設備和大型優質鑄鍛件的現代化大型企業。Design on mine 3d mining subsidence prediction system base on idl
的礦山三維開采沉陷預測系統設計No matter the construction of the house, municipal utilities and mine project, and even the harnessing design of geological cala mity etc., all will be done by us with same splendidness, we will offer the best products and the most high - quality service, making our customers and the customer ' s customer carefree
無論是房屋、市政、礦山工程的施工,乃至地質災害的治理設計等,每一項我們都做得同樣出色,提供最好的產品和最優質的服務,讓客戶和客戶的客戶無憂!In this paper, a high performance sma system applied to steel bridge deck is put forth in allusion to the pavement project of the wuhan junshan yangtze river highway bridge. it comprises steel slab, zn coating layer, closing layer, adhesive, pre - mixed asphalt stone and dual layer sma from bottom to top. it is based on the fea results of the forces and deformation of the pavement layer by means of the algor feas, according to this bridge ' s traffic and the ambient temperature varying range of the pavement layer
本文針對武漢軍山長江公路大橋鋼箱梁橋面鋪裝工程,從鋪裝層環境溫度變化范圍、交通量等使用條件出發,在用algorfeas有限元分析軟體分析鋪裝層受力變形基礎上,提出了(即鋼板+金屬鋅塗層+封閉層+粘接劑+預拌瀝青碎石+雙層sma )的高性能鋼橋面sma鋪裝體系,並對這種sma的組成材料,包括改性瀝青、集料、礦粉、纖維進行了比較研究,設計了這種sma的配合比,對sma混合料的性能進行了對比試驗,對這種sma方案進行了疲勞性能研究,驗證了所選擇sma方案的可行性。A new systematic method for rock engineering design - mechanism pathway analysis is presented. it is pointed out that, by way of studying the internal mechanism network in rock engineering system, it is able to forcast the systems general behaviour characteristics so as to provide a reliable policy - making basis for the optimization design of the rock engineering of underground mines
介紹用於巖石工程設計的新系統方法? ?機理路徑分析方法,指出通過研究巖石工程系統內部的機理網路,能夠預測系統的總的行為特性,能夠為地下礦山巖石工程問題的優化設計提供可靠的決策依據。In order to make the best use of explosive energy in loosing soil or throwing it onto some area and ensuring the bottom meet some leveling requirements after blasting, a plane charge layout is often adopted according to blasting design and engineering quality requirements in open chamber blasting such as mine exploitation, field leveling and foundation pit excavation of construction
摘要在礦山剝離、場地平整以及建(構)築物基坑開挖等露天爆破中,為了充分利用炸藥能量將巖石松動或拋擲到一定區域,並確保底板滿足一定平整度要求,按照爆破技術設計和工程質量要求,需要設計平面布藥結構。It shall see to it that the recovery rate and impoverishment rate in mining and recovery rate in ore - dressing meet the design requirements
礦山企業的一採回采率、采礦貧化率和選礦回收率應當達到設計要求。Article 42 where a mine construction project is started without having the designs of its safety facilities approved, the mining enterprise concerned shall be ordered by the authorities in charge of mining enterprises to stop the construction ; with respect to the mining enterprise refusing to carry out the order, the matter shall be submitted by the authorities in charge of mining enterprises to the relevant people ' s government at or above the county level for a decision on the rescission of its mining permit and business license by the competent authorities
第四十二條礦山建設工程安全設施的設計未經批準擅自施工的,由管理礦山企業的主管部門責令停止施工;拒不執行的,由管理礦山企業的主管部門提請縣級以上人民政府決定由有關主管部門吊銷其采礦許可證和營業執照。In order to direct the water to the forebav of the pump station from the original canal, a channel long 135 m is designed. it crosses through the terrain top with a depth of more than 50 m. soil of the channel slopes is a strongly - weathered silty and sandy mudstone with many well - developed reticular cracks and takes the structural surfaces almost same as the channel slopes
東深供水工程金湖泵站位於塘廈鎮東面,屬低山、殘丘地貌,地面高程22 60m ;泵站前池進水渠橫切山脊,連接原東深供水河,設計開挖1條長135m的進水渠,坡高50多米,邊坡土質為強風化的粉砂質泥巖,網狀裂隙發育,結構面基本與坡面重合;坡體土質中含有較多的粘土礦物,具有遇水軟化的特性。However, for some reasons, there has been very few successful application of 3d technique in the area of mining design
然而,由於某些原因,三維建模技術在礦山生產設計中的應用還並不多見。Standard for architectural design of living and welfare facilities
有色金屬礦山生活福利設施建築設計標準Finally, jinduicheng mo. company open - pit is quoted as an instance for building mine transportation vechile scheduling system model, and according to the model, adopt genetic algorithm to study the optimization of mine transportation vechile scheduling system. a rational project is given to this problem, the paper also analysized the optimial design of mine transortation vechile scheduling, the model offering in this paper, convergence of optimal algorithm and data bank management, and transportation project of minerals and disposals is optimized, which realize the decision of transportation project and data visibilization, and wich improves the science and information process of transportation department management
最後,論文以金堆城鉬業公司露天礦為例建立礦山運輸車輛優化調度模型,結合所建立的礦山車輛優化調度模型,採用遺傳演算法對礦山運輸車輛系統進行優化研究,為其提供合理的體系方案。並對礦山車輛優化調度系統設計進行了詳細分析,提出的礦山車輛優化調度系統,集優化演算法與數據庫管理分析於一體,進行礦巖運輸方案的優化,實現調度方案決策的可視化、運行數據的可視化,促進運輸部門管理的科學化、信息化進程。This optimizing method is simple and practical and the programmed optimization program with such merits as high precision, fast operation and less workload is a reasonable method for the selection of fans in the design of mine ventilation system
該優選方法簡單實用,編制的優選程序精度高,運行速度快,工作量少,是礦山通風系統設計中風機選擇的一種較理想的方法。Mine plans - graphic design of sheets
礦山設計圖.布置圖圖形設計Article 14 mine pillars and rock pillars to be preserved as specified in the mining designs shall, within the prescribed period of time, be protected and may not be exploited or damaged
第十四條礦山設計規定保留的礦柱、巖柱,在規定的期限內,應當予以保護,不得開采或者毀壞。Since i joined abc company, i have led and participated in more than 20 mining engineering and consulting projects, from project proposal, pre - feasibility study, feasibility study, conceptual design, preliminary design to detailed design
自參加工作以來,主持和參與的礦山設計咨詢項目二十多個項,內容包括項目建議書、預可行性研究、可行性研究、方案設計、基本設計、詳細設計等等。分享友人