礦柱 的英文怎麼說

中文拼音 [kuàngzhù]
礦柱 英文
mine prop; pillar; post; stump; rib; jamp礦柱巷道 [采礦工程] pillar split; 礦柱回採 pillar recovery; 礦柱強度 pillar strength
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  1. Stability analysis of coal pillar and reinforcement technology in north air shaft in dongpang mine

    東龐北風井煤穩定性分析及其加固技術
  2. The application of heterogenous interface control - blasting techniques in the mining of high - level pillars at anqing copper mine

    異質界面控制爆破技術在安慶銅高階段礦柱回採中的應用
  3. Initiation is carried out by using millisecond detonators, the opening taking the form of holes in the remaining pillar.

    使用毫秒雷管進行起爆,開拓的方式則是在余留的礦柱中打眼放炮實現的。
  4. The 2 riflemen should protect your tiberium spike from buzzer attacks

    兩隊機槍兵應該保護你的礦柱免受蜂群的襲擊。
  5. Sawn pit timber ; boards and planks

    礦柱鋸材.坑道托板.木墊板
  6. Optimization of drift stoping technology and parameters of crown pillar

    中段礦柱進路回採工藝及參數優化
  7. Drawing back of pillars

    後退式回採礦柱
  8. Mining horizontal pillars with hydraulic roof propping in longwall caving method

    在長壁式崩落法中用液壓支護頂回採水平礦柱
  9. Research on cms - aided blast design for ore pillar extraction

    輔助礦柱回採爆破設計研究
  10. Study of the best pillar stoping of tongguanshan copper mine

    銅官山銅礦柱優化回採研究
  11. Pillar drawing in room - and - pillar mining at jinshan gold mine

    金山金法開採的礦柱回採
  12. Panel barrier pillar

    盤區隔離礦柱
  13. Practice and monitoring technology of pillar recovery at very large mined out areas in shizishan copper mine

    獅子山銅特大空區中礦柱回採的監測技術與實踐
  14. Placing a saboteur bomb on it in case he tries to recapture the spike is also a good idea

    放一個詭雷在上面,以防萬一你的對手占領礦柱也是個不錯的主意。
  15. Study on stability of middle room pillars in southern room shi rengou iron mine in transition from surface to underground

    石人溝鐵露天轉地下開采南區房間礦柱穩定性
  16. Article 14 mine pillars and rock pillars to be preserved as specified in the mining designs shall, within the prescribed period of time, be protected and may not be exploited or damaged

    第十四條山設計規定保留的礦柱、巖,在規定的期限內,應當予以保護,不得開采或者毀壞。
  17. Practice of consolidating the fractured zone in the permanent pillar by steel reinforced concrete shear hole

    鋼筋混凝土剪力洞加固永久礦柱中破碎帶的實踐
  18. Discussion on mechanism of surface collapse pit and dimensions of obstructive ridge for steep inclined coal seam mining

    急傾斜煤層開采地表塌陷坑形成機理與安全礦柱尺寸研究
  19. Probably the most important thing on the map is capturing the tiberium spikes and keeping control of them

    占領礦柱並保持控制它們,也許是地圖上最重要的事情了。
  20. So a summary of all of this is : get the spikes using sts as escorts, kill enemy scouts and protect your expansion at the same time, ( unless your enemy also st rushes, there nothing you can do ) stop expansions and harass a little bit by taking out heavily damaged buildings

    綜上所述,用影隊去護衛搶奪礦柱、消滅偵察兵並保護你的前哨,破壞對手前哨(除非你的對手也使影隊快攻,那你就做不成了) ,並且通過破壞建築來進行騷擾。
分享友人