礦石開采基地 的英文怎麼說
中文拼音 [kuàngdànkāicǎijīde]
礦石開采基地
英文
mining colony-
Because the ore has been mined for long time, the nature geological environment has been getting worse and worse, such as the baldness of mountain body, the rock is weathered to pieces, a lot of loose material distributing along the gully and its banks, the disaster of debris flow is seriowsly, and the production of the mine is constrained by debris flow disaster ; for example, a debris flow broke out on august 1999 and resulted in catastrophic hazards to the jingtieshan iron mine, resulted in a huge economic losses of 50 million yuan
鏡鐵山礦是酒鋼最主要的鐵礦石生產基地,礦區山高溝深,地質構造復雜,自然地質環境較差,在長期人為開采活動的影響下,地質自然環境進一步惡化,山體裸露,巖層破碎,大量鬆散固體物質堆積在溝道及溝道兩側,泥石流災害十分嚴重,嚴重製約了礦山的生產與發展。 1999年8月礦區黑溝南溝暴發生了嚴重的泥石流災害,致使礦山停產10多天,造成5000多萬元的經濟損失。Guishan coal mine, the only base for main coke mining in southern and southeast yunnan, is located at the boundary area between stone forest county, kunming city, and luxi county, honghe prefecture
圭山煤礦位於昆明市石林縣與紅河州瀘西縣交界處,是滇南和滇東南唯一開采主焦煤的基地。" field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir
「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。With computer imitation and laboratory physical analog as the lead and on the basis of test ore blocks and industrial blownoff - ore rock tests, study on the enlarged - structure parameters of sublevel caving in meishan iron mine was carried out, which included single tests of drilling and blasting parameters , transition sublevels and equipment complementation. the timely popularization of this enlarging structural parameter technique has greatly improved the performances of the sublevel caving mining and promoted the technological advance of underground mining
梅山鐵礦加大無底柱分段崩落法采礦結構參數研究,採用計算機模擬、實驗室物理模擬為先導,試驗礦塊、工業放出體試驗為基礎,分別進行了采場鑿巖爆破參數、過渡分段、設備配套等單項試驗,並在全礦及時進行了推廣應用,極大地改善了礦石開采過程中的各項指標,促進了地下礦山開採的技術進步。分享友人