福甕磷礦 的英文怎麼說

中文拼音 [wènglīnkuàng]
福甕磷礦 英文
fuquan weng'an phosphorus base
  • : Ⅰ名詞1 (幸福; 福氣) blessing; happiness; good luck; good fortune 2 (指福建) fujian province 3...
  • : 名詞1. (盛東西的陶器) urn; earthen jar 2. (姓氏) a surname
  • : 名詞[化學] phosphorus (15號元素,符號p)
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  1. A study on single reverse flotation of phosphate ore of wengfu phosphate mine by means of depressor of w

    98在反浮選中的選研究
  2. Application of wf - 01 collector in wengfu phosphorous mine ' s concentrator

    01捕收劑在廠的使用
  3. The influence of grinding mode on ore floatation index of wengfu phosphate mine

    方式對石浮選指標的影響
  4. Application of mining and haulage in slices in wengfu phosphate mine

    分采分運在的應用
  5. Study on maximization of transportation capacity of concentrate pulp pipeline in wengfu phosphate mine and its implementation

    漿管道輸送能力最大化的研究和實施
  6. Optimization of final mining area of open - pit phosphate ore mining in wengfu

    露天開采最終境界綜合優化淺論
  7. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  8. Based on mountain collapse status caused by daxin beidoushan mined - out area. to assess geological hazard and re - deter - mination of mining method in the mined - out area, the area was detected by transient electromagnetic method for finding spice distribution, occurrence condition and inferring position and shape

    摘要針對大信北斗山采空區引起山體坍塌的情況,為更好地進行地質災害評估和確定重新開采方案,採用瞬變電磁法探測對該區域進行勘探,以查明采空區的空間分佈范圍和賦存狀況,推斷出采空區的位置與形狀,其結果真實可靠。
分享友人