穩固圍巖 的英文怎麼說

中文拼音 [wěnwéiyán]
穩固圍巖 英文
firm wall
  • : 形容詞1 (穩定; 穩當) steady; stable; firm 2 (穩重) steady; staid; sedate 3 (穩妥) sure; rel...
  • : Ⅰ形容詞(結實; 牢固; 堅硬) firm; hard; solid Ⅱ副詞1 (堅決地; 堅定地) firmly; resolutely 2 [書...
  • : Ⅰ動詞1 (四周攔擋起來 使裡外不通; 環繞) enclose; surround; corral 2 (繞; 裹) wrap Ⅱ名詞1 (四...
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  • 穩固 : firm; steady; stable
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與的相互作用機理進行研究,利用全長錨錨桿的中性點理論,從等效均化的角度來考慮錨桿對的加作用,並推導了在簡單荷載作用下,含有襯砌、等效加后的、原始三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞應力、變形的影響。
  2. What ’ s more, this paper takes the effect of crown wall rock and mid - board foundation reinforced parametric variation on tunnel structure stress and stability into account grounded on building typical section model of i wall - rock sector

    另外,本文還通過建立類地段隧道典型斷面模型,分別考慮拱頂和中墻地基加參數的變化對隧道結構受力和定性的影響。
  3. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全定性及溫控方案提供依據。
  4. Concerning the construction of the shallow cover and the special shallow cover in the tunnel under the special geology conditions, the principle of " to stabilize the slopes with protecting arch ; to strengthen the earth with the pipe - shield support grouting ; to dig a hole shallowly ; to blast slightly ; to use strong supporting structure. " has been adopted to enter the tunnel safely ; in terms of the broken belt, the effective actions such as the pipe - shield support grouting, strengthening the surrounding rock in advance with advanced bolt and steel grids, and so on, are taken to pass the poor conditioned part smoothly

    對于特殊地質中的淺理、特淺埋進洞的施工,堅持「護拱定邊仰坡,大管棚注漿加土體,淺打眼、弱爆破、強支護」的原則,做到安全進洞;對于斷層破碎帶,則採取了管棚注漿,超前錨桿預先加並結合鋼格柵支撐等有力措施,順利通過了不良地段。
  5. In this paper the friction piles are used in zipingpu multi - purpose dam construction project, the spillway in the side slope is covered with overburden, the horizontal area is from sp. 0 + 200m to sp. 0 + 280m, the elevation is about from el. 810m to el. 950m, there is hard and integral rock under the overburden, which provides enough anchor ability, and it ' s requirement to set the friction pile at the appropriate place ; in order to improve the slope stability that suitable excavation or weeding off the disadvantage load on the landslide are good measures, for the scarp it ' s better to reduce the slope

    摘要紫坪鋪水利樞紐工程溢洪道樁號0 + 200 ~ 0 + 280 、高程810 ~ 950m范的內側邊坡為覆蓋層邊坡,坡體下部有較為完整堅硬的石,具備提供足夠錨力的條件,在適當的位置可以考慮設置抗滑樁,再通過適量的開挖提高邊坡定性,或將滑坡體上部不利於定的荷載挖除,對于陡坡的坡面可以將坡削緩,則效果會更好。
  6. The west dam faced the inner sea of rocky harbour and was 2, 470 ft. long and 333 ft. high. the construction of the 2 dams was a complicated process, as 2 cofferdams had to be constructed at each of the sites, before the main dams could be built. these were to keep the dam sites dry for construction

    兩條主壩建築工程相當復雜,在興建主壩之前,需于建築堤壩地點建造堰,將海水隔開,抽乾海床范內的海水,挖除黏土和沙,才築堤壩,使主壩能地建造在堅硬的石上。
  7. At last, the analysis of the redistribution of the initial crust stress and the distribution of the plastic area is made ; the stability evaluation of the rock mass around the cavern is provided. the outcome is conformed with the reality. then applys the approximately equivalent dissolved rule, and considers the action of anchor staff to consolidate the rock mass, and correspond model is established, nonlinear finite element m ethod is applied to analyze the effect of the supports, the result shows that the action of anchor staff is obvious and deformation and stress state of the rock mass is greatly approved. so, the result conforms that the idea and the means used in the thesis is applicable

    最後運用非線性有限元對廠房開挖后的應力重分佈和塑性開展區的分佈作了分析,評價了廠房的定性,其結果與實際開挖情況基本吻合,針對定性評價的結果,提出了錨方案,運用等效概化原理考慮錨桿的作用,建立了採用系統錨桿加后的地下廠房的三維彈塑性模型,運用非線性有限元分析了加效果,結果表明錨作用明顯,變形明顯減小,內的應力狀態大為改善,從而驗證了本文所採用的研究思想和方法是切實可行性的。
  8. Based on the assessment of seismic risk of surrounding rocks, three sections are selected to perform fem calculating using ground acceleration history of different engineering properties as input. through study of the displacement and stress fields of grotto surrounding rocks under ground motion of different pga, frequency spectrum and duration, the influence of structure of grottoes and neighboring grottoes on dynamic damage and stability of country rock is discussed

    通過對不同地震動峰值加速度( pga ) 、不同頻譜、不同持時作用下,錨索加洞窟的位移場和應力場特徵的研究,探討了不同地震動作用下,洞窟的結構及洞窟之間的組合關系對動態損傷及定性的影響。
分享友人