空接線柱 的英文怎麼說

中文拼音 [kōngjiēxiànzhù]
空接線柱 英文
dead-end clamp
  • : 空Ⅰ形容詞(不包含什麼; 裏面沒有東西或沒有內容; 不切實際的) empty; hollow; void Ⅱ名詞1 (天空) s...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 接線 : 1 [電學] (連接導線) wiring2 (電話員接通線路) work a telephone switchboard; connection接線插座...
  1. Using the vector potential, the expression for calculating inductance of air - cored solenoid coil is derived in the dissertation. and the calculating methods of function t in the calculating expression are given for the convenience of the calculation of inductance while the precision is not strictly requested

    利用矢量磁位a直推導出了通電心圓圈電感的計算表達式,給出了求解計算式中函數t的計算方法,以方便精度要求不高時的電感計算。
  2. Aerospace series - circuit breakers - test methods - insertion and extraction forces of signal contact terminals

    航天系列.斷路器.試驗方法.信號的插入力和拔出力
  3. It ' s an ideal structural system and has multi - earthquake resistance ability because of a great deal of slabs removed in floors above the transfer - story amended the lateral stiffness of the stories near the transfer - story. based on the available references, the five - spring line element, the three - spring line element and the multiple vertical - line - element model are introduced to model special column, beam and shear - wall, the relevant stiffness matrixes are deduced and the restoring - force models are gaven to deep into the elasto - plastic seismic characteristics of the structure. acording to the results of shaking table test and elastic finite element analysis, a new making model melhod is presented in which uses the linear and the nonlinear element and the assumption that the floor is infinitely rigid in different areas

    為進一步研究這種復雜高層建築結構的彈塑性性能,本文在國內外現有研究的基礎上,提出利用五彈簧桿元、三彈簧桿元及多豎單元模型分別模擬、梁和剪力墻,推導了相應的剛度矩陣並給出了恢復力模型;結合試驗研究和精細有限元分析的結論,提出性和非性單元相結合,剛性樓板假定和彈性樓板相結合的建模方法,較好地解決了間結構彈塑性分析中佔用計算機資源較多的問題;力大型有限元分析程序? ? ansys ,在上述建模思路的指導下建立了結構的間非性分析模型,進行了間三維彈塑性時程分析。
  4. The function of stone artistic splice complete through to established basic design or source material warehouse with the help of others graph process software. besides author come up with a new program or machine method in accordance with stagger in the thicknes and vertical length at the stone sticking execution, i. e ensure the accuracy in measurement to approach subsection by space spiral line, the data used directly by numerical control machine. finally machined the stone become a spiral line columned surface arc slab

    此外,針對旋轉樓梯扶手石材貼片施工時所出現的厚度和垂直方向易產生較大錯邊的問題,提出了一種新的建模方案和加工措施,即在保證測量精度的基礎上,分段以間螺旋逼近,經過計算機處理后的參數直可供數控加工使用,最後把石材貼片加工成螺旋型的面弧形扳。
  5. Construction works for the 4. 4km tin shui wai light rail extensions are now taking place at the junction of tin wah road and tin shui road. the contractor is carrying out piling works for the light rail viaducts and building an elevated light rail stop that will link the stop with nearby housing estates and shopping malls. at other sections of the extensions, the contractor is working on the surcharge

    4公里的天水圍新支工程,現時工程主要集中在天華路天瑞路交匯處,承建商正興建架橋的樁,該處將設置一個架車站,連鄰近的屋?及商場,至於其他路段,現時主要是進行壓土工程。
  6. Fig. 3 integrated wind profiler and rass at sha lo wan. the rectangular antenna in the middle transmits and receives radio waves

    中間的長方形天作用是發放和收無電波,周邊的四個圓形擴音器則向中發出聲波。
  7. But in fact, there are many windings on each leg of a balance transformer, and the winding impedance relationships that the balance condition requires are strict, so it is difficult to design and make such transformers. if adopting the connection scheme of dual windings, the windings on single leg will increase almost doubly. it is more difficult to satisfy the balance condition and probably it will confront conflict when arranging these windings, so parameters of various phases can not be balanced

    事實上由於平衡變壓器單繞組數目較多,若採用雙重方案,則單繞組數目增加近一倍,滿足平衡條件十分困難,甚至使得繞組在間上的布置產生矛盾,無法達到各相參數平衡的要求,而「四相四心「結構的三相變四相電力變壓器較好的解決了這一難題。
  8. Year of china digi tal entertainment expo & conference will obtain hall 1 and hall 2 which is 11, 500 sqm each, pillar - free and 11 meters high limits will give more room to exhibitors for booth design. supply canals underneath the floor connected directly to the booths, providing on - site all necessary utilities including power, gas, water, compressed air and various modern telecommunications including isdn, adsl, wireless broadband network and satellite tv

    第二屆中國國際數碼互動娛樂產品及技術應用展覽會將使用面積為11500平米的一號、二號展館。展館為無式結構,凈高度11米,展館地槽內鋪設有後勤供應管道,直展位,現場提供所需的電力、壓縮氣和各種現代化通訊設施包括isdn 、 adsl 、無寬帶網和衛星電視。
  9. Aerospace series - circuit breakers - test methods - strength of signal contact terminals

    航天系列.斷路器.試驗方法.信號強度
  10. Aerospace series - circuits breakers - test methods - part 510 : strength of signal contact terminals

    航天系列.斷路器.試驗方法.第510部分:信號強度
  11. Aerospace series - circuit breakers - test methods - part 509 : insertion and extraction forces of signal contact terminals

    航天系列.斷路器.試驗方法.第509部分:信號的插入力和拔出力
  12. Aerospace series - circuit breakers - test methods - part 510 : strength of signal contact terminals ; german and english version en 3841 - 510 : 2004

    航天系列.斷路器.試驗方法.第510部分:信號
  13. Aerospace series - circuit breakers - test methods - part 509 : insertion and extraction forces of signal contact terminals ; german and english version en 3841 - 509 : 2004

    航天系列.斷路器.試驗方法.第509部分:信號
分享友人