立樁標出 的英文怎麼說
中文拼音 [lìzhuāngbiāochū]
立樁標出
英文
stake out-
The energy equilibrium analysis model is established in allusion to the unreasonable operating temperature, imperfect oil production process and lower energy utilizing rate in zhuangxi oil production station, the relative evaluation index and calculation method are given as well
摘要針對樁西聯合站生產環節中的某些運行溫度不合理、生產工藝不完善、能量利用率較低等現狀,建立了能量平衡分析模型,給出了相應的評價指標和計算方法。The failure models of the pile foundation of the girder flume in the li river are analyzed, the corresponding functional functions are established, and the reliability index of a single concrete pile is calculated
摘要分析了澧河段梁式渡槽樁基礎的破壞模式,建立了相應的功能函數,計算得出混凝土單樁的可靠指標。The objective function is the cost of anti - slide pile " s per meter ; the constraint conditions are the strength of anti - slide pile " s normal section and inclined section, the ratio of reinforcing design and the size of section in the design code ; the design variables are the height of section, the area of reinforcement and the amount of hoop. and the optimization model is solved by 0. 618 method
本文提出的優化設計方法,以樁單位長度的總造價為目標函數,以規范對單筋梁的正、斜截面強度,配筋率及截面尺寸等要求為約束條件,以樁截面高度,抗彎縱筋面積,抗剪箍筋數量等為設計變量,來建立優化模型,並用0 . 618法進行求解。( 3 ) optimization design principle of long - short - pile composite foundation is put forward, base on which replacement ratio and pile length is taken as design variable, bearing capacity, settlement, stratum strength and other demands acted as constraint function, pile cost taken as objective function, so the optimization design model of long - short - pile composite foundation is built
( 3 )提出了長短樁復合地基優化設計原理,在此基礎上將置換率和樁長作為設計變量,承載力、沉降、下臥層強度等要求作為約束函數,總制樁費用作為目標函數,建立出長短樁復合地基優化設計數學模型。分享友人