竣工日程 的英文怎麼說

中文拼音 [jùngōngchéng]
竣工日程 英文
latest finish time
  • : 動詞(完畢) complete; finish
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (太陽) sun 2 (白天) daytime; day 3 (一晝夜; 天) day 4 (泛指某一段時間) time 5 (日...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 竣工 : (of a project) be completed
  • 日程 : programme; schedule; agenda for the day
  1. The 500 - kilovolt electricity transmission line , extending from fangzheng, mudanjiang, dunhua to baojia, as part of the project of “ electricity transmission from north to south ” of the province , has been completed and will be put into operation in succession

    ,黑龍江「北電南送」 500千伏方正牡丹江敦化包家輸變電的線路架設全部,並即將陸續投入運營。
  2. The tolo highway between island house interchange and ma liu shui interchange is being widened to dual four - lane carriageway standard, with the works due to be completed in mid - 2003. in ma on shan, to cope with future growth in traffic demand, the sai sha road section between kam ying road and the junction with trunk road t7 at sha on street is being widened to dual two - lane standard ; work started in august 2002 for completion in 2005

    為配合馬鞍山後交通量的增長,介乎錦英路與後的t7號主幹道路交界處的一段西沙路,已在二零零二年八月展開擴闊,改為雙雙線行車道,預期可在二零零五年
  3. Basis " urban commodity house opens to booking administrative measure " ( 2004 edit ) regulation, commodity house opens to booking ought to accord with the following condition : 1, already pay is full gold of land access sell one ' s own things, obtain land access letter ; 2, licence of program of hold construction project and construction permit ; 3, by offer the commodity house calculation that open to booking, the capital that devoted development builds achieves the 25 % above that project always invests, had fixed construction schedule and complete due date

    根據《城市商品房預售治理辦法》 ( 2004修訂)的規定,商品房預售應當符合以下條件: 1 、已交付全部土地使用權出讓金,並取得土地使用權證書; 2 、持有建設規劃許可證和施許可證; 3 、按提供預售的商品房計算,投入開發建設的資金達到建設總投資的25 %以上,並已經確定了施進度和交付期。
  4. Protection against flooding is being improved in the area. the construction works for some of the flood control schemes for the river indus are progressing with completion dates to tie in with the shenzhen river regulation project so as to relieve the risk of flooding by 2002

    梧桐河防洪計劃多項正進行得如火如荼,期均已訂出,務使與深圳河治理配合,以期在二零零二年或之前減低水浸風險。
  5. The campaign effectively promoted the management in enterprises and the quality of products

    該項目第一期計劃於2006年1月1投產。
  6. To tie in with the training of shenzhen river, tdd started the river training works in the river indus basin from 1998 onwards

    配合深圳河的進度,拓展署由九八年起,陸續展開梧桐河盆地的治河,至今有關的主要,為北區解決多年來的水患威脅。
  7. Speaking at a ceremony to mark the completion of works on the main drainage channels for river indus, river beas and river sutlej, the director of territory development, mr wong hung - kin, said today ( september 17 ) that the works for these three rivers in the river indus basin were sizable and entailed the straightening and widening of some 9km of existing meandering rivers with raised river embankments. the works also included the re - provisioning of existing facilities that were affected by the projects such as the reconstruction of 12 river - crossing bridges

    拓展署署長黃鴻堅今(九月十七)在梧桐河、雙魚河及石上河主要排水道典禮上致辭時表示,整項梧桐河盆地的治河涉及上述三條位於新界北區的主要河道,規模龐大,新河道總長約9公里,將原來迂迴曲折的河道拉直及擴闊,並且將河堤加高及重置受影響的原有設施,包括12條過河橋梁。
  8. Speech by the commissioner for census and statistics, mr frederick w h ho, at the hong kong statistical society s prize - presentation ceremony of the statistical project competition for secondary school students on april 26, 2002

    房屋及規劃地政局局長孫明揚出席市區重建局上環坊計劃首期典禮的致辭全文(十二月三十一
  9. Officiating at the completion ceremony of kcr university station today were mr k y yeung, chairman & chief executive, mr y t li, deputy director, east rail, professor arthur k c li, vice - chancellor of the chinese university of hong kong and professor rance lee, head of chung chi college of the chinese university of hong kong

    九廣鐵路公司今舉行大學車站擴建典禮,主席兼行政總裁楊啟彥先生、東鐵副總監李殷泰先生、香港中文大學校長李國章教授及香港中文大學崇基學院院長李沛良教授出任主禮嘉賓。
  10. According to the information paper provided by the government for the joint meeting of the environmental affairs panel, the transport panel and the planning, lands and works panel of this council on 15 january 2002, the government planned to commence works on retrofitting the tsing tsuen bridge with noise barriers in april 2002, and the project was expected to be completed in december 2007

    根據政府為本會環境事務委員會、交通事務委員會和規劃地政及事務委員會於2002年1月15舉行的聯席會議提供的資料文件,政府計劃於2002年4月展開在青荃橋加設隔音屏障的,並預計於2007年12月
  11. Housing project guarantees period the computation since the day that checks and accept qualification from project complete

    房屋建築保修期從驗收合格之起計算。
  12. Another project is under way near fanlingcentre with a target completion date in early 1998

    另外一項消減噪音將在接近粉嶺中心的地點進行,預計的期為一九九八年初。
  13. 15 " time for completion " means the time for completing the execution of and passing the tests on completion of the works or any section or part thereof as stated in the contract calculated from the commencement date

    15時間是指合同規定從期算起到或其任何部分或區段施結束並且通過檢驗的時間。
  14. Construction completion date

    期:
  15. After completion of th ecivil work of the projexts, the water, power, gas, and telecommunication departments shall ensure to supply water, power. gas and telecommunication services in 15 days so long as the project sites are within the services areas

    項目后,只要是在城網服務范圍內的,供水、供電、供氣、電信單位要確保十五內實現通水(電、氣、話) 。
  16. 16 " time for completion " means the time for completing the subcontract works as stated in the appendix ( or as extended under sub - clause 7. 3 ), calculated from the commencement date

    時間"指附錄所述的完成分包的時間(或根據副條款7 . 3延期時) ,從開期開始計算。
  17. On jan. 8, 2003, phase i 50, 000 t / a electrolyzed aluminum project was formally started and completed and put into production on jun. 29, 2005

    於2003年元月8正式開建設,一期一段5萬噸/年電解鋁於2005年6月29投產。
  18. Contractor must begin the construction within 5 days after the contract signed and issue the completion work chart and completion data to client 30 days before the works acceptance, otherwise works will not be testified

    承包人必須在本合同簽定后5個內開始建設,並在本驗收前30天將圖、資料交給發包人,否則不予驗收。
  19. Kingboard chemical holdings limited hkex : 148 announces the granding opening of the caustic soda plant, phase ii and hosts a foundation ceremony for caustic soda plant phase iii in hengyang, hunan province

    建滔化集團香港交易所: 148公布,集團旗下位於湖南衡陽之燒鹼廠前舉行了第二期擴展開業儀式,以及第三期擴展奠基典禮。
  20. The tmsb is proposed to be dual 2 lane and the completion date is subject to the timing of the commissioning of the ldyb and the future land use planning in the proximity

    屯門南繞道擬建為雙雙線行車道,期要視乎伶仃洋大橋的動時間及附近地區的未來土地用途規劃而定。
分享友人