竣工驗收 的英文怎麼說

中文拼音 [jùngōngyànshōu]
竣工驗收 英文
final acceptance of construction
  • : 動詞(完畢) complete; finish
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ動詞1 (把攤開的或分散的事物聚集、合攏) put away; take in 2 (收取) collect 3 (收割) harvest...
  • 竣工 : (of a project) be completed
  • 驗收 : check and accept; check before acceptance; check upon delivery; acceptance check; control reception
  1. Article 38. the competent department of city planning administration may participate in the checking and acceptance of important development projects within a planned urban area

    第三十八條城市規劃行政主管部門可以參加城市規劃區內重要建設程的竣工驗收
  2. The construction unit shall submit to the competent department of city planning administration documents related to the completion of a development project within a planned urban area within six months of the checking and acceptance of the project

    城市規劃區內的建設程,建設單位應當在竣工驗收后六個月內向城市規劃行政主管部門報送有關資料。
  3. The correction action will be towards the following phenomena : reconstructing and fixing up buildings without permission ; opening stores without permission before building construction being finished and checked and changing the building utilization items without permission

    將被予以整治的行為包括:擅自對建築物進行改建、裝修;在未經竣工驗收的建築物內開設商鋪;擅自改變建築物使用功能等。
  4. No construction project shall be put into operation without having its occupational - disease - prevention facilities accepted by the public health authority upon the acceptance of the construction project

    建設項目竣工驗收時,其職業病防護設施經衛生行政部門合格后,方可投入正式生產和使用。
  5. Game analysis of rent - seeking in tests on completion

    竣工驗收階段尋租博弈分析
  6. The inspection and acceptance of construction projects upon completion shall be carried out according to the blueprints and written instructions, and to the work testing norms and quality inspection standards issued by the state

    建設程的竣工驗收,應以施圖紙及說明書、國家頒發的施規范和質量檢標準為依據。
  7. Application estate counterpoises initiative register should submit following document : ? one, land access belongs to a proof ; ? 2, building permit ; ? 3, construction permit ; ? 4, building complete checks and accept card ; ? 5, the book of complete settle accounts with the authorized orgnaization that appoints via municipal government ; ? 6, complete of building design general layout, building pursues ( include monomer to build plane, establish ) of face, profile ; ? 7, the measurement that the mechanism that register approbates orgnaization transaction of issued on - the - spot mapping result

    申請房地產權初始登記應提交下列文件: ?一、土地使用權屬證實; ?二、建築許可證; ?三、施許可證; ?四、建築物竣工驗收證; ?五、經市政府指定的機構審定的結算書; ?六、建築設計總平面圖、建築物圖(包括單體建築平面、立面、剖面圖) ; ?七、登記機關認可的測量機構出具的實地測繪結果報告書。
  8. Development business registers mechanism to apply for building droit to building administration in 3 months after building building complete initiative register, apply for to acquire building property namely card, should refer file of the proof that use the land or land to use complete of licence, construction permit, building to check and accept data and material of other and relevant proof

    開發商在新建房屋后3個月向房屋行政登記機關申請房屋所有權初始登記,即申請取得房屋所有權證,並應提交用地證實文件或土地使用許可證、施許可證、房屋竣工驗收資料以及其他相關證實材料。
  9. Non - industrial projects refer to the major projects and accessory facilities completed which possess the designed capacity and have been checked, accepted and formally put into production

    業項目是指設計文件規定的主體程和相應的配套程全部建成,能夠發揮設計規定的全部效益,經鑒定合格或達到竣工驗收標準,正式移交使用的建設項目。
  10. Improving measures in labour - hygienic assessment for an acceptance test of an engineering

    竣工驗收勞動衛生評價及整改措施
  11. This paper, through the research on the implementing of gaobazhou water conservancy project, demonstrated that the project is technical feasible, economic reasonable, and is conform to the state macro policy in external environment. described the full - aspect management on the design process of gaobazhou water conservancy project, fully demonstrated that the selection of design scheme and the design quality is directly related to the investment, quality and progress control of the project ; described the full - aspect management on the construction process of gaobazhou water conservancy project, discussed the management procedure and manner of supervisor in the construction process, how does the contractor to complete construction task scientifically and reasonably by following the certain supervision procedure based on the contract ; described the management on the procurement of gaobazhou water conservancy project, clarified these cautions to be taken during material and equipment procurement through the discussion on the content of procurement contract ; described the project acceptance and after - event evaluation of gaobazhou water conservancy project, fully defined the content for the final acceptance of the project ; fully described the comprehensive management carried out on gaobazhou water conservancy project, mainly focused on the study of information management, communication management, conflict management and risk management, which ensured the smooth execution of the project

    本文通過對高壩洲水利樞紐程項目實施的研究,論證了高壩洲水利樞紐程項目在技術上是可行的,在經濟上是合理的,在外部環境方面符合國家的宏觀政策;闡述了高壩洲水利樞紐程設計過程的全面管理,充分論證了設計方案的選擇及設計質量的高低,直接關繫到程項目的投資、質量和程進度的控制好壞;闡述了高壩洲水利樞紐程施過程的全面管理,論述了監理在施過程中的管理程序和方法,施單位遵循一定的監理程序,依據施合同科學合理地完成施任務;闡述了高壩洲水利樞紐物質設備的采購管理,通過對采購合同內容的論述,明確了物質設備采購時應注意的問題;闡述了高壩洲水利樞紐程項目及后評價,明確了高壩洲水利樞紐程項目竣工驗收的內容;較全面地闡述了高壩洲水利樞紐程項目實施的綜合管理,重點研究了保證高壩洲水利樞紐程項目順利實施的信息管理、溝通管理、沖突管理和風險管理。
  12. This paper presents a study and analysis of project management organization ' s set up, progress control, quality control, safety control, capital control, bidding management and construction spot management, risk management etc. and on the basis of the study and analysis, a set of strategic plan about project management appropriate for beijing huamao center is worked out

    本文從投資方程項目管理的角度對北京華貿中心程項目建設管理模式、組織機構的設立、期控制、質量控制、安全控制、投資控制、程招投標管理、合同管理、信息管理、施現場管理、竣工驗收及項目后評價管理、風險管理等方面作了較深入的研究、分析,制定出一整套適合本程項目特點及市場定位的程項目的建設管理策劃方案。
  13. Which is situated in the western of he nan and is drought year in year out and it is a multiple - purpose water supply development with agricultural irrigation, municipal water supply and rural water of men and domestic animals. the irrigation district was designed by he nan water survey designing institute in 1967, and began to be built in 1970. the aggregate main canal and the east - two main canal were built up and began to irrigate partially in 1974. up of the dong song part of the main canal had been built in 1980, and the first periodical project was completed in 1991. one part of the west main canal was built afterward

    河南省陸渾灌區是河南省百萬畝以上大型灌區之一,地處十年九旱的河南省西部,是一集農業灌溉,城市供水,農村人蓄吃水為一體的多目標供水程,灌區於1967年由河南省水利勘測設計院開始勘測規劃設計, 1970年開建設, 1974年建成總乾渠、東二乾渠,並通水局部施灌, 1980年完成東一乾渠東宋以上渠段, 1991年第一期竣工驗收,以後又修建了西乾渠部分程。
  14. Industrial projects refers to the major projects and accessory facilities completed which result in forming production capacity and have been checked and accepted while the living and welfare facilities have been completed and can ensure normal production and formally put into production

    業項目是指設計文件規定形成生產能力的主體程及其相應配套的輔助設施全部建成,經負荷試運轉,證明具備生產設計規定合格產品的條件,並經過鑒定合格或達到竣工驗收標準,與生產性程配套的生活福利設施可以滿足近期正常生產的需要,正式移交生產的建設項目。
  15. Housing project guarantees period the computation since the day that checks and accept qualification from project complete

    房屋建築程保修期從竣工驗收合格之日起計算。
  16. Main quality management stages are project design stage, pre - construction stage, construction stage, check before acceptance stage

    主要有以下的一些階段:項目設計階段的質量管理、項目施前期的質量管理、項目施過程的質量管理和項目竣工驗收階段的質量管理。
  17. Completion confirming meeting of displaying and reconstructing projects

    陳列改造等項目竣工驗收
  18. Introduction of a rule of completion acceptance on municipal engineering quality

    備案制下市政程質量竣工驗收程序介紹
  19. The check and acceptance of completed constructive projects and the archival work of enterprises

    建設項目竣工驗收與企業檔案
  20. Code of start - up completion acceptance for power transmission distribution project of 110kv and above

    110kv及以上送變電程啟動及竣工驗收規程
分享友人