第三位控制 的英文怎麼說
中文拼音 [dìsānwèikòngzhì]
第三位控制
英文
tertiary control- 第 : Ⅰ助詞(用在整數的數詞前 表示次序) auxiliary word for ordinal numbers Ⅱ名詞1 [書面語] (科第) gr...
- 三 : Ⅰ數詞1. (二加一后所得) three 2. (表示多數或多次) more than two; several; many Ⅱ名詞(姓氏) a surname
- 位 : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
- 控 : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
- 制 : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
- 第三 : third第三帝國 [德國] the third reich (1934 1945); 第三 (層)樓 [美國] third story; [英國] seco...
- 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
-
A variety of other practical training have been provided for selected officers throughout the year : shotgun training for 696 officers, revolver qualifications for 29 woman officers, induction course for enhanced command and control computer system ( ecaccs ) leading to the re - establishment of the 350 - officer communications cadre for all regional command and control centres at the exigencies of the service
在過去一年,輔警隊為同僚安排了不同類型的實務訓練,計有696人接受雷明登散彈槍訓練及29位女警參與槍械訓練、第二代指揮及控制電腦系統訓練班,令為數三百五十人的通訊組亦得以重新成立而在各總區指揮及控制中心服務。The mutant lines were crossed with deficiency lines on chromosome 2 and 3 respectively, and the genetic sites of 11 stocks have been determined. of them four showed a different phenotype from the known genes that control the heart development
分別將這些有心臟突變的品系與果蠅第二和第三染色體缺失系雜交,測定了11個品系的遺傳學位點,其中4個品系在遺傳學位點上有別于已經報道的心臟發育控制基因。Moreover, when integrated with the automatic location identification feature of the emergency telephone system it allows the call - taker to see instantly the location of the fixed - line caller and the incident in caccs3 - core and on the gis map
另外,第三代電腦輔助指揮及控制系統配合緊急求助電話系統中的自動追尋地點功能后,只要來電者使用固網電話,接聽來電的人員就可以在系統和地理訊息系統的地圖中迅速找出來電者的位置。Bits supplies the synchronous timing signal to these equipments inside the telecommunicationt building, such as dps, atm, no. 7, dxc, tm & adm in sdh, don and in etc. the related techniques are involved in the content of synchronization ne twork, timing distribution, the timing signal transportations x impairments etc. the second chapter tells the structure and the function of the building integrated timing system. the third chapter summarizes the digital synchronization network techniques, which emphasizes the basic concept of synchronization networks analyzes the necessity of building the synchronization network and introduces all kinds of synchronization methods. the fourth chapter represents the transportation of the synchronization signal
本文第二章講述了通信樓綜合定時系統的構成及作用:第三章概述了數字同步網技術,著重描述了同步網的基本概念,分析了建立同步網的必要性,講述了各種同步方法;第四章闡述了同步定時信號的傳輸;第五章介紹了bits設備所支持的同步狀態消息;第六章、第七章為本文的重點,通過對時鐘信號建立數學模型,從理論上分析時鐘內部噪聲和相位瞬變產生時鐘定時信號損傷的原理,企圖尋找到更好地控制頻率漂移的方法。Firstly, based on the basin prototype, the triassic and jurassic mudstone and coal, the main source rocks of the basin, did not develop better in baicheng sag than in the northern thrust belt including keyi structural belt ; secondly, because of the thrusting happened in late cenozoic, the triassic and jurassic source rocks reach to a high to over high maturity and thus generate gas or condensate oil mainly. thirdly, the thrust faults compelled the natural gas to migrate from the north to the south or from the deep to the shallow. as a result, the keyi structural belt and the eastern qiulitage structural belt enriched in natural gas because they were not only located on the migration routines of the natural gas, but also developed simultaneously when the gas migration happened
從盆地構造史研究的角度認為庫車盆地的天然氣主要來源於北部山前沖斷帶: 1受原型盆地構造格局的制約,三疊系侏羅系烴源巖發育的最有利位置不是在拜城凹陷,而是在克依構造帶及其以北的北部山前沖斷帶2晚第三紀以來的逆沖推覆作用使得烴源巖提早進入高過成熟階段,並以產氣和凝析油為主3逆沖推覆作用所產生的北傾逆斷層控制天然氣自下而上自北而南運移,位於運移路線上的克依構造帶和秋里塔格構造帶的東段與烴源巖的排氣期匹配較好,從而使這些地區最富集天然氣。According to the situation request, we combine with the fact on the railway for the time being, raised the whole views and suggestions to the railway improvement, the first : to realise railway shareholding entreprises is the basic way of railway improvement winder the public ownership circumstance, the second : it is gotton the whole locatim to the function of ministery of rail ways, railway bureau. the branch of railway bureau and the units of railway department, it is designed the whole developing frame that the funtion of ministry of railways is macro - controler, the railway bureau or its branch is management substance which ouur legal qualifaction the unit of railway department is the basic product unit, the third : it describes kinds of faults on the present four level management, and tolal the data auording to the fact
根據形勢要求,結合目前鐵路的實際情況,對當今鐵路的改革提出了整體的看法和建議:第一、實現鐵路企業股份制是公有制條件下鐵路改革的根本出路;第二、對鐵道部、鐵路局、鐵路分局、基層站段的功能給予了整體的定位;設計了鐵道部的功能是宏觀調控者,鐵路局或分局為法人代表的經營實體,基礎站段為生產基本單位的整體改革框架;第三、對目前四級管理體制的種種缺陷作了描述,並根據實際情況進行了數據統計。As one side of the interrelated transaction is usually dominating the other, the former often purposely violates the interests of the corporation creditors and concludes unfair interrelated transactions for its own or a third party ' s benefits, which objectively enlarges the risks on the part of the coporation creditors
由於關聯方之間存在著控制與被控制的關系,控制方往往利用其控制地位,從事有利於自己及第三人利益的不當關聯交易,故意損害公司債權人的利益,客觀上加大了關聯交易中公司債權人的風險。Chapter three discuss the actuality of highroad engineering cost of our province through four methods, such as general analysis, comparable conversion analysis of some projects, measure the cost of highway segment and analysis of type, form the viewpoint of the stage of design and execution if the major stage that we must pay more attention to
第三章分別從總體分析、部分路段的建安費可比換算分析、高速公路各部分造價比重分析及典型公路實例分析等方面,多角度、多方位論述了浙江省公路工程造價的現狀,提出了重點控制設計與施工階段的觀點。The dislocation interfaces of early stage were controlled by the slide of the ne fold. the dominant dislocation interfaces, in the dam area, is the one of the second stage, which resulted from the slide of the lava layer and lagerkluftes from nw to se because of the affect of the majiaheba faultage ' s thrusting overriding to the dam area from nw to se. the dislocation interfaces of the third stage were the result of the overprint of the structure of ne to the one of nw
早期階段形成的錯動帶受控于北東向縱彎褶皺的層間彎滑機制;第二階段形成的錯動帶在壩區佔主導地位,它們是由於北東向馬家河壩斷層由北西向南東的滑脫逆沖推覆影響壩區,並造成壩區向南東緩傾的巖層沿原生構造面向南東滑動的結果;第三階段形成的錯動帶則是由於北西向構造疊加於早期北東向構造之上而致。The paper mainly consists of three parts : the theoretical parts include the summarization of meridian research, and the research about the characteristic of low impedance on meridian and acupoints. the second part focuses on the design of the testing instrument, which comprises hardware design and software design. detector collects the reflected information which is stimulated by micro - current on meridian and acupoints, then the signals are transacted by micro - controller and meridian arithmetic, finally the health status report is displayed on screen and can be printed
主要工作分為三個部分,第一部分是經絡研究綜述與經穴皮膚電阻抗特性;第二部分為儀器系統設計,包括硬體設計和軟體設計,實現對採集人體穴位經電流測試(給一定的電流刺激)所反射出來的信息,經微控制器和中醫經穴演算法的處理后,在屏幕上顯示或列印出被測者的健康狀況。The system comprises the integrated communication system, the emergency telephone system, the automatic vehicle location system and geographic information system avls gis, the mobile computing and messaging system, and the third generation computer assisted command and control system caccs3 - core
這系統包括綜合通訊系統緊急求助電話系統自動車輛顯示位置及地域資訊系統流動電腦信息系統,以及第三代電腦輔助指揮及控制系統。In january the oecd said that if pension and health spending were not trimmed, italy ' s public debt, the world ' s third - biggest, could more than triple by 2050
1月,經濟合作與發展組織( oecd )稱義大利的退休金和醫保開支如不加以控制,等到2050年,義大利的國債? ?位居世界第三,將增加兩倍還多。The second part, which includes chapter 3 and 4, is designed to discuss the problem about geometric quantum computation : the study of the effective controlling and manipulating on the two - qubit conditional geometric quantum phase - shift gate and the realization of the two - qubit nonadiabatic conditional geometric quantum phase gate
第二部分包括第三章和第四章,這部分主要討論幾何量子計算問題:兩量子位條件幾何量子相移門的有效控制和操縱及兩量子位非絕熱條件幾何量子相位門的實現。Main frame system, hydraulic control system and electronic controller design method are presented in detail. in chapter 3, the precious mathematics model about electro - hydraulic proportional control system of material testing machine is proposed. the digital simulation and theoretical analysis of load control system, position control system and extension control system are discussed according to various load type
第三章給出了材料試驗機負載適應控制系統的數學模型,並針對不同的負載類型,對試驗力控制系統、位置控制系統及變形控制系統進行了詳細的理論分析及計算機模擬,並對理論分析和模擬結果作了討論和總結。Part iii points out the existing problems in domestic venture investment enterprises, namely : 1. venture capital being generally nationalized, governmental behaviors handling the venture investment market ; 2. small - scaled venture capital and tremendous shortages of capital ; 3. lacking authentic venture enterprises ; 4. outgoing system of venture investment not yet in shape ; 5. corresponding regulations and policy not in place, and insufficient govemment - backing. this part is the second key of the article, paving way for how to perfect the legal - controlling system of our venture investment in part iv
第三部分指出了國內風險投資業存在的5個問題,即: 1 、風險資本泛國有化,政府行為主導風險投資市場; 2 、風險資本規模小,資金缺口巨大; 3 、缺乏真正的風險企業; 4 、風險投資的退出機制尚未形成; 5 、配套法規政策不到位,政府扶持力度不夠.這部分是全文的次重點,為第四部分「如何完善我國風險投資業的法律調控機制」作鋪墊。By simulating mathematically on frequency and on space, we can find the average speed of space field and the average speed of frequency field that is weighted by amplitude, and analyse their relation, and analyse the meaning of space speed variance x and frequency speed variance v. in the fourth part, how to ensure the height of cloud is introduced, and basing on the theory of wind field continuity, the height updating quality controlling is introduced. in the fifth part, the system of cloud wind is introduced, we tracked cloud - motion of consecutive satellite images with one - minute interval by the 1 - d fourier analysis technique and the two - dim fourier analysis technique and the fft analysis technique, and dispose them with quality controlling. in the sixth part, we summarized our research and put up with shortages of this article
模擬模塊內各點的速度線性變化時,得到空間域平均速度以及頻率域以振幅為權重的平均速度,分析了空間域平均速度和頻率域以振幅為權重的平均速度的關系,並揭示空間域的平均速度的標準差_ x和頻率域的振幅為權重的平均速度的標準差_ v的意義,以及它們之間的關系;第四章介紹了雲跡風系統的高度指定以及風矢高度的劃分,並根據風場連續性原理,介紹了高度調整法的質量控制;第五章介紹導風系統的流程,選擇了三個時刻的ir雲圖,分別用一維傅立葉相位法、二維傅立葉相位法和快速傅立葉演算法計算一個風場個例,並對所得風場進行質量控制,並給出風場圖;第六章進行研究總結,指出不足和有待于進一步研究之處。Regard how to structure the control system of sensorless bldcm with dsp - tms320f240 as the centre in this paper, the detailed argumentation course of the motor startup, bemf terminal voltage measurement and control strategy is given out, give and pay concrete details for the software and hardware realization and experimental result. in order to treat the bldcm control system with dsp clearly, the full paper divides into six chapters altogether : chapter one, introduceing the development course, the structure characteristic and operation principle, etc. of bldcm in the introduction ; chapter two, directed against the startup issue of bldcm, the chapter give and publish the rotor measure pulse orients technology for motor startup in detail ; chapter three, proceed with mathematics model of the bldcm, expounding the control schemes ; chapter four, two important devices introducing : dsp ( 240 tms320f ) and power invertor control chip ( ir2131s ) ; chapter five, give and publish the detail of hardwares of control system ; chapter six, by ccs ide of ti, realize the control schemes in the front chapters with software, offere the procedure flow chart of main subroutine and some key place of programming, the experiment result in addition
全文共分六章:第一章、緒論中介紹了bldcm的發展歷程、電機本身的結構特點和工作原理等;第二章、針對五位置傳感器bldcm的起動問題,文中詳細給出了檢測脈沖轉子定位起動技術;第三章、從電機的數學模型入手,詳細論述了反電動勢端電壓法和系統的控制策略;第四章、介紹了硬體實現中的兩個重要器件: dsp ( tms320f240 )和功率管逆變器控制晶元( ir2131s ) ;第五章、詳細給出了控制系統的硬體實現細節;第六章、利用ti提供的ccs集成開發環境,將前面章節的控制方案用軟體加以實現,給出了主要部分的程序流程圖和一些編程要點以及實驗結果。The second part is a detector which is used to detect the distribution of voltage on the patient ' s brain surface from all different directions. the third is a mixed signal processor ( c8051f020 ) which is used to control the other parts of the system and display some necessary information and convert the voltage signals into digital signals, as well as transmit the acquired data to the computer. the fourth is computer with eit software which is used to analyze and process the received data and construct a picture for the brain edema and haematoma on screen
32通道電阻抗斷層成像系統由4個部分組成:第一部分是正弦波恆流源,用來產生注入大腦的激勵電流;第二部分是電位信號的提取與轉換,用來提取當激勵電流注入時,在大腦表面形成的電位分佈信號;第三部分是數據採集與控制系統,用來控制激勵電流的頻率,注入方向,注入強度,控制採集大腦表面的電位分佈信號,並且將這些採集的電位分佈數據傳到pc機;第四部分是計算機eit成像軟體,用來接收下位機的電位分佈數據,並且對這些數據進行分析計算,重建電阻抗圖像。The third part of this thesis extends beyond the algorithm proposed in the second part and considers the service quality offered to receivers behind bottleneck links. a new network - based dynamic proxy resource adjustment algorithm is proposed to solve this issue
本文第三部分在第二部分提出的基於網路tcp友好的分層組播速率控制機制基礎上,進一步考慮了位於瓶頸鏈路后的接收方的播放質量問題,提出一種新的基於網路動態緩沖調度的組播速率控制機制。The third part : a reservoir operation system is built up. it includes water level control model, discharge control model and generation model
第三部分,研究和建立了一個集發電調度模型、水位控制模型和流量控制模型於一體的水庫單庫調度模型集成系統。分享友人