等值線圖 的英文怎麼說

中文拼音 [děngzhíxiàn]
等值線圖 英文
ccontourplot
  • : Ⅰ量詞1 (等級) class; grade; rank 2 (種; 類) kind; sort; type Ⅱ形容詞(程度或數量上相同) equa...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : Ⅰ名詞1 (繪畫表現出的形象; 圖畫) picture; chart; drawing; map 2 (計劃) plan; scheme; attempt 3...
  • 等值 : equivalent; equivalence
  1. Contour map of charge density

    電荷密度等值線圖
  2. Through the analysis of the deduction process of harmonic function model, it is illustrated that some hypotheses in the deduction process are unreasonable and the harmonic function can not reflect the objective regularity of the vertical crust movement, so that it isnt an effective method to compile isoline map of the vertical crust movement rate

    對有關文獻提出的「地殼垂直運動調和分析」模型的建立過程作了全面分析,指出:該模型建立過程中所做的一些處理是不合理的,由此建立的模型不是地殼垂直運動規律的客觀反映,因而尚不足以成為編制地殼垂直運動速率面等值線圖的可靠手段。
  3. On the basis of the isograms, we analyzed the variation law of yield and grain protein content with soil water content, nitrogen and p2o5,

    等值線圖描述產量和蛋白質含量的水氮和氮磷兩因素效應,分析產量和蛋白質含量變化規律及其關系,確定實現一定生產目標的水肥管理方案。
  4. Study on the arithmetic of automatically drawing isoline of groundwater level based on gis

    的地下水水位等值線圖自動生成演算法研究
  5. However, it is still often to draw the thrust isoline graph manually during the data processing

    但是,在實際工作中,進行數據處理和制時,半手工繪制帶逆斷層的等值線圖的現象還普遍存在。
  6. The paper applies sdm in drawing the map of pollution areas. by synthesizing contaminated factor, saturated esdd and damp factor in pollution areas, the equal saturated esdd is presented. the isopleth map for equal saturated esdd is drawn by grid method based on kriging regression, and the isopleth map is regarded as the map of pollution areas

    通過將影響污區分佈的積污因素、鹽密指標、濕潤因素這三種因素綜合為效鹽密,運用克里金法實現效鹽密的插,最終通過網格法繪制等值線圖實現了電網污區分布計算機自動繪制。
  7. The paper presents several aspects in partition rectification and visualization of raster image. adopt technology of visualization for scientific calculation, vector diagram of deformation 、 contour chart of deformation and drawing of three - dimensional are realized. delaunay tin in view of deformation feature is constructed on base of selected grid control points and methods and mathematical models for partition rectification are realized based on the delaunay tin. software of geometric rectification for large scales are realized and applied in project

    本論文針對柵格影像的變形可視化及分塊糾正展開研究,取得了以下幾方面的研究成果:一、採用科學計算可視化技術,繪制變形矢量、變形等值線圖和三維效果,實現了柵格影像變形特徵的可視化;二、提出了在格網控制點( gcp )數據基礎上選擇性構造顧及變形特徵的delaunay三角網,並基於構造的三角網實現了分塊糾正的方法和數學模型;三、採用vc編制了影像幾何糾正軟體,實現大比例尺掃描地形的糾正,並在工程中得到應用。
  8. The thesis offers the idea of applying the techniques of data - administration, computer transaction, computer graphic and the interaction between computer and people in the emulational research of the construction of three - dimensional geological modeling, which also succeeds in realizing the protracting of the administration of geological data, the layout of industrial section, complex section chart, complicated isoline chart and the three - dimensional geological modeling chart, and in providing valuable references for geological research and technological support for three - dimensional and complex geological research

    論文提出了運用數據庫管理技術、計算機處理技術和計算機視技術與人機交互技術建立三維地質建模與模擬研究的基本技術思路較成功地實現了地質數據管理、工區布置、復雜剖面、復雜等值線圖和三維地質模型的顯示與繪制,為地質科學研究提供了有價的參考資料和三維復雜地學研究的技術支持環境。
  9. When catchment area, average channel gradient and catchment shape factor of designed culvert or bridge are known, a user can be convenient to get local parameters c, e and b from standard contour charts and easy to calculate flood flow just by a calculator. design period of flood flow is enormously shortened as well as a high precision. estimated flood flow through culvert or small bridge by new calculation model is generally less than by traditional methods, so that much cost is cut down a s reducing the span of culvert or small bridge

    以75000km ~ 2的川中丘陵地區為試點研究區,繪制了該地區新模型的參數等值線圖,率定了不同設計頻率的改正系數,使設計者只需在地形上獲取集水面積,河道平均坡降和流域形狀系數,在參數等值線圖上查得橋涵所在地的相應參數,使用計算器即可迅速計算出設計流量,大大縮短了設計周期,且精度較高,設計的洪水流量一般低於傳統方法,從而可減小橋涵跨徑,節省投資。
  10. Then, the chaser ' s two orbit roots are selected as variable and visualizing the simulation by contour plot. this part of research draws the conclusion the same as the first part when the target ' s orbit is circular orbit, while the selected two variable can be wildly changed if the target ' s orbit is elliptical orbit. next, wait time before orbit maneuver is simulated

    其次,利用可視化的等值線圖研究了追蹤器軌道兩個參數為變量的情況下大范圍軌道機動問題,分析表明對圓軌道目標器交會機動時,追蹤器軌道根數不宜與目標器軌道根數相差過大,而對橢圓軌道目標器交會機動時,追蹤器軌道根數可選范圍較大,機動策略和方法富於彈性。
  11. The research fruits in this article can provide the temperature isoline map of crown cantilever section and central longitudinal section of the dam, the stress isoline map of crown cantilever section and upstream and downstream surfaces of the dam, the maximal and minimal stress distribution map in dam abutment along with the height of dam, the maximal and minimal stress table of typical nodes and the maximal and minimal stress table in different elevations, and also provide reference basis for taking relative temperature control measures in the design and construction of rcc arch dam

    本文研究成果可給出壩體的拱冠梁剖面和壩體中心縱剖面的溫度等值線圖、拱冠梁剖面和壩體上下游面應力等值線圖、壩肩最大最小應力沿壩高的分佈曲、不同高程處典型點的最大最小應力表以及不同高程處最大最小應力成果,為碾壓混凝土拱壩的設計和施工中採取相應的溫控措施提供了參考依據。
  12. The basic parameters, such as temperature, pressure, turbulence kinetic energy and the turbulent kinetic energy dissipation rate, are also analyzed

    繪制了壓力和溫度曲,以及壓力、溫度、渦流動能、渦流動能擴散率等值線圖
  13. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍口水力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港洪水、計算時段的變化、多口門、多庫容、多水閘)的龍口水力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口水力要素最大等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口水力計算,為堵口合龍提供科學依據。
  14. We attempted to advance the certainty method based on the background value of earthquake ground motion ' s parameters, combined the probability seismic risk analysis and certainty seismic risk analysis to study the characteristics of earthquake ground motion ' s parameters in jianghuai region which is medium - strong earthquakes ' transition region, and protracted the calculating background values of earthquake ground motion ' s parameters to plane equivalence value maps and solid equivalence value maps

    摘要嘗試性地提出了基於地震動參數背景的確定性方法,將概率性地震危險性分析和確定性地震危險性分析相結合,對江淮地區這一中強震過渡區的地震動參數特徵進行了研究,並把地震動參數背景的計算結果繪製成平面等值線圖和立體
  15. According to differences of construction process, boundary condition, temperature and stress of two schemes extending 3m deep short seam on upstream face in the middle of rcc overflow section and no short seam are calculated, what " s more, in this paper the equivalent line drawing of stable temperature field and unstable temperature field during construction and operation period and the duration curve drawing of typical points " s temperature and stress are plotted, and the results of peak and minimum on temperature in every month and maximum on tensile stress are attained

    根據施工過程和邊界條件,對溢流壩段中間上游面增設3m深短縫和不設短縫兩個方案進行了溫度和應力計算,並繪制出穩定溫度場等值線圖及施工期、運行期非穩定溫度場等值線圖,典型點溫度和應力歷時曲,逐月最高、最低溫度和最大拉應力及相應位置成果。
  16. This thesis primarily makes below the work of a few aspects : ( 1 ) the method that measuring and solution of the control point ' s coordinate, calculation of the point, solution of intersection with polygons, and calculation the quantity of ore reserves in a drawing file by computer technology ; ( 2 ) the theory and the method to draw the diagram of the equivalent line by establishing the abnormal triangle net, and ore blending with the diagram of the equivalent degree ' s line ; ( 3 ) the principle and method to automatically divide the ore, and the method to adjust to the quantity of ore and search the ore ' s information ; ( 4 ) adoption the line program to beg to solve the problem to ore blending, and establish the linear programming model and the simplification model with ore blending. ( 5 ) establish the control model with ore degree based on modem control theories

    本論文主要完成了以下幾方面的工作: ( 1 )利用計算機技術直接在一張現狀中,實現了控制點的測量與求解、坐標展點計算、多邊形求交以及爆堆礦巖量的計算; ( 2 )提出了通過建立非規則三角網的方法來繪制等值線圖的理論和實現方法,通過品位指導配礦工作; ( 3 )提出了配礦塊段自動劃分的原理和方法,並在此基礎上實現礦塊礦量調整和礦塊信息查詢; ( 4 )採用性規劃的方法求解配礦問題,建立了配礦問題的性規劃模型和簡化模型; ( 5 )建立了基於現代控制理論的品位控制模型。
  17. The rainfall isoline smoothed by the tension spline function algorithm in the process of making rainfall isoline map of beijing pinggu district has much better effects

    在繪制北京市平谷地區雨量等值線圖過程中,應用張力樣條函數演算法光滑后的雨量等值線圖達到了很好的效果。
  18. The settlement isoline map, based on subsidence prediction in mining area, is difficult to be directly applied to land planning in mining area and mgis analysis due to its different data structure from digital terrain map

    摘要基於開采沉陷預計的採煤區下沉等值線圖不便於直觀地反映礦區地形的動態變化,其形數據結構與數字地形存在差異,難以直接用於規劃設計和礦區gis分析。
  19. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口水電站工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了拱冠梁剖面和壩體中心縱剖面準穩定溫度場等值線圖以及施工期、運行期拱冠梁剖面和壩體中心縱剖面非穩定溫度場等值線圖,提供了施工期逐月和運行期每年最高、最低溫度成果,分析了壩體溫度分佈規律以及高溫區形成的原因,並探討了預埋冷卻水管的效果和可行性以及預埋冷卻水管的區域。
  20. This paper combines the critical rainfall in the typical areas of yunnan province, and carries on the analysis to the critical rainfall situation, and carries on a research to the variety regulation of the critical rainfall of the mountain flood disasters in yunnan province by the application of spacial variogram theory, and the kringing of spacial gridding methods, the inverse distance to a power method, the radial basis function method, and then draws up each isoline maps

    採用空間變異理論,應用克里金空間插分析法、反距離加權插法、徑向基函數插法對雲南省山洪災害典型區的臨界雨量的情況進行對比分析,對其變化規律進行研究,並繪制相應等值線圖
分享友人