等滲失水 的英文怎麼說

中文拼音 [děngshènshīshuǐ]
等滲失水 英文
isotonic dehydration
  • : Ⅰ量詞1 (等級) class; grade; rank 2 (種; 類) kind; sort; type Ⅱ形容詞(程度或數量上相同) equa...
  • : 動詞(液體慢慢地透過或漏出) ooze; seep
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  1. There are many reasons such as the outburst of gas, penetrator, wrong operation, disabled monitor and malfunction from equipments etc. except man - made and outburst accidents, equipments malfunction takes great proportionment. therefore, a complete security and real - time monitor system of a coal mine based on large equipment is urgent to be development for high frequency of mine accidents

    近年來,我國煤礦安全事故頻頻發生,原因有瓦斯突出、透、非法操作、監控效和設備故障造成,除了人為和突發事件外,設備故障引起的事故也占不小的比例,因此建立完整的煤礦大型設備實時監測系統非常必要。
  2. The thickening may be synthetically aroused by many factors, because of the lower maturation of source rock at forepart, the rock tar is thicker, and then many other factors impel it, which include the hydrocarbon dissipation at the process of oil and gas migration, biodegradation and bathing oxidation induced by gravity induced centripetal flow recharged by meteoric water at the basin uplift period and etc

    稠油成藏則由多因素綜合作用造成,由於早期源巖成熟度較低,原油本身較稠,而油氣運移過程中輕質組分散、生物降解和盆地抬升剝蝕階段大氣所導致的洗氧化作用則使其進一步稠化。
  3. In the excavating process of the left bank, such methods as concrete embolism, consolidation grouting > cable strengthening and bailing shoud be used when the fault f5 is round. on the right bank, the system anchorage and bailing methods shoud be used. it is surgested that the prestressed cable shoud be used to deal with the deterministic blocks. and the prestressed anchor to the undeterministic blocks

    左岸拱肩槽邊坡在開挖施工至斷層f5附近時,要使用混凝土栓塞、固結灌漿、錨索加固及排措施以防止巖體穩。右岸拱肩槽邊坡開挖過程中要採取系統錨固及排措施,以防止個別潛在不穩定的邊坡穩。
  4. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體和庫區特大洪因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、透破壞、壩肩滑坡使壩體穩和洪漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  5. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體和庫區特大洪因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、透破壞、壩肩滑坡使壩體穩和洪漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  6. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下河谷巖體力學環境分析及右岸古滑坡體的穩定問題分析得出:建壩后河谷的巖體應力量值明顯增高,同時左岸的張應力區的范圍及量值明顯減小,主應力的方向依然與模型的底邊界垂直;大壩建成后逐漸蓄階段以及同時考慮本區最強地震力的作用各種不同的工況條件時,滑坡體及壩體總體上仍處于穩定狀態;位驟降時,在未考慮其他外力作用的情況時,滑體的安全系數將顯著降低。若考慮位驟降及本區最大地震力的共同作用,壩體將在滑坡體下滑推力的作用下產生破壞;建壩后平推力對右岸古滑坡體穩定性的影響分析可以看出,在最危險的工況條件下,壩體及滑坡體也將處于臨界狀態;在長期透變形的作用下,由於滑帶的物理力學參數的降低而有可能導致壩體穩破壞。
  7. R & d of high strength hpc with strength grade c50 - c80 was conducted using high belite cement ( abbreviated as hbc ) as the main component of cementitious material. the workability, physical mechanical properties, durability and sub - microstructure of hbc concrete have been researched systematically in comparison with hbc using ordinary portland cement ( abbreviated as opc )

    本研究以高貝利特泥( hbc )為主要膠凝材料,成功配製出了強度級為c50 c80的高貝利特泥高性能混凝土,該級別范圍內的高貝利特泥高性能混凝土初始坍落度180mm , 90min坍落度損40mm ,且抗凍級f300 ,抗級w25 ,氯離子透值1000庫侖。
  8. Pentax is not responsible for consequential damages caused by leakage resulting from inappropriate or careless handling of the case ? including but not limited to damage to items within the case ( camera, battery, sd memory card, etc. ) and incidental damage related to loss of recorded images and data or expenses related to lost images

    賓德公司對以下損概不負責:不當或大意操作防機殼引致的漏損害- -包括但不限於防機殼內部件(相機、電池、 sd存儲卡)的損害,以及圖像和數據丟造成的損害或圖像丟造成的費用損
  9. The river package of visual modflow code was used to understand the interaction between songhuajiang river and the nearby aquifer and the effect of riverbed conductance on river leakage. induced infiltration, reduced baseflow, river losing and river gaining are the main factors used to demonstrate these phenomena

    用modflow的河流程序包對松花江與附近含層以及河床沉積物透性的互聯系進行分析,並用誘發入、基流減少、河流和河流得4個主要因子來證明。
分享友人