等蒸發量線 的英文怎麼說

中文拼音 [děngzhēngliángxiàn]
等蒸發量線 英文
isothyme
  • : Ⅰ量詞1 (等級) class; grade; rank 2 (種; 類) kind; sort; type Ⅱ形容詞(程度或數量上相同) equa...
  • : Ⅰ動詞1. (蒸發) evaporate2. (利用水蒸氣的熱力使食物熟或熱) steam Ⅱ名詞[中醫] (將藥物隔水蒸熟) steaming
  • : 名詞(頭發) hair
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 蒸發 : [物理學] [化學] evaporation; evaporate蒸發計 evaporometer; evaporimeter; atmidometer; atmometer; ...
  1. To this area precipitation materials for many years, evaporate materials, surface flow materials, hydrometeorological materials, hydrogeological materials carry on exhaustive analysis, have analysed the state of water resource of the sand district, proceed from the heat of the earth ' s surface is balanced, water yield balanced basic theories, combine the amount of regional water resource set up of the materials, such as scene, hydrology, soil of the sand district, etc. and estimate models, have calculated the surface water, groundwater of this area, has carried on models to examine according to the real data, and has predicted to the state of water resource under different climate change scenes of future that analyse. have put forward the scheme that the water resource in this area utilized rationally, use the non - linear motive force model to predict the precipitation, utilize the materials of actual observation, the natural supply amount of calculating out groundwater of sand ground of balanced principle of the amount of water used at the same time, and can exploiting amount predict to groundwater, district of sand,

    本文以寧夏半乾旱地區鹽池縣沙地水資源為研究對象,對該地區多年降水資料、資料、徑流資料、水文氣象資料、水文地質資料進行了詳盡的分析,分析了沙區的水資源狀況,從地表熱平衡、水平衡的基本理論出,結合沙區的氣象、水文、土壤資料建立了區域水資源估算模型,計算了該地區的地表水、地下水,根據實際資料進行了模型檢驗,並對未來不同氣候變化情景下的水資源狀況進行了預測分析,提出了該地區水資源合理利用的方案,運用非性動力模型對降水進行預測,同時利用實際觀測資料,運用水平衡原理計算出沙地地下水的天然補給,並對沙區地下水可開采進行預測。
  2. The serious bursting accident of the main steam pipe was analyzed 3 by applying the research results above in chapter 4. the main steam pipe has serviced for 12 x 104h in the power plant. using scanning electron microscope ( sem ), x - ray diffraction, optical microscope ( om ), mechanical experiments, it is verified that the main reason causing the main steam pipe breaking down were the material and structural defects

    採用掃描電鏡技術、 x射衍射技術、金相觀察、機械性能測試技術手段和失效分析方法,以某火力電廠己服役12萬余小時的主汽管道為例,對其嚴重的爆斷事故進行了失效分析,確定了管道失效的主要原因是與管道焊接的閥體存在大的材質缺陷和結構缺陷。
分享友人