等高梁 的英文怎麼說

中文拼音 [děnggāoliáng]
等高梁 英文
beam of uniform depth
  • : Ⅰ量詞1 (等級) class; grade; rank 2 (種; 類) kind; sort; type Ⅱ形容詞(程度或數量上相同) equa...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • 高梁 : a surname
  1. Announce according to top people court " about hearing person damages case applicable law the explanation of a certain number of problems " regulation, road, bridge, channel wait for what build artificially to because safeguard, build thing, administrative flaw sends a person to damage ; pile up article boils fall, slide or pile up content collapse sends a person to damage ; arboreous dump, break off or fructification falls send what the person damages to perhaps manage a person to assume liability to pay compensation by everybody, but the exception that can prove oneself do not have fault

    根據最人民法院公布《關于審理人身損害賠償案件適用法律若干問題的解釋》規定,道路、橋、隧道人工建造的構築物因維護、治理瑕疵致人損害的;堆放物品滾落、滑落或者堆放物倒塌致人損害的;樹木傾倒、折斷或者果實墜落致人損害的由所有人或者治理人承擔賠償責任,但能夠證實自己沒有過錯的除外。
  2. Sxm11p straight line beveling machine is the latest develop new style of beveling machine from suntech. it specialty adopt beveling wheel, it can whole progress and can lifting intergrally, it compare to traditional front beam or back beam s lifting, it have more pithiness structure. more better stability, higher grinding precision s characteristic. at present this technique was apply country patent. this machine have high automatizationg, set the grinding paramenter into the interface of the human - machine, the machine can automatic to adjust, realize the glass fine grinding, polishing can be automatic processing in one time

    Sxm11p直線斜邊機是億海公司最新開發研製的新型直線斜邊機,它的特點是採用了斜邊磨頭,即可整體進給,又可整體升降的新技術,與傳統的前或後升降技術相比,具有結構更簡單,穩定性更好,磨削精度更的特點,目前該技術已申請國家專利,該機自動化程度,只要在人機界面上設定有關的磨削參數,機器便可自動進行調整,實現對玻璃精磨拋光的一次性自動加工。
  3. After that, through discussion about the landscape estimate criterion, the author summarizes it as follows : aspect relation and meaning. then, based on the landscape features of the urban viaduct rail transit along the no. 1 subway in hangzhou, the authors analyzes and summarizes the challenges that we must affront to and comment on the aspect of the styles and colors of the viaduct. at last, from a combined view with city planning, the author puts forward some advice about the improvement on the sculpt and colorific aspects of viaduct

    論文首先分析了架軌道交通的景觀特點和空間組合模式;通過討論景觀評價的標準,將景觀評價標準總結為外顯、關系、內涵三個方面;然後結合杭州市地鐵一號線工程,從外顯、關系、內涵三個方面分析架軌道交通可能產生的景觀影響問題;最後結合城市設計的角度,對橋的造型和色彩方面提出部分改進意見。
  4. It is the key of ebfs, therefore, furthermore calculation about link are carried out in this thesis, introduced achieved research, summarized the affect of link on whole capability in the first, the second, numerical calculation are proceeded on link with ansys : with the purpose of discussing yielding mode critical length of link, established five different specimens ; with the purpose of discussing the influence of h / tw of web, b / tf of flange and h / b, established eighteen different specimens ; with the purpose of discussing the affect of stiffener, established four different specimens, and elaborated the affect of stiffener on link based on achieved test researches

    因此,本文對耗能段進行進一步計算分析,概述耗能段對整體性能的影響,並利用有限元程序ansys對耗能段進行數值計算:針對耗能段的屈服類型建立5種不同長度的模型,計算討論耗能段屈服類型的長度劃分;針對耗能段腹板厚比、翼緣寬厚比以及段截面形狀因素共建立了18種模型進行計算分析;針對加勁肋對耗能段的作用建立了4種模型,並結合已有的試驗闡述了加勁肋對耗能段的影響。
  5. On the base of codes in 1989, a series of seismic measures are improved in new codes, such as limit of inner - storey drift angle, minimum reinforced rate, column - beam moment magnification coefficient and moment magnification factor at the column base, etc

    在89規范的基礎上,本次規范修訂進一步提了包括層間位移角限值、最小配筋率、柱一級差系數在內的一系列抗震設計措施。
  6. This drilling adopts crank connecting link and walking beam percussion mechanism, which make the drilling possess two percussive functions, normal drilling takes connecting link impact as main mode, when encountering special situation and the connecting link impact can not drill, it can transform into hoisting impact, the stroke length can be modulated, it realizes automatic percussive drilling due to continuous operating of connecting link percussive mechanism, these can enhance drilling efficiency and relieve labor intensity ; it adopts pumping reverse circulation to drain slag, which not only resolves the drilling difficulty in special stratum such as pebble and gravel stratum and hard stratum, but also resolves the problem that the percussive drill ' s efficiency is low ; it adopts spur gear differential mechanism as double cylinders lazy tongs of main hoist, which not only ensures the balance state of drilling tool, but also reduces the mechanical design, and reduces the cost ; the bottom plate traveling motion of this drilling machine adopts walking type ; the drilling tower adopts hydraulic pressure uprising, and reduces the assistant operating time

    該鉆機採用曲柄連桿、游式沖擊機構,使鉆機具有兩種沖擊功能;正常鉆進以連桿沖擊為主,遇到特殊情況,用連桿沖擊不能鉆進時,可轉為卷揚沖擊,沖程可調,因連桿沖擊機構連續工作,所以實現了自動沖擊鉆進,可提鉆進效率,減輕勞動強度;採用泵吸反循環的方式排渣,既能有效解決卵礫石地層、堅硬地層特殊地層鉆進的困難,又很好地解決了沖擊鉆機效率低下的問題;採用直齒圓柱齒輪差速機構作為主卷揚的雙筒同步機構,既保證了鉆具處于平衡狀態,又大大簡化了該機構設計,降低了成本;該鉆機底盤行走移位採用步履式;鉆塔採用液壓起立,減少了輔助作業時間。
  7. B87c breaker is a pneumatic instrument manufactured with the mature technology of america gardener denver corporation. it is more powerful in breaking ferroconcrete, rocks and asphalt. boasting greater efficiency and durability, it suits the requirements of breaking outsized, super - thick and hard objects. it is ideal machinery for the substructural construction of mines, bridges, roads and civil infrastructure

    B87c破碎機採用美國迦納德?丹佛氣動集團公司成熟技術,是以壓縮空氣為動力的破碎工具,能效完成鋼筋混凝土、巖石、瀝青破碎工作,具有馬力更大、效率更、壽命更長特點,特別適宜對特大、特厚、特堅硬物體的破碎作業,是礦山、橋、道路、市政建設基礎工程施工的理想工具。
  8. Paragraph of time, the physical - training teacher educating a branch to organize implement new class bid to middle and primary school reforming condition making an investigation, indicate on inquiry in the front, scale is small since a little school running a school, a little rural area elementary school, does not move space especially, be not enough to pay attention to waiting a minute or to physical training, do not have very good according to that new class switches over to demand to open enough physical education, since entering the higher school the system restraint, a little school defies student sports activities and good health, physical education birthplace having some of higher class with the method of work " resorting to fraudulence ", go ahead culture class within outside row physical education, at present major middle and primary school stadium field layout, equipment and material facilities are obsolete, short - supplied, foundation has no way to ensure that regular sports of school is flexible carrying out, is difficult to say material request adapting to new class more

    前段時間,教育部門組織體育教師對中小學實施新課標改革情況進行調查,調查表明,一些學校由於辦學規模小,特別是一些農村小學,沒有運動場地,或者對體育鍛煉不夠重視,沒有很好地按照新課改要求開足體育課,由於升學制度的制約,一些學校無視學生體育活動和身體健康,有些年級的體育課貫用「偷換柱」的做法,外排體育課,內上文化課,目前多數中小學體育場地布局、器材設施陳舊、緊缺,根本無法保證學校正常的體育活動的開展,更難以說適應新課材的要求。
  9. Those of multi - span, middle - length ( about 25 - 40 metres ) are of large percentage among advanced bridges. simply - supported girder bridges with continuous decks are inferior to those of continuous girders because their decks crack easily. owing to the complex construction of continuous girder bridges, which is laboursome and time - consuming, people have been thinking about an approach to combining the advantages of the two so as to speed up the building and reduce the work procedures

    級公路橋中,多孔中跨徑(跨徑在25 40米左右)的橋占很大的比重,橋面連續的簡支結構體系由於存在橋面容易開裂缺點而在與連續結構體系的競爭中常常處于下風。
  10. As the commonly used foundations in the bridge engineering, large - diameter bored piles have many advantages, such as high bearing capacity, good stability, little and homogeneous vertical settlement, facility for mechanician construction and good applicability

    樁基礎是一種常用的橋基礎型式,具有承載力、穩定性好、沉降量小而均勻、便於機械化施工及適用性強特點。
  11. Abstract : the paper probed the analysis on the adding mode of perpendicular load in multistorey building structures, the bending moment of frame side beams and the top, the bending moment of secondary beams, the difference between the tie - beam, plane - frame analysis and the space analysis on the path of conduct force, ect. it can be used as a reference when probing these problems

    文摘:討論了在多項層建築結構分析中垂直荷載加載模式的選擇,框架邊和次端部的彎矩計算,連問題和平面框架分析與空間分析在傳力路徑上的差別以及單片剪力墻平面外彎矩問題,可供同類結構內力分析時參考
  12. Dr anita leung fung yee, maria, ceo of the group, said : " we are set to provide funding of up to hk 100 million for the production of three mega tv drama series : my home is in beijing, the passenger liner sunrise and angel of the road, each being around 40 episodes. such investments are expected to be disbursed between the fourth quarter of 2006 and the first quarter of 2007, with a view to enhancing both the quality and volume of the group s tv drama productions in mainland china.

    勤緣行政總裁鳳儀博士表示,針對國內電視劇市場速發展,集團不斷銳意提其策劃及製作劇集之品質及數量,並計劃於二零零六年第四季至零七年首季為三部每套約40集之巨型電視劇,分別為家在北京抱擁朝陽號及馬路上的天使提供策劃服務,製作費合共約一億港元。
  13. Presently it is widely used in ship building, bridges, high - rise building etc steel structure welding

    目前已廣泛應用在造船業、橋層建築鋼結構的焊接中。
  14. Based on extensive investigation of construction technique history of chinese ancient buildings, the structure method, structure developing history and seismic behavior of chinese ancient timber structure buildings are analyzed in several respects of the structural system and form. through a series of experiments on constituent parts of chinese ancient timber building structure, including the tests on the corbels and brackets called dougong subjected to low cyclic reversed loadings, the tests on the wooden frame using the tenon - mortise joints as connections of column and beam subjected to low cyclic reversed loadings, the tests on vibration isolation effect of friction and slippage between column footing and their socle base, and a series of shaking table tests on a chinese ancient timber structure palace building mode under artificial earthquake at serving conditions, destroyed conditions and reinforced conditions, many valuable results of structures such as moment - curvature hysteretic loops of dougong structure and tenon - mortise joints under low cyckc reversed loadings, the static function, the seismic performance, energy dissipation, vibration reduction, energy - loss mechanism, nechanicalmode and failure mode were studied. aplenty of valuable parameters of the structure system were obtained, such as the natural period of structure, vibration modes, damping ratio, factor of vibration isolation, oscillate amplitude of ineitial accebration, velocity and displacement, magnitude of slippage, and the mechanism of structure failure and collapse etc. based on these research, the complete analysis of ancient timber structure under earthquake were carried out in which including mechanism analysis method, calculating mode, strength analysis of members and joints, strengthening methods for serving damaged ancient timber structure buildings were also taken into account

    依照宋代《營造法式》建造了抬式殿堂木結構構件及結構模型,對中國古代木結構中的典型構造如:柱腳在礎石頂面平擱簡支、柱架榫卯連接、柱不越間之廣、側腳、生起、斗拱的構造機理及結構功能進行了量化分析和實驗研究: (一)通過木柱石礎靜摩擦試驗,測定了柱腳與石礎古鏡面間的摩擦系數及摩擦力隨上部結構荷載變化的規律; (二)通過單柱承載力試驗,測定了古建築中木柱的受力變形特徵、破壞模式、及模型材料的變形模量、極限承載力、極限變形參量; (三)通過柱架低周反復荷載試驗,測定了柱架的抗側移剛度、柱架恢復力特性及滯回曲線、榫卯張角剛度及其變化規律、柱架及榫卯的極限承載力和極限變形、及榫卯減振參數; (四)通過斗?低周反復荷載試驗和受壓試驗,測定了古建築木構件與木構件間摩擦系數,斗?抗側移剛度,斗?恢復力特性及滯回曲線,斗?抗壓極限承載力及受力變形規律; (五)通過抬式殿堂間架模型振動臺試驗,測定了殿堂木構架結構自振周期,地震反應振形、阻尼特性及阻尼比;按結構分層特點對柱腳、柱頭和斗?層上的屋蓋的地震反應採用多點同步測量,對柱根滑移、榫卯變形、斗?的變形、復位、耗能減振參數進行了定量分析。
  15. With the improvement of loading grade and extension of service year, the structural disease in bridge increases continuously. as a result, the loading capacity of bridge degrades gradually and the function of service deteriorates year by year

    隨著交通荷載級的不斷提,橋服役年限的不斷延長,橋結構的病害不斷增多,橋結構的承載力不斷降低,使用性能逐年惡化。
  16. In this paper, a high performance sma system applied to steel bridge deck is put forth in allusion to the pavement project of the wuhan junshan yangtze river highway bridge. it comprises steel slab, zn coating layer, closing layer, adhesive, pre - mixed asphalt stone and dual layer sma from bottom to top. it is based on the fea results of the forces and deformation of the pavement layer by means of the algor feas, according to this bridge ' s traffic and the ambient temperature varying range of the pavement layer

    本文針對武漢軍山長江公路大橋鋼箱橋面鋪裝工程,從鋪裝層環境溫度變化范圍、交通量使用條件出發,在用algorfeas有限元分析軟體分析鋪裝層受力變形基礎上,提出了(即鋼板+金屬鋅塗層+封閉層+粘接劑+預拌瀝青碎石+雙層sma )的性能鋼橋面sma鋪裝體系,並對這種sma的組成材料,包括改性瀝青、集料、礦粉、纖維進行了比較研究,設計了這種sma的配合比,對sma混合料的性能進行了對比試驗,對這種sma方案進行了疲勞性能研究,驗證了所選擇sma方案的可行性。
  17. The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio

    基於上述分析,本次試驗通過五個外包鋼混凝土邊節點1 4比例模型的偽靜力試驗,以柱的軸壓比、角鋼布置形式、配箍率為主要參數,分析外包鋼混凝土現澆框架一般層邊節點在中軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點的抗剪機理、破壞模式、變形能力、承載能力和角鋼錨固的可靠性;分析了頂層邊節點在張開彎矩作用下的工作性能、破壞模式和抗剪承載力;分析了試驗節點的滯回性能和耗能能力。
  18. Secondly, many crop water parameters, including eta, wue and water sensitive parameters etc., were studied through onsite experiment, typical household survey and other methods. by analyzing crop water usage characteristics, we concluded : 1. about eta : the amout of pear water consumption was highest ( 750. 2mm ), however, the watermelon planted in greenhouse consumed only 266. 5mm ; 2

    通過對大田作物需水量與自然降水量的平衡分析,可以將順義區主要大田作物分為三類: 1 )灌溉需求量較大的作物,包括水稻、冬小麥、苜蓿、棉花; 2 )灌溉需求量較小的作物,包括夏播作物(夏玉米、夏花生、夏大豆)和耐旱、避旱作物(、穀子) ; 3 )中間型作物,包括大部分春播作物(春玉米、春花生、春大豆) 。
  19. The device can be widely applied to the electric power, architecture, ship - building communications, chemicals building industry, and bridge construction, where high altitude work is necessary

    本品可廣泛應用於電力建築船舶通訊制藥橋處作業場所。
  20. But several earthquake has proved than it is of poor ductility and is brittle destroyed easily. but semi - rigid connections, which is formed by high strength bolts and connecting components, for example angle, end - plate and shape t steel, have an excellent energy dissipating mechanism to resist earthquake loads and prove more capacity for yielding and ductility

    而主要通過強螺栓與連接件(角鋼、端板以及t型鋼)把與柱連接起來的半剛性節點連接具有較強的耗能能力去抵抗一部分地震荷載,它能提供更多的屈服容量和延性容量,同時可節省節點的用鋼量,這使得半剛性連接成為一種既經濟又可靠的連接方式。
分享友人