管架零部件 的英文怎麼說

中文拼音 [guǎnjiàlíngjiàn]
管架零部件 英文
attachment of support
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • : Ⅰ數詞1 (零數) zero2 (數的空位) zero sign (0); nought 3 (表示沒有數量;無) nil; nought 4 (...
  • : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
  • : Ⅰ量詞(用於個體事物) piece; article; item Ⅱ名詞1. (指可以一一計算的事物) 2. (文件) letter; correspondence; paper; document
  • 管架 : pipe frame; pipe support
  • 零部件 : components and parts; accessories and repairs; machine replacement parts; parts
  1. Pump touch with the liquid part is the fluorine plastics, but crust is metal stuff, so the pumpbody is enough to support the weight of pipepad and repel mechanically concussion. imd multilevel magnetic force pumps is electrical engine direct link pattern, by centernog prop up, teardown and maintenance is convenient, the structure is tightly, safety and economize energy, one man can put up check - fixing the part inside and replace it easily, consumedly convenient the usual maintain of customers work

    泵接觸液體分是氟塑料,但外殼是金屬材料,故泵體足以承受道的重量及抵受機械性沖擊。 imd系列磁力泵為電機直聯式,由中間支支撐,安裝拆卸方便,結構緊湊安全節能,一人便可以輕松的進行內檢修和更換,大大方便了用戶日常的維護保養工作。
  2. Chapter two and chapter three analyze the requirements of different types of enterprises, including mass production, middle and small batch production, single production. based on this, the main function frame of master production scheduling and job shop scheduling is established. four methods of drawing master production scheduling and four modes of formulating job shop scheduling are proposed, and most of them are discussed in details at aspects such as theory, realization and data store, etc. not only is it important for master production scheduling and job shop scheduling to support different types of enterprises, but also for other support functions

    第二章通過對不同類型企業(包括大量生產、多品種中小批量生產、單小批生產)的主生產計劃編制方式和功能的需求分析,提出了能夠適應多種生產類型企業需求的主生產計劃理子系統的總體功能框,重點研究了分別適應不同生產類型企業需求的固定周期計劃、滾動計劃、預投計劃、投產計劃等四種主生產計劃編制方式,並實現了數據庫的設計。
  3. Due to the " order oriented " producing mode of swa, this article emphasizes on the importance of contract management and advances the concept of contract tracing management and " pull management " mode centralized on contract ; advances the centralized stock management mode and the manage method of modern solid stock aiming at the decentralized and disordered status of stock management in swa ; uniform code is the precondition of centralized material management, so this article studies the coding techniques of products and parts and provides the coding system structure of materials in swa, which will be the guidance of further coding work, quality is the life of enterprise, this article takes the product line of board - strip - foil of swa as example and brings forward the implementation scheme of producing process monitor and control in swa along with the key techniques of the implementation

    針對西南鋁"面向定單"的生產模式,強調了合同理的重要性,提出了合同追蹤理和以合同為核心的拉式理模式;針對西南鋁庫存理分散、混亂的現狀,提出了集中式庫存理的模式及現代化立體倉庫理方法;要實現物資的集中理,統一的編碼是前提,本文在探討產品及編碼技術的基礎上提出了西南鋁物資編碼系統的框結構,對下一步實施物資具體編碼具有指導意義;質量是企業的生命,本文以板帶箔生產線監控系統為例提出了生產過程監控在西南鋁實施的方案並討論了實施中的關鍵技術。
分享友人