管道渡槽 的英文怎麼說

中文拼音 [guǎndàocáo]
管道渡槽 英文
pipe aqueduct
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ動詞1 (由此岸到彼岸;通過) cross (a river the sea etc ) 2 (渡過) tide over; pull through 3 ...
  • : 名詞1 (盛牲口飼料或飲料等液體的器具) trough; manger (for water animal feed wine vat) 2 (兩邊...
  • 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
  1. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通后布置非常緊湊,急轉角度大且轉彎距離較小,對于內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通設計提供依據。
  2. For example, when the design flow of upward of the peace bridge of upward of the east - one main canal is 45m3 / s, the actual flow quantity is 23. 8m3 / s on the 30th of september in 1989, the water level of the transition region terminal of the mouth of hao wan flume of the east - one main canal had gained the design level of 4. 3m, and the level between downstream and shang tian yuan tunnel was generally higher. it says that the actual discharge capacity now is only about 24m3 / s which is half of the design value. this not only make the benefit of the irrigation district abnormal, but also greatly hinder the economic development of the irrigation district, and lead to the canal run frequently at small flow, high water level, lengthen the discharge duration

    如東一乾渠上段太平橋以上設計流量45m ~ 3 s , 1989年9月30日實測通水流量23 . 8m ~ 3 s時,東一乾渠郝灣出口漸變段末端水位已達到設計水位4 . 3m ,其下游至上天院隧洞水位也普遍偏高,即東一乾渠上段目前僅能通過流量24m ~ 3 s左右,只有設計值的50左右,不僅使灌區效益得不到正常發揮,嚴重阻礙了灌區范圍內的經濟發展,而且使渠經常處于小流量、高水位運行,延長了次通水時間,大大增加了渠工程的安全理難度。
  3. The most significant problem which has not been addressed by the increased use of automated systems is that of contaminated rinse water derived from either the internal pipework of the washer - disinfector or mains water, as well as intermediate tanks and poorly maintained filters

    隨著自動化系統增長使用,尚未提及的最重大問題是被污染的漂洗用水,其起源要麼來自清洗消毒器的內部復雜,要麼來自總水,以及來自中間過和維護低劣的過濾器。
分享友人