管道溝 的英文怎麼說

中文拼音 [guǎndàogōu]
管道溝 英文
dump trench
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 名詞1 (挖掘的水道或工事) channel; ditch; gutter; trench 2 (淺槽;似溝的窪處) groove; rut; furr...
  • 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
  1. This paper analyzes the groundwater discharging course using fluidics theory and combining quay structure construction ; sets up the method of fast drainage by the dint of pipeline and blind ditch of fragment stone ; and gives the computational mathematical model for quay drainage and calculation formula for drainage process according to the principle of conservation of mass and underground percolation, which have been applied for quay ' s stability design and calculation

    應用流體力學理論結合碼頭結構建設,分析了地下水排泄過程,藉助和碎塊石盲建立了港口碼頭快速排水與擋墻基床排水的方法;運用質量守恆定律和地下水滲流原理,建立了港口碼頭排水計算數學模型和排水過程計算公式,並用在了碼頭的穩定設計計算中。
  2. And results are : ( 1 ) analyze the force and distortion on pipeline under collapse and gulch in theory. on the base of beam deformation, analyze the bending moment and deformation of pipeline with frusta and without frusta. calculate a true problem, contrast the differences between pipeline with frusta and one without frusta, draw some conclusions

    得到的主要結果為: ( 1 )基於彈性地基理論和彈性梁的撓曲線理論,給出了在固定墩(相當跨越河情況)和無固定墩(相當坍塌和沖情況)的變形微分方程,並分析了當量軸力為拉力或壓力時的變形和受力情況。
  3. Standard specification for storm drain resilient connectors between reinforced concrete storm sewer structures, pipes, and laterals

    加筋混凝土暴雨排水設施和橫向排水間的排水回彈性連接件的標準規范
  4. Standard specification for storm drain resilient connectors between reinforced concrete storm sewer structures, pipes, and laterals metric

    加筋混凝土排暴雨污水結構和橫向排水間的暴雨排水彈性連接件標準規范
  5. Is student union the communication channel between school with students

    自治團體是學校與學生間的
  6. According to the situations of flood hazards to jingbian - yanshuiguang pipeline, one of the pipeline section of west - to - east gas transmission pipeline, this paper analyzes the cause of flood hazards to this pipeline section and puts forward relative solutions

    摘要結合西氣東輸靖邊延水關段汛期水毀的現場實際,分析了汛期間雨水沖、落水洞和局部塌陷等現象出現的原因,闡明了由此引起的對安全的影響和危害,並提出了相應的預防和防治措施。
  7. Class 1 - residential / light commercial snow melt : recommended for residential and light commercial walkways, driveways, entrances, and other light traffic ways, ramps and building entries

    冰雪融化系統實際上可安裝在任何地方,如停車場、車、裝卸區、橋梁、人行、戶外階梯、檐槽、屋面天、屋頂、下水,大約地表5厘米下的混凝土中。
  8. It link up to good at, is it make pieces of expansive speech house to mean while being what is called, the remarkable leader is clear, it must be a reciprocal two - way channel to communicate, could get the result of communicating

    所謂善於通,並不是指做個滔滔不絕的演說家,卓越的領導者明白:通必須是條有來有往的雙向,才能達到通的效果。
  9. To the inferior trap of rock - bottom building, ought to want special attention the following problem : ( 1 ) notice indoor moistureproof design, the ground outside basically observing indoor ground is compared wants tall how many, moistureproof measure how, judge thereby, the building fights damp ability, whether to live aptly ; ( 2 ) notice indoor facilities is designed, conduit of indoor fluctuation catchment is reasonable, observe whether conduit distribution is equitable, expedite, jam not easily ; ( 3 ) notice the establishment outdoor is designed, whether is the system such as room of the raceway groove outside be like, cesspool, water pump, catchment designed reasonable, accessary establishment leaves living room whether too close, this basically is to prevent to be all round the building generation seeper, especially after big rainstorm, be like catchment not free, the excessive outside possible sewage, by water adj / lit wide

    對于底層房屋的劣質陷阱,應當要非凡注重以下問題: ( 1 )注重室內地面防潮設計,主要觀察室內地面比外地面要高多少,防潮措施如何,從而判定,房屋抗潮濕的能力,是否適宜居住; ( 2 )注重室內設施設計,室內上下排水是否合理,觀察布局是否合理,是否暢通,不易堵塞; ( 3 )注重室外設施設計,如外、化糞池、水泵房、排水等系統是否設計合理,附屬設施離居住房是否太近,這主要是為了防止在房屋四周產生積水,非凡是大暴雨後,如排水不暢,有可能臟水外溢,被水淹。
  10. The relief valve should never be solidly piped into a drainage ditch, sewer or sump

    安全閥絕不能用堅硬的連接到排水、排水或污水坑裡。
  11. A study on local legislation for village autonomy in beijing

    明代北京街渠的
  12. West pipeline crossing heihe river is the longest crossing project by a large excavation way and the method of laying both crude oil pipeline and products pipeline in a single trench

    摘要黑河是西部工程採用大開挖方式穿越的距離最長的河流,原油與成品油採用同敷設方式穿越該河流。
  13. The main contents are as follows : firstly, the distinguishing feature of earth pressure in different lying way and the main calculation methods of the vertical earth pressure are analyzed and compared, the defect and applying limitation of earth calculation formula are pointed out. based on the elastic theory, formula to calculate vertical earth pressure on general trenching conduit is derived

    其主要內容包括以下幾個方面: 1 、對不同敷設方式的地下埋的受力特點進行了分析,在此基礎上,介紹了上埋式垂直土壓力的幾種主要計算公式,指出了各種公式的局限性及其適用范圍,並以彈性理論為基礎推導了一般埋式垂直土壓力的近似計算公式。
  14. This paper depicts the engineering outline of the pipeline crossing project as well as a series of new construction methods such as integral pipeline prefabrication, trenching layer by layer, integral lowering pipeline into trench and integral pressure testing, which speed up the construction progress and reduce the construction cost

    文章介紹了穿越段的工程概況以及整體預制、分層開挖、整體下和整體試壓等一系列新的施工方法,該方法加快了施工進度,節約了施工費用。
  15. Based on ductile grooved couplings and fittings produce experience of many years, we developed " mech " brand ductile iron grooved couplings and fittings, which completely adopt advanced produce equipment, technology and craft in the whole process of mould manufacture, chemical composition analysis, product machining printing

    我公司依託多年路連接件生產經驗開發的邁克牌球鐵連接件,從模具製作化學成分檢驗和產品的機加工到噴塗的全過程,完全採用國內外先進的生產設備技術和工藝保證產品質量,並相繼獲得了美國ul fm和中國權威檢驗機構的檢測證書。
  16. In order to assure the effective implementation of nppe ' s prompting system, the dissertation discussed the problems which should be adverted, idiographic measures and suggestions in case to ensuring the effective implementation of prompting system for the company from four aspects which is actualization of effect examination, establishment of canonical prompting system, rigorousness of execution, attention of communication and propaganda

    為了保證東北工程有限公司激勵機制的有效實施,從績效考核實施、規范激勵制度建設、狠抓落實工作、注重通宣傳等四個方面分析了保證該公司激勵機制有效實施應注意的問題和具體的措施和建議。
  17. The principal pipe or conduit in a system for conveying water, gas, oil, or other utility

    主要輸送水、天然氣、石油系統中的主要渠或其他公用事業設備
  18. If the space and environment allowed, extend the roll pipe and put it into the trench after completely digging the trench between two manholes

    布放時,若空間允許可待挖至適當長度時,再依手孔與手孔間之段長一次拖位置放于
  19. If it is really necessary to stuff or block up or demolish them, consent should be obtained from the water conservancy administrative department and the case be reported to the people ' s government of the city for approval

    城市建設不得擅自填堵原有河叉、貯水湖塘窪淀和廢除原有防洪圍堤;確需填堵或者廢除的,應當經水行政主部門審查同意,並報城市人民政府批準。
  20. In " case study ", the author applies theories on management communication, organizational behavior, human resources management, economics, management, management psychology and so on, to analyze the importance of management communication according to the relationship of management communication and organizational operation efficiency. the factors affecting the organizational operation efficiency and the barriers on management communication are discussed in detail. formal communication and informal communication, the characteristics of communication channels are also analyzed, the effective communication solutions based on the special people are put forward, including forming the good atmosphere for communication, building up the trustful relationship, selecting the right communication ways and channels, etc., which can improve not only the people ' s job satisfaction, the efficiency of the people, but the efficiency of the organization as well and achieve the goal of organization more effectually

    案例分析部分,根據案例提供的素材和相關的資料,運用了通、組織行為學、人力資源理、經濟學、理學、理心理學理論等知識從通與組織運作效率的關系來分析組織通的重要作用,探討影響組織運作效率的因素及有關通存在的障礙,分析了正式通與非正式通,各種通方式的特點,並根據特定的通人群的特點,提出了有效通的方法和對策,包括創造良好的通氛圍,建立相互信任的友好關系,選擇正確的通方式和渠等,提高員工工作的滿意度,提高員工工作效率,進而提高組織運作效率,更有效地實現組織目標。
分享友人