管道滲漏 的英文怎麼說

中文拼音 [guǎndàoshènlóu]
管道滲漏 英文
pipe leakage
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 動詞(液體慢慢地透過或漏出) ooze; seep
  • : Ⅰ動詞1 (從孔或縫中滴下、透出或掉出) leak; drip 2 (泄漏) divulge; disclose; leak 3 (遺漏) le...
  • 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
  • 滲漏 : percolation; seepage; leakage
  1. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防水工程、有防水要求的衛生間、房間和外墻面的防,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣線、給排水、設備安裝為2年; 5 、裝修工程為2年。
  2. Make sure drains and pipes do not leak or arent blocked. do not alter them without prior authorization. repair immediately if there is a defect in the trap or smell of foul air is coming from drain outlets

    確保排水口及喉沒有或阻塞未經批準,切勿擅自將渠如隔氣彎有損毀,或排水口發出臭味,應立即維修。
  3. Test methods for leakage detection in pipeline and tank

    儲罐檢測方法
  4. In the simulation of close water test, varied profiles of velocity of flow are obtained at different leakage location along the detected pipe, the variety values of the water level in the check well are acquired with time, consequently the location of the leakage can be judged

    在閉水試驗時,通過模擬沿長度方向上不同水點的流速的變化,以及得出窨井出口處的水位隨時間的變化值,來判斷段中最有可能出現點的位置。
  5. Make sure drains and pipes do not leak or aren t blocked

    保持渠暢通及沒有,切勿擅自將渠
  6. Make sure drains and pipes are free from blockage and leakage. do not alter them without prior authorization

    保持渠暢通及沒有,切勿擅自將渠
  7. Make sure drains and pipes do not leak or aren t blocked. do not alter them without prior authorization. repair immediately if there is a defect in the trap or smell of foul air is coming from drain outlets

    確保排水口及喉沒有或阻塞未經批準,切勿擅自將渠如隔氣彎有損毀,或排水口發出臭味,應立即維修。
  8. As the underground drainage facilities are ageing gradually, whether the government has plans to replace or renovate the drains to prevent accidents caused by pipe leakage or burst, which endanger the safety of the public ; and

    鑒于本港地下排水設施日漸老化,政府有沒有計劃更換或翻新該等,以預防因管道滲漏或爆裂而造成意外,危害市民安全及
  9. To avoid the pollution of groundwater resource and adjacent environment caused by drainage pipe leakage, current criterion in our country stipulates that there must be a pressurization test before drainage pipes are used

    為防止污水管道滲漏而導致污水外污染地下水資源和周邊的環境,我國現行的規范規定,無壓在竣工交付使用之前必須進行的嚴密性試驗。
  10. The system differentiates between background losses at joints and fittings and larger scale bursts, and enables operators to quickly localize leaks, deploy maintenance teams, track maintenance status, and access essential zone criteria and data by remote

    該系統可以區分在連接處的和更大規模的爆裂之間的損失,使得操作員迅速定位地點,組成維修隊,跟蹤維修情況,以及遠程訪問基本的地域標準和數據。
  11. The solution is based on abb ' s award - winning system 800xa automation platform and includes the wlms and power generation information management ( pgim ) software, the expansion of an existing abb scada system with 800xa and ac800m controllers, magmaster electromagnetic flow meters, and ctu800 - cpe remote terminal units

    該系統可以區分在連接處的和更大規模的爆裂之間的損失,使得操作員迅速定位地點,組成維修隊,跟蹤維修情況,以及遠程訪問基本的地域標準和數據。
  12. Overflow and seepage from septic tanks and soakaways in unsewered villages, though not such a major problem on lantau as in other parts of hong kong, still contributed to river water pollution

    在大嶼山有些無污水的鄉村存在化糞池及溢流和的問題,雖然污染程度不及香港其他地區嚴重,但也會影響河溪水質。
  13. Plastic piping systems - systems for hot and cold water - test method for leaktightness under vacuum

    塑料系統.熱水和冷水系統.真空性試驗方法
  14. In this paper, hydromechanical theories, three - dimensional unsteady turbulent finite volume model and pheonics software are adopted to simulate the pressure field and the velocity field of the drainage pipe in allusion to the actuality of the necessary pressurization test before being used. then analyze the computational results and figure out the variational rules of pressure and velocity with different leakage location while close water test or close gas test is applied

    本文針對無壓交付使用前必須進行嚴密性試驗的現狀,運用流體力學基本理論和三維非穩態紊流的有限體積模型,採用pheonics計算軟體,數值模擬不同徑下不同水點的情況,模擬閉水和閉氣試驗時內部的壓強場和速度場的變化,並分析計算結果,從中找出其變化規律。
  15. We have further knowledge in the leakage rule according to the numerical simulation on close water test and close gas test of pipes with free - surface, which will provide useful reference for close water test and close gas test of pipes with free - surface in the future

    本文利通過對無壓閉氣和閉水試驗的數值模擬,對閉氣和閉水試驗時的規律有了進一步的認識,為今後無壓的閉水和閉氣試驗提供一定的參考。
分享友人