管道跨越 的英文怎麼說

中文拼音 [guǎndàokuàyuè]
管道跨越 英文
pipe crossing
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 動詞1 (抬起一隻腳向前或向左右邁) step; stride 2 (兩腿分在物體的兩邊坐著或立著) bestride; stra...
  • : Ⅰ動詞1 (跨過; 跳過) get over; jump over 2 (超出) exceed; overstep 3 (昂揚) (of one s voice...
  • 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
  • 跨越 : stride over (a ditch, etc. ); stride across; leap over; cut across
  1. In the future development, exceeding to reach a company will follow the principle of " way of thinking innovation, mode innovation, management innovation, development innovation ", make people the center, overall, moderate and can keep on of development, actively walk new technique road, let the innovation accompany with the whole processeses of business enterprise development. pay attention to exertive brand advantage in the production the management, excellent turn industrial structure and product structure, with the decision, courage of " phoenix nie pan, bath fire rebirth " and the taste, intelligence of the globalization practical change growth way, at the realm realization of the two greatest industries of the manufacturing industry and servicing business cross over type development, move loudly ten thousand matter benefits is more brilliant with glorious new movement

    在未來的發展中,邁達公司將遵循「思路創新模式創新理創新發展創新」的原則,以人為本,全面協調可持續的發展,積極走新型技術路,讓創新伴隨著企業發展的全過程。在生產經營中注重發揮品牌優勢,優化產業結構和產品結構,以「鳳凰涅?浴火重生」的決心勇氣和全球化的眼光智慧切實轉變增長方式,在製造業和服務業兩大產業領域實現式發展,奏響萬事利更加燦爛和輝煌的新樂章。
  2. And results are : ( 1 ) analyze the force and distortion on pipeline under collapse and gulch in theory. on the base of beam deformation, analyze the bending moment and deformation of pipeline with frusta and without frusta. calculate a true problem, contrast the differences between pipeline with frusta and one without frusta, draw some conclusions

    得到的主要結果為: ( 1 )基於彈性地基理論和彈性梁的撓曲線理論,給出了在固定墩(相當河溝情況)和無固定墩(相當坍塌和沖溝情況)的變形微分方程,並分析了當量軸力為拉力或壓力時的變形和受力情況。
  3. Code for construction and acceptance of oil and gas pileline aerial crossing engineering

    石油天然氣管道跨越工程施工及驗收規范
  4. Design code for oil and gas transportation pipeline crossing engineering - aerial crossing engineering

    原油和天然氣輸送穿工程設計規范工程
  5. Standard for quality inspection and evaluation of petroleum construction engineering - pipeline crossing and aerial crossing project

    石油建設工程質量檢驗評定標準穿工程
  6. The shenzhen rainbow bridge is near to the northern railway station, which has big cut bag to span over twenty - nine tracks. arch bridge structure, which has a widely application these years, is taken considering of the bridge height limitation and the site used in downtown. the girder of the bridge is constructed with composite structure of steel and folding concrete slab

    深圳市彩虹大橋地處深圳火車北站,需29股火車軌徑大,又處於市中心,對橋梁的梁高有所限制,經研究分析,採用近年來廣泛應用的鋼混凝土拱橋橋型,梁體採用鋼- -混凝土疊合板組合梁組合結構。
  7. He was surprised at one of the guarded, a white woman, so easily evading this barrier.

    對這個受到看的人,一個白種女人,竟這么輕而易舉地了這界限,他不由得吃了一驚。
  8. The hsinchu science - based industrial park administration has been improving outside transportation links with the construction of an overpass over kuangfu road connecting to gpngdao fifth road in the north rood connecting hsip second road to the sun yat - sen freeway ; and a connecting route joining hsip first road and gpngdao fifth road in the north. these three newly completed roads have greatly improved traffic conditions at the hsip. a real - time traffic monitoring system was installed at the park in 2001

    在改善園區交通品質方面,新竹科學園區理局增設區內停車位,以解決區內停車問題至於聯外交通,園區北接公光復路陸橋工程已於89年完成,中山高園區二路專用工程於90年元月完工,園區一路北接公五30米聯絡路於90年10月通車,此三項新辟路工程,對園區交通紓解助益甚大,園區新設之路況即時監測系統亦已於90年11月完工啟用。
  9. Based on li jing, li jun vs chongqing mail electricity college, the author analyses the legal status of college, effectiveness of school regulation, relation between privacy of students and right of knowing of college, which bring society into hot debate. author expects the necessity and feasibility of educational administration legalization would be demonstrated adequately through research on it

    筆者以李靜、李軍訴重慶郵電學院一案為平臺,從教育行政法治的視角,對由該案引發的「高校能否成為適格的行政訴訟被告」 、 「學校能不能依據校規開除學生」以及「學校知情權與學生隱私權的關系」三大問題進行了詳盡的分析與闡述,以實例論證了學校內部行政理走向法治化刻不容緩,它是實現和擴大學校辦學自主權必須的一不低的門檻
  10. Because of its advantages in traversing the channels, with the development of the national economy, immersed tunnels will inevitably be used as the main means of traversing rivers, bays and seabeds. in the cities divided by rivers over bays, immersed tunnels have great superiorities in connecting the different parts

    由於沉上所具有的優性,我國隨著經濟的發展,必然將沉作為穿河流、港灣、海底的重要手段,在被河流港灣分割的城市,用沉聯系城市交通尤其具有優性。
  11. Taking zibo - qingdao natural gas pipeline engineering for example, starting with the present crossing river modes for gas transport pipeline, the main contents and methods of geotechnical engineering investigation for pipeline crossing river are put forward ; the existential geotechnical engineering problems and relevant countermeasures in the course of design and construction of this pipeline engineering ' s crossing river project are analyzed and evaluated ; the importance of geotechnical engineering investigation in the design and construction of long distance pipe lines is pointed out

    摘要以淄青天然氣工程為例,從目前輸氣河流穿方式入手,提出了穿河流巖土工程勘察的主要內容和方法,分析評價了淄博青島輸氣工程河流穿工程設計及施工過程中存在的巖土工程問題及相應的對策,指明了巖土工程勘察在長輸設計及施工中的重要性。
  12. At the same time, the ever - growing population, the resources shortage, and the daunting environmental pollution have made high rises, skyscrapers a trend. more over, concrete structures have become widely demanded in severe environments such as off - - shore petrol platform, cross strait bridge, under sea tunnels, drainage pipes, nuclear waste containers, nuclear reaction shells, poisonous chemical containers etc. all of the above mentioned buildings and structures require the use of cement based materials

    與此同時,在人口增長和資源短缺、環境污染的威脅下,建築物向著超高層化、超大化方向發展,各種嚴酷環境下使用混凝土結構也多,如:海上石油平臺、海大橋、海底隧、污水、核廢料容器、核反應堆外殼、盛裝有害化學物的容器等,如此眾多的建築物和結構都主要採用了水泥混凝土材料。
  13. In south to north gas pipeline project of zhongyuan oilfield, the gas pipeline crossing through yellow river applies suspension type

    摘要中原油田南氣北輸工程,其天然氣在經過黃河大堤處採用懸索式,懸索塔架的吊裝是該工程的重點。
  14. Article 19 the ferries, bridges or tunnels of urban roads which abut two administrative districts shall be managed jointly by both competent authorities or by one of them as designated by the superior authorities

    第19條(行政區渡口橋梁等之理)市區路之渡口、橋梁、隧兩個行政區域時,由雙方主機關協商共同理,或由上級主機關指定一方理之。
分享友人