節點站 的英文怎麼說

中文拼音 [jiédiǎnzhàn]
節點站 英文
node station
  • : 節構詞成分。
  • : Ⅰ名詞1 (液體的小滴) drop (of liquid) 2 (細小的痕跡) spot; dot; speck 3 (漢字的筆畫「、」)...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 節點 : [電學] panel point; hybrid; packing; node; nodal points; joint of framework; pitch point; point pitch
  1. Fourth, the paper treats two kinds of hoisting projects of high alititude construction in bulk and member assembly, hositing machine and plan layout, setting up scaffold and joints, and installing trunks, branches and joints etc. then in detail discusses the method which applys total station to measure three - dimensional coordinate of dendriform structure, including selecting survey sign points, creating survey system and converting survey coordinate system etc. the paper also deep research on the welding performance, welding method, welding process, welding stress and control, welding strain and rectification, weld defects analysis and weld quality inspection, and so on complicated heterogeneity steel weld proplems

    接著系統的論述了高空散裝法和分單元安裝法兩種樹狀結構吊裝方案,樹狀結構吊裝機械及平面布置,樹狀結構胎架及的搭設,以及樹狀結構樹干、樹枝和的吊裝工藝等諸多工藝問題。詳細的論述了採用全儀對樹狀結構進行空間三維坐標測量的方法,包括測量標志的選取、測量系統的建立及測量坐標的轉換等問題。深入地研究了樹狀結構可焊性、焊接方法、焊接工藝、焊接應力及控制、焊接變形及矯正、焊接缺陷分析及焊接質量檢查等復雜的異種鋼焊接問題。
  2. After this method is putted into practice, the number that total diagnosis nodes is thirty percent of the total grounding grid nodes. 110kv dianfa, 220 kv youting and 220 kv renhe substation grounding grid erosion optimized diagnosis experiments are done in practice

    採用優化的初步測量方法后,整個診斷所需的測量對數約為30 % .進行了典發110kv 、郵亭220kv 、人和220kv變電現場實測。
  3. Fieldbus is a kind of communication network which is a whole digitial communication multi _ embranchment data bus between intelligential field device and auto _ system. control system based on pcs ( fieldbus control system ) is a new kind of system which connect field control unit, field monitor unit, operation unit, communication interface uint with databus. lt integrates computer technology, communication technology and process cnotrol technology to adjust to demand of high standard productive control and enterprise management. lt developments and follows the advantage of traditional instrument control system and computer central control system and make up for their disadvantage so that it is applied in different industrial cnotrol area

    現場總線是連接智能現場設備和自動化系統的數字式、雙向傳輸、多分支的通信網路。它是一種能支持雙向、多、總線式的全數字通信網路。基於現場總線技術的控制系統是一種新型的控制系統,它採用總線方式將現場控制單元、現場監視單元、操作、通信介面單元連接起來,綜合了計算機技術、通信技術和過程式控制制技術,以適應現代高水平生產控制與企業管理的需要。
  4. The development of information service industry is very fast, so the city was designated as a city on trail of information popularity in the country, one of the three big junction stations of long distance call of guangdong, one of the four big cores of the internet

    江門市信息服務業發展迅速,被國家定為全國信息化試城市,是廣東省三大長途匯接中心之一,網際網路四大核心之一,視訊寬帶信息網路中心成為省的三大樞紐之一。
  5. Attribute expands access to a site - map node beyond the level of access that url authorization and file authorization grant. the following code example sets the

    屬性擴展了對地圖的訪問,使其超出了url授權和文件授權所準許的訪問級別。
  6. Sgsn 900 1800mhz tdma digital cellular mobile communication network test method of gprs general packet radio service base station system and serving gprs support node interface

    900 1800mhz tdma數字蜂窩移動通信網通用分組無線業務gprs基子系統與服務gprs支持
  7. Attribute in each node of the site map

    方法以便僅檢查地圖的每個中的
  8. Fifth, a monitoring center for guarantee of apec communications was set up to undertake round - the - clock real - time supervision, which included supervision of traffic flowing in exchanges that were installed in all meeting venues and key hotels ; supervision on tv signals ; supervision on the running of 82001 equipment ; supervision on the traffic of the shanghai internet node ; supervision on the traffic of the apec mirror site on shanghai hotline ; supervision on the status of the cdpd equipment ; supervision on the status of the adsl equipment and supervision on the status of the atm equipment

    第五,建立apec通信保障監控中心,實施2 4小時實時監控。包括對各場館、重要賓館交換設備的話務監測;電視信號監測; 82001設備運行情況監測;網際網路上海的流量監測;上海熱線apec鏡像網的流量監測; cdpd設備運行情況監測; adsl設備運行情況監測; atm設備運行情況監測,形成了一個縱觀全局的指揮平臺。
  9. Communication networks and systems in substations - part 7 - 4 : basic communication structure for substation and feeder equipment - compatible logical node classes and data classes

    變電的通信網路和系統.第7 - 4部分:變電和饋電設備用基本通信結構.兼容邏輯分級和數據分級
  10. ( 3 ) the optimized strategy analysis on retrieval of gps water vapor the optimized strategy analysis on retrieval of gps water vapor has been carried out under different data processing schemes by using gps observation. the parameters selection problem has been resolved in gps water vapor retrieval process such as the optimum number of adopted igs stations, the relation between single station processing and united station processing, network layout, cut - off angle, zenith delay parameter, period, knot position and so on

    ( 3 ) gps水汽反演優化策略分析利用gps觀測數據,使用多種數據處理方案,進行gps水汽反演優化策略分析,初步解決了進行gps水汽反演中引入igs的最佳個數、單解算和聯合解算的關系、網路布局、截止高度角、天頂延遲參數、時段長度、位置等選擇問題。
  11. The industrial park of west china shoes centre an is located in the bishan new town with mountainous surrounding by waters and elegant scenery, guarded the western gate of chongqing, with excellent geographic location, which is 30 km from the downtown area, 30 km from railway station, 6 km from chongqing university, 40 km from the ports, 50 km from the international airport, neighboring to chenyu free way, biqing express way, yushui free way, yuda free way and urban light rail jointing station

    中國西部鞋都工業園區就座落在依山傍水、風景秀麗的璧山新城,扼守重慶西大門,地理位置優越,距市中區30公里、火車30公里、重慶大學城6公里、港口40公里、國際機場50公里,緊鄰成渝高速公路、璧青高速公路、渝遂高速公路、渝大高速公路和城市輕軌節點站
  12. To identify the page that the node represents, and the site map provider that manages the node

    ,用於標識所代表的頁;三是地圖提供程序,用於管理
  13. To identify the page that the node represents, a title, and the site map provider that manages the node

    ,用於標識所代表的頁;三是一個標題;四是地圖提供程序,用於管理
  14. To identify the page that the node represents, a title and description, and the site map provider that manages the node

    ,用於標識所代表的頁;三是標題和說明;四是地圖提供程序,用於管理
  15. As the atom wiki states, the project creates " specifications for syndicating, archiving and editing episodic web sites. " i think that the defining characteristic of the domain atom addresses is not just web sites that are naturally broken into episodes, but also web sites that have a conversational nature through their interchange with other sites ; the episodes are often fueled by cross - reference to similar entries on other sites, and atom intends to be the glue for this interchange

    如atom wiki所宣稱的那樣,該項目要建立「連鎖、存檔和編輯情的規范」 。我認為, atom處理領域的定義特徵不僅僅是自然分解成情的web,還包括那些與其他交互中具有會話性質的web。情往往帶有對其他上類似實體的交叉索引, atom就是為了把這類交換粘結在一起。
  16. Displacement function means for calculating geostress in fem analysis of underground houses is used, based on crustal stress data of underground cavern of pump water station of tong guanshan yixing to store energy, applying the displacement function theory and 3d nonlinear fem, the thesis simulates a displacement field applied the boundary in engineering area and obtain the initial crust stress field through load function in ansys. the result shows that the error between regressed ones and actual ones is controlled in allowed limit and supply the important data for building and design

    根據宜興銅官山抽水蓄能電地下廠房區的地應力實測資料,運用位移函數法理論,採用三維非線性有限元計算方法,反演出施加在廠房區邊界上的位移場,藉助州sys有限元分析軟體,獲取模型邊界的坐標信息,然後通過ansys軟體的載荷函數將邊界位移程序化施加到模型邊界上,最後得到整個區域的初始地應力場,結果表明回歸后的地應力值與實測值接近,為地下工程的施工設計提供了重要的資料。
  17. Supervision and consultation projects completed : ( 1 ) jiangsu xindadou square ( 50, 000m2, two 30 - story buildings ), worked as chief supervision engineer ( consultation ) ; ( 2 ) " yanqiao overpass service center of xicheng highway ( the first overpass type service center on highway in china ), worked as chief supervision engineer ( consultation ) ; ( 3 ) the ninth 5 - year - plan updating technology project of huaiyin tobacco plant, 50, 000m2, worked as chief ( supervision and consultation ) ; ( 4 ) the softy testing, analysis and consultations of nanjing international conference and exhibition center, site - erected structure, 75m span steel roof truss ( the largest one in china ), worked as chief of test and consultation ; ( 5 ) " the consultation service of the testing, analysis and update technology of the reliability of the joints of intermediate floor slabs, beams and columns of base beam of sanshanjie station of nanjing metro " etc

    完成"江蘇新大都廣場( 5萬多平方米,二幢30層) "建設監理咨詢(總監) ; "錫澄高速堰橋跨線服務區(國內首座) "建設監理咨詢(總負責) ; "淮陰卷煙廠9 . 5技改項目( 5萬多平方米) "建築監理咨詢(總負責) ;主持了"南京國際會展中心75m跨鋼屋架(國內最大距)現場施工安裝結構安全性測試分析咨詢" ; "南京地鐵三山街中樓板及底板樑柱構造技術安全可靠性的測試分析與技術改進咨詢服務"等項目。
  18. To expose the hidden links, add to both site - map nodes a

    若要顯示隱藏的鏈接,請為這兩個地圖均添加一個
  19. A wireless ad - hoc network is a collection of mobile hosts with wireless transceiver. it is a multi - hop and instant self - organization network without the aid of any established infrastructure or centralized administration

    無線ad - hoc網路是由一組帶有無線收發裝置的移動主機組成的多跳、沒有固定基和中心的臨時性自治網路系統。
  20. Because the supply water system is large - scale, the pump stations are many, the ways of supply water are complicated, and the adjustable spare is large, the whole data in the optimization of supply water, the flux and its variety regulations in the control stations ca n ' t be acquired. the paper predicts supply water during the process based on the theory of artificial neural network control. the optimization has two steps

    在實際供水系統中很難準確地獲取整個管網的所有基礎數據,主要難以預知所有的逐時流量及其變化規律,因此成為供水系統的優化調度的難,本文採用人工神經網路對供水量進行預測,應用二級優化調度,第一級以整個供水系統的費用最小為目標,用回歸方法求出各供水的供水量;第二級利用流量跟蹤的方法對每個供水(泵)實現優化運行,以期在泵內達到最大能目的。
分享友人