簡單開孔 的英文怎麼說

中文拼音 [jiǎndānkāikǒng]
簡單開孔 英文
plain hole
  • : Ⅰ形容詞(簡單) simple; simplified; brief Ⅱ動詞1 (使簡單; 簡化) simplify 2 [書面語] (選擇人才...
  • 簡單 : 1 (不復雜) simple; uncomplicated; plain; simplicity 2 (平凡 多用否定式) commonplace; ordinary...
  1. Conclusions : in open operation for complicated posterior urethral stricture, cicatrical tissue can be completely and safely abscised without complication by using this appliance

    結論:在復雜性后尿道狹窄放手術中,使用后尿道鉆器鉆可充分切除瘢痕組織,且操作,安全微創,並發癥少,臨床效果顯著。
  2. The result is that this gas pool has simple structure, only forms a little nose - like structure at the district of fenghuangshan ; this pool belongs to delta front sub - facies sedimentary model, the underwater distributary channel and mouth bar is the better sedimentary microfacies ; the physical property of the reservoir is poor, the type of pore of the reservoir rock mostly are intergranular pore, intergranular solution hole and little are intercrystalline micropore ; the influential factors of pore structure and physical property are lithofacies, lithologic character and diagenesis ; the off - take potentia of all the testing well are deadly shortness, the wells have the worth of industrial recovery only under the condition of going through sand fracturing, and in the early of binging into production, the oil and sheath pressure drop rapidly, the production of the well drop rapidly

    研究認為該氣藏構造,只在鳳凰山形成了一個小型的鼻狀構造;屬於三角洲前緣亞相沉積模式,水下分流河道和河口壩是有利的沉積微相;儲層物性差,儲層巖石的隙類型主要有粒間、粒間(內)溶及少量晶間微;影響蓬萊鎮組氣藏儲層隙結構及儲集性的因素有巖相、巖性條件及成巖作用;所有測試井自然產能都極低,必須經加砂壓裂后才有工業采價值,且投產初期,油套壓下降較快,氣井產量下降迅速。
  3. It is not just simply one stone piled on to top of another, they ' re joined together, this hole in the arch on here that ' s been pounded out using stone hammers, and that originally fitted on the top of that stone

    因為巨石並不是地堆疊在一起,而是被巧妙地連接在一起:石塊拱起部分的眼是用石錘出來的,它原來剛好可以套住頂上另一塊巨石的石楦。
  4. Abstract : artifical intelligence methods are implemented to simulate thebehaviors of axially and laterally loaded piles using the field observation tests data obtain ed f rom the drilled shafts and driven piles. the optimal neural network model is deve loped using only simple input data of spt - n values and piles ' geometrical featu r es etc. the analysis for r. c piles of some projects is performed adopting the bp n n and grnn models respectively, and the obtained predicated results are compared w ith the data from conventional design method. it demonstrated the obvious advanta ges of neural networks in the design of pile foundations over the traditional me thods. this paper has an important practical significance and a referential worth iness in the design of pile foundations

    文摘:根據鉆樁和打擊樁的原型試驗觀測的數據,運用人工智慧方法對橫向承載樁和軸向承載樁的工作特性進行模擬,並利用標準貫入試驗( spt - n )值和樁的幾何特性等的輸入數據,發出相應的優化神經網路模型;然後,運用反向傳播神經網路模型和廣義回歸神經網路模型分別對某工程的鋼筋混凝土樁進行分析,並將求得的預測結果與常規設計法的結果進行比較,結果表明神經網路方法比傳統方法有明顯的優越性,在實際工程設計中具有重要的參考價值和現實意義。
分享友人