粘土墻 的英文怎麼說

中文拼音 [nián]
粘土墻 英文
clay wall
  • : 粘動詞(粘附) glue; stick; paste; adhere to; bond
  • : 名詞(磚、石等築成的屏障或外圍) wall
  1. Frame columns inset the filler - wall, avoided the influence that the comer of the room columns outstanding to indoorses view and take up the using space. at the same time, this structure has some advantages as the frame structure, such as arranging neatly, comparting easily etc., deeply welcoming by inhabitant and real estates company, is a building structure system that have the vast development foreground and satisfying the request of green building ". current, the reinforced concrete special - shaped columns structu re system lacks the actual measuring data of earthquake damage and the comprehensive aseismic performance of structure system, the structure system not yet is included in the national code, needing the thorough research

    鋼筋混凝異型柱結構體系,採用t形、 l形、十形截面柱代替傳統的矩形截面柱,以輕質材料製作的框架填充代替自重較大的磚填充;框架柱隱于內,避免了屋角柱楞突出對室內觀瞻及佔用空間的影響,同時,又具有框架結構布置靈活、易於分隔的優點,深受住戶及房地產開發商的歡迎,是一種滿足「綠色建築」要求並具有廣闊發展前景的建築結構體系。
  2. The results of field observation showed that mucky clay in the shore slope of the wharfs was the stratum with the most obvious horizontal displacement and most of the pile heads close to the retaining walls inclined towards the land to different degrees, agreeing well with the inclination of pile heads as observed on site

    原型觀測結果表明:碼頭岸坡內的淤泥質層為水平位移最明顯層,靠近擋的大部分樁頂都出現了不同程度的向陸側傾斜,這與實際見到的樁端傾斜狀況完全相符。
  3. Six of the houses so far unearthed measured about 250 square feet ( 23 square meters ) each and had wooden walls and clay floors

    已發掘出的6座房屋中每座佔地約23平方公里,有木製壁和地板。
  4. Hada mountain embankment dam is located at strong motion earthquake area with 7 degree. it is a sand - fill dam with clay core, stability of the dam under earthquake and the preventive of foundation liquescence is very important for the dam design

    哈達山壩是位於七度地震區,坐落在厚覆蓋層上的砂殼壩,壩體的抗震穩定、基礎的抗震液化是本工程的技術關鍵問題。
  5. Clay bricks have been forbidden in most cities, which require the appearance of new wall block

    磚在我國大部分地區已禁用,迫切要求新的體材料的出現。
  6. By adoption of a series of construction techniques, such as doka sheathing board pasted with finland board, affixing double - sided gum at the bottom of the sheathing board, controlling depot exterior with angle steel, and mending fissures with epoxy resin putty, the quality of as - cast - finish concrete can meet the requirement of construction anti good technical effect can be achieved

    通過採取多卡模板外貼芬蘭板、模板底口貼雙面膠、角鋼控制收倉面、環氧樹脂膩子補縫等一系列的施工技術工藝,使清水混凝施工達到預期質量要求和工藝效果,滿足了設計要求。
  7. In the project of jingyuan garden, a national model project for comfortable residence constructed by us, new technologies including dipy framework system, composite external wall, etc are adopted, especially aerated concrete block enclosure structure is adopted for large areas, which has a great demonstration significance in replacing clay brick and with regard to wall restructuring

    在我們承建的國家康居示範工程景元花園項目中,採用了帝枇模網結構體系,復合式外等新技術,特別是大面積採用加氣混凝砌塊圍護結構,在替代磚和體改革方面具有極大的示範意義。
  8. Earthworks and foundation engineering ; diaphragm wall clays for supporting liquids ; requirements, testing, supply, inspection

    方和基礎工程.支承液體用橫隔.要求試驗
  9. The retaining wall reclining on the slight slope built on soft foundation is usually used in protecting the shore of river, the contradiction between the lack of impartiality in stress of the base and the small stress allowed by the foundation as well as the lack of stabilization of the breast wall is a hard nut to crack in the engineering. in the paper, a tenon - base is added under the base of the retaining wall, on the study of the choice of the parameters and formulas used in calculation and the research of theory used in calculation, method used to deal with the load, etc, the writer gives a way to crack the nut mentioned above paragraphs and presents a qualitative and quantitative analysis about them, such as the equivalent inner friction - angle ( d ) and the passive press of the clay ( ep ), etc. in the end of the paper, using modern optimization method, a design of the retaining wall reclining on the slight slope built on soft foundation is done, the result is economical, and accords with the fact

    軟基上的仰斜式擋在水利工程河道護岸中經常遇到,仰斜式擋基底偏心應力較大和軟基地基容許承載力偏小的矛盾以及擋抗滑穩定不足是工程中難以解決的難題。本文在對仰斜式擋設計中有關計算參數的選擇、公式的選用應該注意的問題進行了研究,對河道護岸軟基礎上的仰斜式擋採用凸榫基礎處理的方法,就其計算理論、設計驗算中各荷載的具體處理方法進行了較為細致的研究,提出了解決軟基礎上的水工仰斜式擋難以解決的難題的方法,並對有水情況下等效內摩擦角_ d 、凸榫被動壓力e _ p等在計算中的取值提出了定性和定量的分析。最後利用現代優化方法對軟基礎上的水工仰斜式擋進行了結構優化設計,得出了符合實際的結果,與其它重力式擋形式進行比較,取得了明顯的經濟效益。
  10. The nancha suspending - gay bridge of the changjiang road - bridge in jiangshu runyang, with a main span of 1490m, ranks first in china, third in the world. the north rivets, only 250m from the main stream of changjiang, have a tight liaison with the waterpower of it. especially, in this area, the face of rocks undulates a lot and exist fault - fabric. the soil there has apparent difference with the trend of water. the base - hole of north rivets can be named a super - deep one, with a 60m length, 50m widths, and 48m depths. the fence of the base takes advantages of the rectangular underground continuous wall structure and succeeds

    江蘇潤揚長江公路大橋南汊懸索橋,主跨1490m ,居中國第一,世界第三。該橋的北錨碇距長江幹流僅250m ,與長江水力聯系密切,錨碇區水文、地質情況復雜,表層淤泥質及松軟層較厚,基巖頂面起伏較大,且存在斷裂構造,層具明顯的流變特性。北錨碇基坑為長60m 、寬50m 、深48m的矩形超深基坑,其基礎圍護在國內首次採用矩形地下連續結構,並獲得成功。
  11. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地水利樞紐工程,由於該工程河床覆蓋層深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩基的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即水平鋪層防滲方案、防滲方案及瀝青心防滲方案的靜態應力位移及壩體在竣工期、蓄水期等各個階段可能產生的破壞進行了認真研究。
  12. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心和壩基防滲的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝防滲與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對和壩基垂直防滲方案、瀝青混凝和壩基垂直防滲方案以及斜心和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝防滲的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝防滲不同彈性模量對體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  13. Elementary introduction of construction of yunlong reservoir clay core rockfill dam

    淺談雲龍水庫堆石壩施工
  14. There are many main buildings in the plant such as concrete - faced rockfill darn, the second darn with clay core, spillway, diversion tunnel, surge tank, ground workshop and switch mom etc

    電站的主要建築物有砼面板堆石壩、二壩、溢洪道、引水隧洞、調壓井、地面廠房和開關站等。
  15. So far as the mixing material for building the earth - rock fill dam with clay core for shiquanhe hydropower station is concerned, the effect from the variation of the sand content for the filter material on the maximum dry density and the relevant parameters are to be determined within the variation area of the mixing mass ratio of ( 46 ~ 54 ) : ( 54 ~ 46 ) through this experiment, due to the max, dry density is largely influenced by the mixing ratio of both the lifter material and the clay and the sand content of the filter material, so as to determine the actual filling compactness of the mixing material of the core

    摘要由於獅泉河水電站石壩摻合料的最大幹密度受反濾料與料的摻合比例、反濾料含砂率的影響較大,因此擬通過本試驗確定摻合質量比在( 46 ~ 54 ) : ( 54 ~ 46 )范圍變化時,反濾料含砂量變化對最大幹密度的影響程度及相關參數,從而確定心摻合料填築的實際壓實度。
  16. Before 1988 the outer walls of architectures in beijing are single outer walls made of clay bricks

    這里是建築節能標準執行以前,建築物普遍採用的
  17. Buildings made of air blocks react sensitively to factors effecting crack. under same conditions, the blockworks of building crack worse than wall made of clay bricks and crack types are also more complicate. purpose of the thesis : from the reasons of crack, crack development, domestic and overseas theories on crack, i make a deep research on crack

    砌塊體與普通體開裂的現象有相當的一致性,又有其特殊性,由於砌塊建築對影響開裂的因素反應更為敏感,在相同情況下,砌塊建築體開裂的程度比體要嚴重,裂縫的類型也比較復雜。
  18. The proportions and performances of plastic concrete of some cut - off walls at home and abroad, the proportion of self - congealing slurry used in the cut - off wall of third stage cofferdam of three gorges project, mechanics properties of expansive soil slurry and harden clay mortar, and proportions of hardened slurry are introduced

    列舉了國內外部分防滲工程塑性混凝基本配合比及性能參數;國內自主研發的自凝灰漿體材料及應用於三峽工程三期圍堰防滲的配合比;固化灰漿、膨潤漿的物理力學性能及固化灰漿採用不同制攪方法時的配合比。
  19. Based on the known theoretical research at home and abroad, common theories of earth pressure and their adaptabilities are discussed in this paper, and emphases are put on the methods of earth pressure calculation and checking of strength and stability for retaining walls with balancing platform, especially under the condition of cohesive filling soil and over loading

    本文基於國內外擋壓力理論研究現狀,對常用壓力理論及其適應性等進行了論述,重點分析與探討了衡重式擋壓力計算方法,特別是對其上、下背、后填及存在超載等情況下的壓力計算、身強度與穩定驗算方法等進行了研究。
  20. The development tendency of non - clay wall materials in hangzhou is strong

    杭州非粘土墻材發展勢頭強勁
分享友人