系柱 的英文怎麼說

中文拼音 [zhù]
系柱 英文
bollard cleat
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  1. The effect of gypsum on improving basified soil - soil column made by completely mixing gypsum with soil

    石膏與土全部混勻的土
  2. Effect of gypsum on improving basified soil soil column made by applying fixed quantity gypsum to basified soil surface

    堿化土壤表面施用定量石膏的土
  3. The old lady made one end of the silk thread fast to tom s tooth with a loop and tied the other to the bedpost

    老太太把絲線的一頭打了活結,牢牢地在湯姆的那顆牙上,另一頭在床上。
  4. The ongoing total refurbishment programme began in 1998 for buses that reached five years of age. all passenger facilities will be replaced with brand new ones. the refurbished buses are fitted with additional hand poles and bell pushes, new electronic route number display and improved lighting

    完成翻新的巴士,均安裝了額外的扶手和落客鐘掣、新式的電子路線路線號碼牌和改善了的照明統,部分巴士更重髹了車身色彩。
  5. The ongoing total refurbishment programme began in 1998 for buses that reached five years of age. all passenger facilities will be replaced with brand new ones. the refurbished buses are fitted with additional hand poles and bell pushes, new electronic route numbers display and improved lighting

    完成翻新的巴士,均安裝了額外的扶手和落客鐘掣、新式的電子路線路線號碼牌和改善了的照明統,部分巴士更重髹了車身色彩。
  6. In this paper, the relation between differential driven ratio accuracy and the common normal length error of cylindrical bevel wheel has been found by experimental method, which provides a efficient way for cylindrical bevel wheel manufacturer to control the common normal length error of the wheel

    摘要通過實驗研究,尋找出差動傳動比的精度與斜齒圓齒輪的公法線長度誤差的關,從而為斜齒圓齒輪的加工提供一個可以控制斜齒圓齒輪公發線長度誤差的有效方法。
  7. The firth chapter is " other questions of designing of the " dehong " ", it makes a study of of its bitt - towing - power - experiment and the layout of signal equipment according the property of salvation. directed by dr. shi xin

    主要針對「德宏」輪的救助特性,對系柱拖力試驗、救助船技術要求、信號設備布置等問題,進行了分析和探討。
  8. Double riding bollards with foundation plate

    帶基板的雙纜樁
  9. Inland navigation vessels - flat bollards

    內河航行船舶.平直
  10. Double bollards with foundation plate

    帶基板的雙纜樁
  11. Inland navigation vessels - flat bollards ; german version en 14965 : 2005

    內河航行船舶.平直.德文版本en 14965 - 2005
  12. The natural bornite has stains and spots on the surface, showing a beautiful picture against a golden yellow background. yunnan tea is finely made, good in quality, and has a good assrtmnent. popular products include dianhong, dianliu, puercha, tuocha and qizhibing. the city of spring plants many varieties of flowers all the year round. now total number amounts to 400

    在雲南民族村裡,吉祥的傣寨白塔,壯觀的白族大理三塔,高聳的彝族圖騰,源遠流長的納西東巴文化,佤族的木鼓布朗族的婚俗基諾族的太陽鼓拉祜族的蘆笙舞奇特的摩梭人母社會形態驚險的傈傈族上必杜活動以及風趣的亞洲群象表演,精美獨特的民族風味美食,會令您陶醉其中,流連忘返。
  13. Auto parts : fuel injection system ( valve follower, plunger piston and fuel injection needle, etc. ), power train ( gear, rolling bearing etc. ), piston parts ( packing ring, gudgeon pin etc. ), cam shaft parts ( pin, bush, oscillation beam and some hydraulic components etc. ), others ( gate lock, accouterment etc. )

    汽車零部件:燃料噴射統(氣門挺桿) 、塞、噴油針等) 、動力傳動統(齒輪、滾動軸承等) 、活塞部件(活塞環、活塞銷等) 、凸輪軸部件(銷、襯套、搖臂及部分液壓元件等)和其他部件(如門鎖、內飾等) 。
  14. The author suggests that the three lithosphere - scale faults, lancangjiang fault, jinshanjiang - ailaoshan fault and axis fault in the middle of the basin, are the main geological structures that control the formation of basin, magmatism and metallogenic congregate district. the anticline structure with an axis of triassic strata and the related fault system within the basin, and gonglang arch - shaped folding structure in the south of the basin are the geological structure controlling the formation of ore fields. junctions of two or more faults with different orientation, interlayer cataclastic structural zone and oxidation - reduction ( redox ) boundary were the favorable position for the formation of ore bodies

    認為瀾滄江斷裂、金沙江-哀牢山斷裂及盆地中軸斷裂這三條巖石圈斷裂是主要的控盆-控巖(巖漿巖)構造及礦集區尺度的控礦構造;盆地中以三疊為軸的背斜構造及相關的斷裂統、盆地西南緣公郎弧形構造等是礦田尺度的控礦構造;多組斷裂的交叉、層間破碎帶及地層中的氧化還原界面是形成礦體的有利部位。
  15. Methods of test for ancillary components for masonry - part 5 : determination of tensile and compressive load capacity and load displacement characteristics of wall ties couple test

    圬工輔助成份試驗方法.第5部分:拉伸和壓縮負載容量和墻系柱和負載代替特性測定
  16. Methods of test for ancillary components for masonry - part 6 : determination of tensile and compressive load capacity and load displacement characteristics of wall ties single end test

    圬工輔助成份試驗方法.第5部分:拉伸和壓縮負載容量和墻系柱和負載代替特性測定
  17. Methods of test for ancillary components for masonry - part 7 : determination of shear load capacity and load displacement characteristics of shear ties and slip ties couplet test for mortar joint connections

    圬工輔助成份試驗方法.第7部分:拉伸和壓縮負載容量和墻系柱和負載代替特性測定
  18. For bollard type clamps the 200 mm will subsequently be referred to as the apparent test length, and includes the length of lace in contact with each bollard

    對于系柱類型的夾具而言,這200毫米在下文被稱作表觀試驗長度,它包括與每個系柱相連的鞋帶的長度。
  19. Contrast with the results, the dissertation concludes that the axial loads of column have no essential variation, the variations of moments and shear forces of column are small under horizontal loads in contrast with the structure system in elastic ground, the moments and shear forces variation of column cannot be neglected, and the structure system with different foundation have the close degree variation

    通過對比分析,本文認為水平力作用下交錯桁架體系柱的軸力基本不變,彎距及剪力響應數值變化不大。豎直荷載作用下,與彈性地基計算結果比較,彎矩及剪力均存在不可忽略的變化,且不同形式基礎其影響的程度基本相近。
  20. 5 ) the method to calculate the natural periods of staggered truss with sshsti with raft - pile foundation is decided, and the natural periods of staggered truss with column foot fixed and sshsti with raft - pile foundation are calculated and investigated

    5 )明確了計算地基及樁筏基礎共同作用時固有周期的計算方法,計高層鋼結構交錯析架體一與地基基礎共同作用研究算研究了交錯析架體系柱腳固定時和地基及樁筏基礎共同作用時體的各個固有周期。
分享友人