系桿 的英文怎麼說

中文拼音 [gǎn]
系桿 英文
binder lever
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : 桿名詞(桿子) pole; staff
  1. Design of half - through steel pipe bowstring concrete arch bridge of long - span, and knowledges to it

    大跨度中承式鋼管系桿混凝土拱橋設計和體會
  2. The results indicate that fiber grating strain sensors are able to monitor the tension status about reinforced concrete bowstring arch bridge effectively

    應用結果表明:光纖光柵測力傳感器可有效監測鋼管混凝土系桿拱橋系桿的受力狀況。
  3. Analysis on fracture of steel skein used for wire rope of bridge tie bar

    橋梁系桿鋼索中鋼絞線斷裂情況剖析
  4. Telecommunication and power current overhead lines below 1 kv ; tie bar, wall plate, lifting eye nut

    1kv以下通信線路和電力架空線.系桿.墻板和吊耳螺母
  5. Construction technique of pressure filling concrete to still pipe inner arch of 75m span tie bar arch bridge

    系桿拱橋鋼管拱內混凝土的壓注施工工藝研究
  6. This paper presents the structural design of the main bridge of lhasa river bridge, makes a deep - going study of the key techniques for design of the bridge, such as the reasonable span length ratio of each span of the 5 - span girder and arch hybrid structure, mechanical behaviour of the dual arch ribs, and section of the continuous girder tie beam, and also works out rigidity and stress conditions of the continuous girder tie beam and stress conditions of the concrete - filled steel tube arches of the main bridge

    摘要介紹了拉薩河特大橋主橋結構設計情況,對於五跨梁拱組合橋梁各孔跨合理的跨度比、疊拱的受力行為及連續梁系桿截面形式等設計中的關鍵性問題進行了深入的研究,給出了主橋連續梁系桿的剛度和應力情況、鋼管混凝土拱的應力情況。
  7. Tie rods unified threads for aircraft

    航空用系桿
  8. New architecture is provided for the strutural form of single rib trunk section bowstring arch bridge with major span and lower strutural high, nd i organized the first such type of design project

    提出了適用於較大跨度、較低結構高度的單肋箱形截面系桿拱的結構形式,並已組織完成了首項設計。
  9. This paper is mainly concerned with the structural characteristics and research process of fiber grating strain sensors, successful applications of strain sensors in the bowstring arch bridge, particularly the tie bar cable replacement

    文中介紹光纖光柵測力傳感器的結構特點和研究過程,及其在系桿拱橋換索施工中的成功應用。
  10. By emptying the above mentioned theoris and conclusions, this paper introduces detailedly the whole process of the compare and selection of cangzhou city gongrong road canal bridge ' s plan, design calculation and check of structure. the internal force calculation of the bridge adopts the program of plane member system ( bricas ), and it was checked by the program of brcad

    本文最後應用上述理論和結論,以大量篇幅詳細介紹了滄州市光榮路運河橋(下承式鋼管混凝土系桿拱橋)從方案比選到結構設計和計算、驗算的全部過程,以及施工中的要點,本橋內力計算採用平面有限元計算程序, (交通部公規院的《橋梁設計綜合計算程序》 ( bricas4 . 0 ) ) ,並採用空間有限元程序( brcad2 . 0 )進行驗算。
  11. Only 1, 000, 000 vehicle crossings produced significant cracking in the floor beams of the tied arch span and in the plate girders of the approach spans.

    僅通過1,000,000輛車就在系桿拱的橫梁中以及引橋的板梁中造成明顯的開裂。
  12. Construction monitring for steel tube concrete arch bridge

    鋼管混凝土系桿拱橋施工監測
  13. Then, a thorough discussion and sum ? p about the main construction process of cfst tied ? rch bridge without wind bracing is presented in the paper in association with the construction practice of the bridge. in addition, the author put emphasis on the static calculation of two point integral hoisting construction method in single cfst arch rib. futhermore, the stabilization of arch rib in construction and service stage are analyzed detailedly

    本文結合該大橋的施工實踐,對無風撐鋼管混凝土系桿拱橋的主要工藝施工流程進行了全面論述和總結,並重點對單片鋼管拱肋兩點整體吊裝的結構受力進行了靜力計算及對拱肋在施工和運營階段的穩定進行了分析。
  14. Lateral buckling load of tied - arch bridges with transverse braces

    有橫撐系桿拱橋的側向穩定承載力
  15. Abstract : non - plank construction method of bottom - supported tied arch bridge makes possible of uninterrupt or short time in terrupt of navigation, having very high social and economic benefits

    文摘:下承式系桿拱橋無支架施工可以做到通航河流的不斷航或少斷航,具有很大的社會、經濟效益。
  16. In this paper, the stubble, rust of tie bars and destruction forms of anchorage device are considered equivalent to the loss of tie bars ’ sections which is the analysis parameter of this paper

    本文將系桿的斷絲、銹蝕及錨具等破壞形式等效為系桿截面的損失。
  17. The curve of arch rib, rib section bending, splice of rib sections, seperator of tube, bracing plates, bracing system, meeting of arch, concrete pumping, hangers, tie - rods, the tower of the cable crane and the guy ropes, technical specifications of cfst arch bridge are discussed

    對鋼管混凝土拱橋的拱軸線選用、鋼管節段彎制、節段拼接、管內分隔倉、綴板設計、聯結繫統、合龍設計及其細節、管內混凝土的泵送、吊系桿、纜索吊機與扣索塔架、技術規范等12個問題進行了探討。
  18. Asymmetric construction of steel pipe concrete arch rib tied arch bridge

    鋼管混凝土拱肋系桿拱橋不對稱施工
  19. Construction of main arch ribs in half - through reinforced concrete tied arch bridge

    中承式鋼筋混凝土系桿拱橋主拱肋施工
  20. Construction technique of back pouring of tie rod arch bridge arch rib steel pipe concrete

    鋼管混凝土系桿拱橋拱肋混凝土倒注施工技術
分享友人