約束樁 的英文怎麼說

中文拼音 [yāoshùzhuāng]
約束樁 英文
restrained pile
  • : 約動詞[口語] (用秤稱) weigh
  • : Ⅰ動詞1 (捆; 系) bind; tie 2 (控制; 約束)control; restrain Ⅱ量詞(用於捆在一起的東西) bundle;...
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • 約束 : keep within bounds; restrain; bind; bound; boundage;tie; restraint; restriction; engagement; repr...
  1. Engineering measures for pre - consolidation and treatment of cut soft foundation with high pressure jet grouting pile or anti - slide pile are presented, together with engineering measures for consolidation of inclined soft embankment foundation with gravel pile and lateral restrained pile, and the methods of design, construction are also introduced in detail. 6

    提出了高壓旋噴或抗滑預加固整治塹軟基的工程措施;提出了採用碎石和側向約束樁加固傾斜基底路堤軟基的工程措施,並對設計、施工、檢測進行了詳細介紹; 6
  2. Controlled blasting method applied to demolishing underground reinforced concrete pile shaft is presented according to specific circumstances of drilling machine and outside restraint, especially including attention of drilling, charging and initiating etc

    介紹了地下鋼筋混凝土體的控制爆破方法,以及在鉆孔設備及外界較特殊的情況下,鉆孔、裝藥及起爆等方面的注意事項。
  3. Abstract : controlled blasting method applied to demolishing underground reinforced concrete pile shaft is presented according to specific circumstances of drilling machine and outside restraint, especially including attention of drilling, charging and initiating etc

    文摘:介紹了地下鋼筋混凝土體的控制爆破方法,以及在鉆孔設備及外界較特殊的情況下,鉆孔、裝藥及起爆等方面的注意事項。
  4. The top beam can reform the force - bearing mechanism of the retaining piles because the cantilever piles can be fixed by adding a restriction on the top of the piles and the displacement of the piles can be reduced too. as the same time, top beam can harmonize the displacement and force of the piles and avoid the phenomenon of chain failure as one of the piles is destroyed. if the top beam are closed it can work well because the support on the two ends

    頂圈樑對支護的作用主要體現在:改善支護的力學性狀,變懸臂為頂端的超靜定狀態;對頂位移起限製作用,減小基坑工程對周邊環境的不良影響;協調各之間的受力和位移,避免局部受力過大引起各之間的連鎖破壞現象。
  5. ( 5 ) the governing object function and two boundary condition : settlement and foundation bearing capacity are developed in the optimization design of the pcc pile composite foundation

    ( 5 )建立了pcc復合地基優化設計的目標控制函數和兩個條件:沉降控制條件和承載力校核條件。
  6. To solve this problem, in this paper, the internal force in the constraint conditions are modified when the height of section changes

    為解決這一問題,本文將條件中的彎矩和剪力設計值隨截面高度的變化加以修正。
  7. However, the pre - stressed anchor cables on the upper part of the piles make the whole stabilizing system like freely supported beams or some other h yperstatic structures. with the number of restraints increasing, it makes much easier to control the displacement of the piles and to reduce the bending moments and shearing forces along the piles to a certain extent

    增加預應力錨索后,整個結構體系接近簡支梁或其它超靜定結構,隨著的增加身的位移控制變得容易許多,同時身內力值也在一定程度上減少較多。
  8. The objective function is the cost of anti - slide pile " s per meter ; the constraint conditions are the strength of anti - slide pile " s normal section and inclined section, the ratio of reinforcing design and the size of section in the design code ; the design variables are the height of section, the area of reinforcement and the amount of hoop. and the optimization model is solved by 0. 618 method

    本文提出的優化設計方法,以單位長度的總造價為目標函數,以規范對單筋梁的正、斜截面強度,配筋率及截面尺寸等要求為條件,以截面高度,抗彎縱筋面積,抗剪箍筋數量等為設計變量,來建立優化模型,並用0 . 618法進行求解。
  9. ( 3 ) optimization design principle of long - short - pile composite foundation is put forward, base on which replacement ratio and pile length is taken as design variable, bearing capacity, settlement, stratum strength and other demands acted as constraint function, pile cost taken as objective function, so the optimization design model of long - short - pile composite foundation is built

    ( 3 )提出了長短復合地基優化設計原理,在此基礎上將置換率和長作為設計變量,承載力、沉降、下臥層強度等要求作為函數,總制費用作為目標函數,建立出長短復合地基優化設計數學模型。
  10. Application of jason logging constrained inversion on the prediction of channel oil - gas - bearing sand - bodies in the no. 106 massive pool

    測井反演在106地區河道含油氣砂體預測中的應用
  11. It discusses the influence factors of pile groups effect, such as pile space, pile number, pile diameter, pile length and soil parameter etc. subsequently, using linear interpolation function to approximate the soil ' s anti force to piles, the article combines p - y curves with pole system fem. in this way, a new pile - soil interaction element calculated model is designed, the pile - soil interaction element stiffness matrix is deduced, and establishes finite element equation of p - y model, writes the relevant finite element program with matlab language, calculates and analyses pile groups subjected to lateral loads with engineering examples

    隨后,本文將p - y曲線法與桿系有限元法相結合,採用線性插值函數來逼近土對反力,得到新的?土相互作用的單元計算模型,推導了?土相互作用的單元剛度矩陣,建立了p - y模型的有限元求解方程,用matlab語言編制了相應的p - y曲線有限元法計算程序,進行橫向承載的計算分析。
  12. And the best scheme among them has been proposed. in the last, with design opt of ansys, assigning roof plate ' s and base plate ' s thickness as design variables, making them meet the constraints of displacement of roof plate and base plate, and assigning the maximum stress of the structure as the goal function, the pile - boots structure has been optimized

    最後利用ansys自帶的優化求解器designopt ,以對靴結構強度和變形影響較大的頂板和底板厚度為設計變量,在滿足重要部件?頂板和底板豎向位移的條件下,把結構的最大等效應力設為目標函數,採用一階優化方法,對靴結構進行了優化設計,並得到了最優解。
分享友人